Outline
• Introduce the WTAC
• Watershed Scale Approach to Restoration
• Application to Acid Impacted Watersheds
• Breather
• Watershed Scale Approach to Mitigation
• Application to the MTM/VF Conflict
WVWRI and WTAC
• The goal of the Water Research Institute is to generate water research that supports State environmental policy initiatives.
• WTAC complements efforts of the NMLRC
• The goal of the Watershed Technical Assistance Center is to facilitate application of science-based, watershed scale approaches to stream restoration and mitigation.
Ecological Restoration• Assisted recovery of ecological structure and
function to ecosystems that have been degraded or destroyed.
Ecological Mitigation• Replacement of lost ecosystem structure and
function resulting from development activity.
Watershed Restoration: Problems and Opportunities
Extensive legacy impacts to rivers throughout the state.
Problems are so extensive that all impacts cannot be fixed at once.
Need to prioritize actions to meet watershed scale objectives (e.g., recovery of productive fisheries).
Produce efficient, broad scale benefits to WV watersheds.
8 digit
12 digit
10 digit
Segment Scale
Relevant Spatial Scales
Site Scale
SCALE ACTIONS
6-8 HUC (Cheat – Mon River)
Watershed Master Plan “Families”; Restoration goal to maximize fishery recovery at this scale (“Region”)
10-12 HUC (Muddy Creek – Lower Cheat River)
Key scale of planning and coarsest scale of prioritization; Watershed Restoration Master Plans (“Neighborhood”)
Reach (Lower Muddy Creek)
Scale of predictive modeling and Eco-currency calculation; finer scale prioritization (“House”)
Site Location(Mine portal)
Scale of remediation action and finest scale of decision making (“Plumbing”)
Relevant Spatial Scales
Stream Data•Water Chemistry•Temperature•Instream Habitat•Biological communities•Ecosystem processes
GIS-based Watershed Model
Watershed Restoration Master Plan
• 5 year plan• Priority implementation sequence• Expected costs and fisheries benefits• General guidance regarding reclamation
project designs
Landscape Data•Land Cover•Geology•Drainage Networks•Mine Data•Expected Development•Mine pool elevations
Monitoring & Assessment• Assess progress towards implementing
the master plan
Fishery / Ecological Priorities•Priorities to maximize recovery of coldwater and warmwater fisheries (EcoUnits).
•Reach scale and subwatershed (10-12 digit HUC) scale priorities.
•Points to stream segments where recovered fisheries are possible, and if recovered, would be highly valuable.
Reclamation Priorities•Action-by-action priorities needed to recover fisheries priorities.
• Implementation of at-source, in situ, and instream reclamation actions.
•Maximize cost:benefit efficiency.
Reclamation Design• Detailed engineering design of priority
reclamation projects
Project Implementation• Construction of priority reclamation
projects
Stakeholder Input
EcoUnit Concept= a measure of the functional significance of a measurable unit of stream (length or surface area).
***scalable from stream segment to whole watershed
***weighted based on “restorability”
Examples:
Coldwater Fishery EcoUnit = stream length (m) weighted by its value as habitat for brook trout spawning and juvenile recruitment (Petty and Thorne 2005).
Warmwater Fishery EcoUnit = stream surface area (km2) weighted by its value as habitat for smallmouth bass (Merovich and Petty 2007).
Organic Matter Processing EcoUnit = stream length (m) weighted by its value in converting coarse particulate organic matter to biomass.
Biological Diversity EcoUnit = stream length (m) weighted by its value in supporting diverse aquatic communities.
EcoUnits and Watershed Scale Planning
Petty, J. T., and D. Thorne. 2005. An ecologically based approach to identifying restoration priorities in an acid-impacted watershed. Restoration Ecology 13:348-357.
Developed a coldwater fishery EU to conduct a cost:benefit analysis of various limestone sand remediation alternatives in the upper Shavers Fork watershed.
Merovich, G. T., Jr., and J. T. Petty. 2007. Interactive effects of multiple stressors and restoration priorities in a mined Appalachian watershed. Hydrobiologia 575:13-31.
Developed an invertebrate diversity EU to assess the benefits of AMD treatment as an alternative offset to impacts from thermal effluent to the Cheat River mainstem.
