Overview of the BLM families at collimators Matti Kalliokoski Joint CWG/BLMTWG Meeting 25/08/2014.
BEAM LOSS MONITORS FOR CLIC 24/NOV/2011 S. Mallows, E.B. Holzer, J. van Hoorne, (BE/BI), CERN.
LHC Ramp Commissioning Mike Lamont Reyes Alemany-Fernandez Thanks to: Stefano, Verena, Walter.
1 BROOKHAVEN SCIENCE ASSOCIATES Introspection Control System Group – Bob Dalesio presenting EPICS Meeting May 2, 2009.
NML Machine Protection System (MPS)
Dr. José Miguel JIMENEZ CERN, Technology Department 14 Feb’14 1 FCC Kick-Off 2014 Geneva, Switzerland FCC Kick-Off 2014 Dr. José Miguel JIMENEZ CERN, Technology.
MP Issues from Collimation and Impact from Upgrades
LHC Control System Tutorial for the FNAL LARP group
RWA, GSI 11/07 Beam Loss and Collimation at the LHC R. Assmann, CERN/AB 15/11/2007 for the Collimation Team GSI Beschleunigerpalaver.
Beam Loss Monitors at LINAC4
Beam Loss Monitoring
Linear Collider Beam Instrumentation