WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
Possible irradiation needs from CERN and requirements (a partial and selected view) M. Calviani (EN/STI)
Engineering Department ENEN Screwed solutions for the new tertiary collimator jaw assembly Federico Carra (CERN EN/MME) Geneva, 4 th September 2014 4th.
PS/SPS Days O. Aberle/ R. Losito for the ATB Group 18 th January 2006
PS Booster Energy Upgrade K. Hanke for the PSB Upgrade WG CERN MAC 26-28 April 2010
beam intercepting devices for LINAC 4
HI gh RAD iation to MAT erials Facility as Test Bed for Phase-II Collimators
Status Report, ENTM 02/11/2010 BEAM INTERCEPTING DEVICES FOR LINAC 4.