UNIVERSITY OF PADOVA
XVI Summer School "Francesco Turco“ Impianti Industriali Meccanici
Abano Terme (Padova, Italy) - 14-16 September 2011
ING-IND/17 Research Team
Alessandro Persona
Full Professor
+39 320 4347366
Daria Battini
Assistant Professor and Researcher
Mauro Gamberi
Associate Professor
+39 0444 998735
Vicenza
XVI Summer School "Francesco Turco“ Impianti Industriali Meccanici
Abano Terme (Padova, Italy) - 14-16 September 2011
Assistant Professor and Researcher
+39.0444 998735
Maurizio Faccio
Assistant Professor and Researcher
+39 049 8276796
Fabio Sgarbossa
Assistant Professor and Researcher
+39 049 8276796
Anna Azzi
Ph. D. student
+39 0444 998756
Giorgia Zanin
Ph. D. student
+39 0444 998756
Padova
TEACHING ACTIVITY
Ingegneria Meccanica
(Sede Padova)
Laurea Triennale
Laurea Magistrale
Ingegneria Meccanica
(Sede Vicenza)
Laurea Triennale
Mecc/Mct
Laurea M Innovazione del Prodotto
Laurea M Meccatronica
Ingegneria Gestionale
(Sede Vicenza)
Laurea Triennale
Laurea Magistrale
XVI Summer School "Francesco Turco“ Impianti Industriali Meccanici
Abano Terme (Padova, Italy) - 14-16 September 2011
Impianti meccanici
3°anno
6 u.c.
ImpiantiMeccanici
3°anno
6 u.c.
Impianti Industriali
1°anno
6 u.c.
Logistica
Industriale
2°anno
6 u.c.
Impianti meccanici
3°anno
9 u.c.
Logistica del prodotto
1°anno
9 u.c.
Gestione degli
impianti industr.
2°anno
9 u.c.
Impianti meccanici
3°anno
9 u.c.
Impianti Industriali
1°anno
9 u.c.
Logistica Industriale
2°anno
9 u.c.
Ph.D. School in “Mechatronics and Product Mechanical Innovation Engineering”Head prof. Alessandro Persona
8 scholarships/year
450 students – 208 hrs lectures
24 total CFU
170 students – 234 hrs lectures
27 total CFU
350 students – 234 hrs lectures
27 total CFU
RESEARCH TOPICS N.1
PRODUCTION SYSTEM DESIGN
Framework for productivity and ergonomics improvement in assembly system design
ERGONOMIC ASSEMBLY
SYSTEM DESIGN
XVI Summer School "Francesco Turco“ Impianti Industriali Meccanici
Abano Terme (Padova, Italy) - 14-16 September 2011
RESEARCH TOPICS N.1
PRODUCTION SYSTEM DESIGNPRODUCTION & ASSEMBLY
SYSTEM DESIGN
Assembly system analysis and design
Mixed Model assebly line balancing and sequencing Mixed Model multi feeder assembly line design and
balancing
XVI Summer School "Francesco Turco“ Impianti Industriali Meccanici
Abano Terme (Padova, Italy) - 14-16 September 2011
Buffer trend before and after the design procedure
Line
performance
before and
after the design
procedure
RESEARCH TOPICS N.1
PRODUCTION SYSTEM DESIGNFEEDING PROBLEM IN
ASSEMBLY SYSTEMS
Optimal Centralization/Decentralization Degree of Component Inventory and Optimal Feeding
System in an Assembly System
XVI Summer School "Francesco Turco“ Impianti Industriali Meccanici
Abano Terme (Padova, Italy) - 14-16 September 2011
INNOVATIVE TECHNIQUES
FOR MATERIAL MANAGEMENT
Consignment stock inventory model in an integrated supply chain
Single-vendor multi-buyer
XVI Summer School "Francesco Turco“ Impianti Industriali Meccanici
Abano Terme (Padova, Italy) - 14-16 September 2011
LOGISTICS
Order and batch picking problem
Analytical formulation Picking in AS/RS systems
Sistema AS/RS Dual-Shuttle
XVI Summer School "Francesco Turco“ Impianti Industriali Meccanici
Abano Terme (Padova, Italy) - 14-16 September 2011
SUPPLY NETWORK
DESIGN AND TRANSPORTS
Bissingen-Castiglione dS
Meeder-Bologna
Meeder-Collecchio
Meeder-Novara
Meeder-Soliera
Meeder-S. M. di Zevio
Rudolstadt-S. M. di Zevio
Schesslitz-Collecchio
Schrozberg-Castiglione dS
Ca
ric
o -
Sc
ari
co
Costo Combinato Costo Stradale
Transportation network design. Parametric modelling of freight networks. Internal and external cost
estimation. Intermodality. Sustainability.
