X5/GIF Test Beam: High Rate Analysis Manuela Cirilli.
Zentralabteilung Forschungsreaktoren Contents - The German FRJ-2 Research Reactor - Operation and Decommissioning - Distribution of Neutronflux and activity.
F October 4, 2001David Finley to FARDOG at FermilabSlide 1 Status of X-Band Structures Fabrication Our First X-Band Structure Progress of RF Factory at.
Presented by: Matthew Schantz Travis Heffernan Physics 43, SRJC 5/12/08 Younes Ataiiyan.
E. Kako (KEK) Webex Meeting in May 24th, 2011 1 Status and Disassembly Plan of S1-G Cryomodule.
LOS Absorption Presentation for TCS Group Rupal S. Amin Tuesday, August 26, 2008 LIGO-G080428-00-L.
Searching for gravitational waves with lasers Rick Savage Caltech LIGO Hanford Observatory - Richland, WA.
The Heavy Ion Fusion Virtual National Laboratory UC Berkeley Christophe S. Debonnel 1,2 (1) Thermal Hydraulics Laboratory Department of Nuclear Engineering.
LIGO-G000193-00-M Status of LIGO Barry Barish PAC Meeting - LHO December 12, 2000.
Low Energy RHIC e - Cooling Meeting Notes 1 –LF Solenoids & HF (Matching) Solenoids: Out for bid??? –20 o Dipole Magnet gap is 4 inches/transport lines.
The LHC Machine
LCGT Vacuum System 120123 VAC (YS) 1 1. Overview Items ** two beam tubes of 3-km long and 800 mm in diameter ** optical baffles distributed at every 12.