Integration OF RF STRUCTURES IN THE two-beam module design
Experimental Physics and Industrial Control System (EPICS) Database Bob Dalesio, June 27,2001.
Can we optimise the clean up process further ?
E- Cloud Machine Studies-Systematic Study of Single Bunch Tunes I. Pinger timing effect on single bunch tunes II. Vertical/horizontal pinger high voltage.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
IPBSM status and plan ATF project meeting M.Oroku.
Alejandro G. Sosa a [email protected] ( BE-BI-PM ) WP 2 , ESR 3
Measurement of the neutron detection efficiency of the KLOE calorimeter P.Gauzzi (Universita’ La Sapienza e INFN – Roma) for the KLONE Group 10 th ICATPP.
M.Anelli, G.Battistoni, S.Bertolucci, C.Bini, P.Branchini, C.Curceanu,
Work foreseen in UJ-TZ76
First Data from the TOTEM experiment at LHC