Weekly HSE ReportSite: - PTP KURLA Date: - 24/4/12
PLL | 1
1 Training Details:Sr.
No.
Date Contractor No. of
Participants
Time of
Training Total Hrs
1
20/4/12
Damani
Topic: Use of PPE during scaffold erection.
06 10min 1 hr
2
20/4/12
Damani
Topic : Use of PPE during scaffold erection.
04 10min 40min
3 19/4/12
Topic :Safety Precaution during lifting the
load, Lifting tool Tackle & Mini crane safety
04 15min 1 Hr.
4 17/4/12Specialized Trg By Mr. Waghela on Fire
Fighting Installation16 90min 24Hrs
Safety Induction Nil = 0 Min. ( Hrs.)
Safety Mass Talk (00 no) = 0 Min . ( Hrs.)
Safety Tool Box Talk (03 nos) = 160Mins. (2hrs 40min.)
Specialized Training (01) = 1440 mins (24Hrs.)
2 Accident Statistics: No Major Accident at Site.
3 Kaizen:
8/2/2019 weekly report 16 to 21 Apr12[1]
2/5
Weekly HSE ReportSite: - PTP KURLA Date: - 24/4/12
PLL | 2
Before After Location Remarks
a)
D Bldg
south side,
Central
Man Enclosure Gate
provided to Lift shaft
b) D Bldg
Central
core
Steel Railing installed
Fire shaft
.
c)
Earlier railing was not done D Bldg
south side
Steel Railing done to A
shaft
d) Earlier railing done but
removed by fininshing agency D Bldg.
south side.
Plumbing shaft railin
done.
8/2/2019 weekly report 16 to 21 Apr12[1]
3/5
Weekly HSE ReportSite: - PTP KURLA Date: - 24/4/12
PLL | 3
e) D Bldg
North side
Electrical shaft railing
done.
f) Third Party Inspection Of
MINI crane :
Cont : A K Enterprises
D Bldg.
Terrace
Level
Mini crane Third Part
inspection done.
g) Edge barrication
Earlier Camp edge barrication
not done.
D Bldg
South side
Labor
camp
Railing done for edge
barrication.
h) HK audit & operational
control audt done at Ashok
garden site & report alreadysent to HO.
HOUSEKEEPING.a) D Bldg.
south side
campUnwante debris ,steel
accumulated
8/2/2019 weekly report 16 to 21 Apr12[1]
4/5
Weekly HSE ReportSite: - PTP KURLA Date: - 24/4/12
PLL | 4
b) D Bldg.
south side
camp
waste generated in ca
area need to be remov
c) D Bldg.1stfloor
Lobby area
North side
POP waste generated to be clean
d)
D Bldg.
2 nd floor
Lobby area
North side
POP waste generated
to be clean
e) D Bldg 1st
2nd floor
North
West side
Debris filled with bags
pieces accumulated on
floor.
f)
8/2/2019 weekly report 16 to 21 Apr12[1]
5/5
Weekly HSE ReportSite: - PTP KURLA Date: - 24/4/12
PLL | 5
D Bldg.
North East
corner 2nd
floor
Marble , tiles cut piec
stored on floor area.
f) D Bldg.
near
sevalal
Store 1st
floor
Large amt of Marble, t
cut pieces accumulate
floor
Pending HSE Issues:
a) Inspite of several time instruction A.H.U. Shaft , Fire shaft barricationremoved for fishing work & not reinstalled again.
b) Labours working without Induction training
Agency : ORETH , SEVALAL, Aman const,AK construction.