- 200 400 600 800 1,000 1,200
Ansbach-Castiglione dS
Ansbach-Collecchio
Bissingen-Castiglione dS
€
Ca
ric
o
XVI Summer School "Francesco Turco“ Impianti Industriali Meccanici
Abano Terme (Padova, Italy) - 14-16 September 2011
RESEARCH TOPICS N.1
PRODUCTION SYSTEM DESIGN
Healthcare logistic network development:
a system dynamics framework
HEALTH CARE LOGISTICS
hospital 1
hospital 2
Healthcare
Drugs/materialsSuppliers
Area Vasta:
group purchasing organization
wards beds
•Beds number per ward•Average beds occupation•Beds occupation standard deviation•Average bed daily consumption (drugs/materials/consumer items)
Sustainable supply chain network:
closed loop vs forward structure
Case 1 “Traditional company perspective”
XVI Summer School "Francesco Turco“ Impianti Industriali Meccanici
Abano Terme (Padova, Italy) - 14-16 September 2011
hospital n
HealthcareLogistic HUB
Case 2 “Socially responsible company perspective”
RESEARCH TOPICS N.1
PRODUCTION SYSTEM DESIGNTRACKING AND TRACING
MES SYSTEMS
Methodological framework to implement tracking and tracing by RF-ID
XVI Summer School "Francesco Turco“ Impianti Industriali Meccanici
Abano Terme (Padova, Italy) - 14-16 September 2011
1. Definition of industrial and management requirements.
2. Identification of project conditions (PCs).
3. Identification of project variables (PVs).
4. Evaluation of technological alternatives.
5. Sensitivity analysis of different alternatives.
6. Economic evaluation of different alternatives.
7. Strategic evaluation of different alternatives.
8. Choice of the best alternative.
Systemability Approach Spare Parts Management
TOTAL PRODUCTIVE
MAINTENANCE
Innovative Maintenance Concepts: Systemability and Novel Spare Parts Management
Drive-Chain (left) and Gear (right) Reliability: Systemability vs Work Data Set
Optimal Replacement Policy under Random Environments
XVI Summer School "Francesco Turco“ Impianti Industriali Meccanici
Abano Terme (Padova, Italy) - 14-16 September 2011
In collaboration with prof.
Pham - Rutgers University
RESEARCH TOPICS N.1
PRODUCTION SYSTEM DESIGN
Hydraulic/thermal Plant
Technical and economical Design
Fresnel lens
AUXILIARY PLANTS
ANALYSIS AND DESIGN
Solar energy conversion
prototyping
XVI Summer School "Francesco Turco“ Impianti Industriali Meccanici
Abano Terme (Padova, Italy) - 14-16 September 2011
Economical evaluation on the feasibility of each plant with the assessment of the Net Present Value and the Payback Period
NPV & PbPevaluation
Solar cell m-j
Heat exchanger
Analysis and Design Prototyping
-€ 8.000,00
-€ 6.000,00
-€ 4.000,00
-€ 2.000,00
€ 0,00
€ 2.000,00
€ 4.000,00
€ 6.000,00
€ 8.000,00
€ 10.000,00
€ 12.000,00
€ 14.000,00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Titolo Anni
VAN
TOP 10 PUBBLICATIONS
last 5 years (2006-2011)
Authors Title Journal/Conference Year-Vol-PP.Research
Topic
Battini, Faccio, Persona, Sgarbossa
Balancing-Sequencing Procedure for a Mixed Model Assembly System in Case of Finite Buffer Capacity
International Journal Advanced Manufacturing Technology
2008, Vol.44 No.3-4 , pp. 345-359
1
Gamberi , Manzini, Regattieri
Simulink simulator for building hydronic heating systems using the Newton–Raphson algorithm.
Energy and Buildings2009, Vol. 41, pp. 848 - 855.
