Report - Performance of the ATLAS RPC detector and Level-1 muon ... · Front End discriminator thresholds scan ⊛ ATLAS RPC detectors are planned to operate until ˘ 2040 ⊛ At HL-LHC (L

Please pass captcha verification before submit form