1 Nb Sputtered Cu QWR: a 20 years experience from an idea to the routine beam acceleration A.M. Porcellato S. Stark V. Palmieri F. Stivanello.
Overview
SPS 200 MHz RF Upgrade
Neutrino Factory Workshop, IOP, 28th October 2003
WP12 Innovative RF Technologies
News, plans, wrap-up -- CLIC workshop, Febr . 5 th 2014--
PART II: Cyclotrons for radioisotope production
Pressure distribution calculations for the PETS system and the accelerating structure
Vector Modulator AMC board
Electromagnetic field simulations for accelerator optimization
WP12 Management Report & EuCARD-2 Updates
LEP3: A high Luminosity e + e – Collider in the LHC tunnel to study the Higgs Boson