2
Battini, Faccio, Persona, Sgarbossa
A new methodological framework to implement an RFID project and its application
International Journal of RFTechnologies: Research and Applications
2009, Vol. 1, No.1, pp.77-94
3
Battini, Faccio, Persona, Sgarbossa
New methodological framework to improveproductivity and ergonomics in assembly system design
International Journal of Industrial Ergonomics
2011, Vol. 41, No. 1, pp. 30-42 4
Azzi, Battini, Faccio, Innovative Travel Time Model For Dual-Shuttle
XVI Summer School "Francesco Turco“ Impianti Industriali Meccanici
Abano Terme (Padova, Italy) - 14-16 September 2011
Azzi, Battini, Faccio, Persona, Sgarbossa
Innovative Travel Time Model For Dual-Shuttle Automated Storage/RetrievalSystems
Computers & Industrial Engineering
2011, In Press5
Battini, Gunasekaran, Faccio, Persona, Sgarbossa
Consignment Stock inventory model in an integrated supply chain
International Journal of Production Research
2010, Vol. 50, No.5-8, pp.775-788,
5
Battini, Faccio, Persona, Sgarbossa
Design of the optimalfeeding policy in an assembly system.
International Journal ofProduction Economics
2009, Vol. 121, No. 1, pp.233-254
5
Azzi, Battini, Persona, Sgarbossa
Decreasing Network Complexity with Logistics Outsourcing: An Entropic Approach
International Journal OfProcurement Management
2010, Vol.3-4, pp. 339-360
6
Faccio, Persona, Sgarbossa, Zanin
Multi-stage supply network design in case of reverse flows: a closed-loop approach
International Journal ofOperational Research
2011, Vol. 12, No 2, pp. 157-191
6
Azzi, Battini, Faccio, Persona
Variability-oriented assembly system design: a case study
in the construction industry
Assembly Automation2011, In Press 7
Research Topics – Ing/Ind-17
1 2 3 4 5 6 7
Production system
analysis and design
Auxiliary plant analysis
and design
Processes and production
technologies
Ergonomics and safety of
industrial systems
Production system
management
Logistics Production system
automation
RESEARCH PROJECT
INDUSTRIAL PARTNERS
last 4 years (2007-2011)
Project Year Area Description
FSU 2011 3 Development of low energetic consumption technologies, employment of low environmental impact
materials and implementation of new systems designed for food safety and product quality
FSU 2009 3 Development of low energetic consumption technologies, employment of low environmental impact
materials and implementation of new systems designed for food safety
PRIN 2008 6 Drug distribution process optimization and critical events traceability
UNIPD 2008 6 Logistic package systems design: innovative models and tools
RESEARCH PROJECTS (2007-2011): PUBLIC FUNDING
XVI Summer School "Francesco Turco“ Impianti Industriali Meccanici
Abano Terme (Padova, Italy) - 14-16 September 2011
�GENERALI GROUP (Mogliano V.to)
�SAMO (Verona)
�AFV (Vicenza)
�POZZOLI (Milano)
�TVS (Urbino)
�LEGNOPAN (Piovene Rocchette)
�EME GROUP (Arsiè)
�POLO FREDDO (Padova)
�STORTI INTERNATIONAL (Verona)
�COMEM (Vicenza)
�FAVINI (Bassano)
�ACC (Pordenone)
�ROVAGNATI (Monza)
�TONON40 (Oderzo)
�COVE (Vicenza)
�MAINCONSULTING (Rovigo)
�METALSTAMPO (Vicenza)
�CAME (Casier-Treviso)
�UNO PIU’ (Viterbo)
�HAVI LOGISTICS (Bomporto - MO)
�FITT GROUP (Vicenza)
�GRUPPO VERONESI (Verona)
�MARCOLIN (Longarone)
�SONEPAR (Padova)
�GRUPPO MASTROTTO (Vicenza)
�GRUPPO GABRIELLI (Padova)
�AERMEC (Bevilacqua VR)
�PEDROLLO (San Bonifacio VR)
�LINZ (Arcole)
�SISMA (Schio)
�SACME (Schio)
�COMETE gioielli (Vicenza)
�ARSS (Venezia)
�CEG (Rimini)
�ALPEGO (Vicenza)
�ACC (Hungary)
RESEARCH INDUSTRIAL PROJECTS: STRUCTURED PARTNERS (2007-2011)
Top Related