LOW ENERGY HIGH POWER SIDE COUPLED LINAC OPTIMIZATION Vittorio Giorgio Vaccaro, Francesca Galluccio, Naples University Federico II and INFN, Napoli Dario.
ILC Project Hitoshi Yamamoto Tohoku University Rencontre de Vietnam August 13, 2013, Qui Nhon.
Tunnel Gallery Girders 5 6 7 9 10 11 12 13 14 15 1 x ADC’s HV Power supply Rack 095 8 channels digitizer VME module (SIS3300), 12 bits acquisition @ 96.
PhD project: Development of a Ferrite-Loaded Accelerating Cavity CERN Supervisor: Dr.-Ing. Christine Völlinger TEMF Supervisor: Prof. Dr.-Ing. Harald Klingbeil.
Is a Carbon Nanotube Field- Emission Electron Source on an Upgrade Path for HIGS? Thomas B. Clegg February 2, 2004.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, 2005 1 The RF Power Coupler Development Program at LAL-Orsay and.
Solid Target R&D Programme Colliding the proton beam with a dense target is currently the only known way to produce enough muons for the neutrino factory.
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
Module 4 Anatomy of a linear accelerator Linac technologies RF parameters and measurements 1.
Raphex 2012.pdf
Future Linear Colliders
Impedances and Wake Fields: They are forty, but they don’t look it Vittorio Giorgio Vaccaro Università degli Studi di Napoli “Federico II” and INFN Sezione.