ZTE iRail Solution on HSR
• Oct. 20th , 2014
• Yang Jun
• Vice President of ZTE
Agenda
Amazing Rail Development in China
16 Years Story of ZTE iRail
Vacation With Parents
© ZTE Corporation. All rights reserved.
My work place
My hometown is here
1200km
© ZTE Corporation. All rights reserved.
Car Speed :
Sometimes, I tried to drive.
Comfort :
12 Hrs to reach home
© ZTE Corporation. All rights reserved.
Airplane Speed :
Sometimes, I chose to fly and then transfer to intercity bus line.
Comfort :
2Hrs Before Departure+2Hrs Travel+2 Hr Bus Transfer= 6Hrs
© ZTE Corporation. All rights reserved.
Train Speed :
This used to be my last choice: • Only one train per day • Difficult to get a ticket • Too crowed inside coach
Comfort : 10+ Hrs Journey
© ZTE Corporation. All rights reserved.
CRH Speed :
My first choice now:
It can take me home
within 3.5 hours.
It even allows me to
work during the trip. Comfort :
Agenda
Amazing Rail Development in China
16 Years Story of ZTE iRail
Vacation With Parents
© ZTE Corporation. All rights reserved.
Six Speed-up Campaign from 16 years ago
140 160 160 160
200
250
380
54.9 55.2 60.3 61.6 65.7 70.18 80
0
50
100
150
200
250
300
350
400
1997 1998 2000 2001 2004 2007 2014
Top operational train speed Average operational train speed
Sp
eed
(km
/s)
9
© ZTE Corporation. All rights reserved.
6 hours
8 hours
12 hours
24 hours
1-8 Hours Economic Area via HSR
Beijing
Shanghai
Guangzhou
Hong Kong
Chengdu
Xi’an
© ZTE Corporation. All rights reserved.
Unimaginable High-efficiency
10%
19% 8%
61%
CHN USA RUS Others
2,903 Bln Ton/km
1060 Bln Passenger/km
33%
27%
22%
18%
11
Operation Mileage Gross Turnover Volume
10% operation mileage bears 33%
gross turnover volume!
© ZTE Corporation. All rights reserved.
Decisive Factors of Rail Transport Success
12
Enjoyable travelling experience is highly required.
The basic and the first requirement of rail transit.
Adjustable train operation timetable make profit.
First consideration for passengers travelling.
Agenda
Amazing Rail Development in China
16 Years Story of ZTE iRail
Vacation With Parents
© ZTE Corporation. All rights reserved.
iRail Solution Case Study
14
E-MSTP for CCTV
Qinghai-Tibet line, the
highest railway
Tianjin metro
Beijing, Guangzhou,
Shenzhen metro, support
for Beijing Olympic, Asian
Games, Universiade
Great Engineering
Integrated ICT
Vietnam railway 3
routes & 1 junction
Chongqing LRT
IP based telcomm: NGN, FTTx
Beijing–Kowloon railway
Haerbin-Dalian HSR
Zhengzhou, Suzhou metro
Shanghai-hangzhou HSR
Hanzhou metro
Wenzhou metro
LTE for HSR, metro
GSM-R for CTCS, ETCS
Nanning-Guangzhou HSR
Nigeria warri railway
2007 1999
2005 2009
2013
2014
© ZTE Corporation. All rights reserved.
iRail – ICT Infrastructure of Intelligent Rail
CCTV with intelligent analysis
Smart maintenance
Man less Level crossing
Safety
Cloud-based architecture
Emergency coalition response
Trans-platform applications
Flexibility Enjoyable trip with ZIFI
Easy access from E-Ticket
Integrated PIS/DAS/PAS
Comfort
Fast developing GSM-R
Emerging LTE for Rail
High-speed mobility solution
Efficiency
ZTE iRail Solution
15
© ZTE Corporation. All rights reserved.
ICT Infrastructure is Crucial to HSR
Communication and information service
•MSTP, video conference and surveillance.
•PIS, telephony, PA, Call center, online booking.
Signaling and Train Control system
•CTC, CBI, Point machine, signal…
•CTCS/ETCS
Track and Station Construction
•Rail, sleeper, overhead contact line, station…
•Bridge, culverts, tunnel…
Rolling Stock
•Train, carriage, metro, urban railway, Monorail..
•High speed train..
The cost of ICT system is little, but it’s very important.
© ZTE Corporation. All rights reserved.
Looking Forward to the Future!
iRail V1.0
GSM-R MSTP FTTX NGN
iRail V2.0
Broadband TWC LTE for Rail Rail Ecosystem
Smart operation and maintenance
© ZTE Corporation. All rights reserved.
Partner • Professional
• Trustworthy
• Cooperative
• Open Speed :
Comfort :
Thank You
http://enterprise.zte.com.cn
www.zte.com.cn
Top Related