Report - 1 NON TECHNICAL SUMMARY 1.1 INTRODUCTION ... 20/110 kV. • Construction and operation of underground transmission lines (110 kV) of 4.47 km from the Project Substation to the (existing)

Please pass captcha verification before submit form