WIND ENERGYCASE STUDY
1. THE CHALLENGE
2. SOLUTION
3. CABLES SUPPLIED
4. VALUE ADDITION
The Challenge
• Powering the controllers and transmitting the controlling signals to the wind towers.
• Transferring operational signals from the towers to the control room.
• Transmitting the power generated to the converters.
• Transmitting power from the converters to the junction box.
• Control and operation of various modules in the tower.
The Lapp Solution
• Hassle-free cables for increased productivity
• OLFLEX CLASSIC Cables for compact machines
• UNITRONIC LiYCY Cables to prevent data aattenuation
• Application specific cables
Cables Supplied
• Equipped with safety features, cables are a great ROI
• Wide range of cables to suit any cabling requirements
Value Addition Click icon to add picture
Sample image
THANK YOU FOR YOUR ATTENTION
Know more at www.thelappstore.com
Top Related