Demand forecasting of Cadbury
E166 Collaboration Meeting Princeton, 22-24 May 2006 e+ Analyzing Power K. Peter Schüler e+ Analyzing Power: what we know from old G EANT 3 simulations.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. Of Energy 1 An Overview.
A N DY Status Commissioning with colliding beams (p +p at s=500 GeV)
20/05/06 Special requirements for Photosources operating at PV electron scattering exp. International Workshop PAVI 2006 Milos Island 20/05/2006 by Kurt.
Building a Green Laser Source via Second Harmonic Generation Diana Parno (dparno@cmu)
The A N DY Project
Today’s topics; New A N and A NN results at s = 6.9 GeV
A N DY RHIC Run-12 Status/Proposed Goals L.C. Bland, BNL RHIC Spin Collaboration 13 Jan 2012.
Special requirements for Photosources operating at PV electron scattering exp.
Spin Physics With PHENIX
Measurement of Forward Jet A N at AnDY