SCU Magnetic Measurement System Design and SCU0 Measurement Results Charles L. Doose Engineering Specialist ASD/Magnet Devices DOE Lehman CD-2 Review of.
SPX - Cavity WBS U1.02.01.02.05, U1.03.03.05, U1.03.03.12 Genfa Wu SRF Scientist Accelerator Systems Division/RF Group DOE Lehman CD-2 Review of APS-Upgrade.
Beam Stability WBS U1.03.02.02 and SPX Diagnostics WBS U1.03.03.08 Glenn Decker Group Leader APS Accelerator System Division Diagnostics DOE Lehman CD-2.
SPX Controls System WBS U1.02.01.03.04 (R&D) WBS U1.03.03.04
SPX Controls System WBS U1.02.01.03.04 (R&D) WBS U1.03.03.04 Ned Arnold Computer Systems Engineer AES Division/Computer Systems DOE Lehman CD-2 Review.
SPX High Level RF and RF Interlock Systems WBS U1.03.03.01 Doug Horan RF Systems Engineer Accelerator Systems Division/RF Group DOE Lehman CD-2 Review.
SPX – Timing and Synchronization WBS U1.03.03.03 WBS U1.02.01.03.03 Frank Lenkszus Senior Electronics Engineer AES/Controls DOE Lehman CD-2 Review of APS-Upgrade.
Superconducting Undulators WBS: APS-U1.03.04.03 Yury Ivanyushenkov Physicist, SCU Project Technical Leader ASD/Magnetic Devices Group DOE Lehman CD-2 Review.
Benjamin Stillwell Mechanical Engineering Specialist
Superconducting Undulators WBS: APS-U1.03.04.03
Long Straight Sections WBS U1.03.02.01
Beam Stability WBS U 1.03.02.02 and SPX Diagnostics WBS U 1.03.03.08