Poplar-Jeffers, I. and J. T. Petty. 2007. Culvert replacement and stream restoration: application to brook trout management in an Appalachian watershed. Restoration Ecology (IN PRESS).
Applied the coldwater fishery EU to identify culvert replacement priorities and assess the benefits of culvert replacement as a form of mitigation for road related impacts to streams.
EcoUnit Recovery Alternatives in the Upper Shavers Fork of the Cheat River
WPRA = fn (expected brook trout spawning intensity given stream size, location, and gradient; expected juvenile survivorship given alkalinity and aluminum concentration) (in units of meters)
Cost of various restoration alternatives
Benefit in terms of coldwater fishery EU recovery
Cost : Benefit Ratios over time
EcoUnits and Use of Culvert Replacement as Mitigation
Watershed Scale Culvert Replacement Program for the Cheat River watershed
•Strategy based on a brook trout ecological unit (WPRA).•Over 200 km WPRA isolated above 127 culverts.•Total cost of restoration = $6-8 Million.•Twenty culverts isolate 50% of WPRA at a cost of $500K to restore.•Objective mitigation currency.
“Recoverable” CW and WW Fishery EcoUnits in the lower Cheat River.
CWEU = fn (value as trout habitat given water temperature, habitat complexity, water quality, benthic invert diversity)
WWEU = fn (value as smallmouth bass habitat given temperature, gradient, water quality and benthic invertebrate biomass)
in units of km2
Restorability: likelihood of achieving conditions needed to support a fishery
=fn (stream size, geology, mining intensity)
Reach Scale Restoration Priorities and Restoration Package C:B Analysis
Reach ID
Basin Area (km2)
Stream Length
(m)
RestorableCWEUs
(m)
36194 49.9 3524 1054
35207 29.6 2645 782
38987 36.9 3209 616
39925 27.0 2153 580
33486 33.9 1680 569
36029 22.7 1916 434
30763 13.0 3446 430
43882 25.7 1547 398
39387 29.8 1263 376
44296 16.5 2284 376
41891 21.0 1742 366
RP1 RP2
Cost 1,000,000 500,000
Benefit 1452 1010
C:B 689 495
Lower Cheat River Restoration and Monitoring Plan.
Planning and Design Cost:$100,000
Implementation Cost:$2,800,000
Annual Maintenance Cost:$170,000
Expected EU Recovery:185 km2 WW Fishery
Cost / EU / year:$156 / EU / year (over 20 years)
Annual Monitoring Cost:$30,000
Benefits of Watershed Scale Perspective to Restoration
Framework for establishing measureable, human use related goals for restoration (recovered warm and coldwater fisheries).
Stream by stream restoration is ineffective (McClurg et al. 2007).
A little bit of planning at a watershed scale can produce broad-scale benefits with minimal costs.
Documenting watershed scale benefits is more efficient than monitoring the effectiveness of multiple projects.
The Mitigation Problem
Extensive alteration of headwater systems from surface mine development
Best available technologies are used to mitigate for necessary environmental impacts.
Mitigation effectiveness in recovering lost headwater functions is unclear.
Headwater Functions:•Water and sediment retention
•Nutrient uptake and cycling
•Organic matter retention, processing, and conversion to biomass
•Habitat for invertebrate and vertebrate organisms
•Supply of processed material to downstream ecosystems
Headwaters = Ephemeral / Intermittent / Small Perennial Streams
Headwaters are the “kidneys” AND the “digestive system” of the riverine ecosystem.
Mitigation = replacement of lost ecosystem structure and function resulting from development impacts.
The Mitigation Problem
Important Issue #1: There is considerable “functional redundancy” between streams and wetlands.
Opportunity to integrate stream and wetland restoration to recover the full suite of lost ecosystem functions on reclaimed surface mines.
Important Issue #2: New mine development is occurring on top of legacy impacts.
Acid Mine Drainage
Untreated Sewage
Opportunity to integrate on-site mitigation with strategic off-site mitigation to meet watershed scale goals (e.g., recovered fisheries).
Towards an Integrated Mitigation Policy
I. Integrate Wetland and Stream Mitigation On-Site to Maximize On-Site Recovery of Aquatic Ecosystem Functions.
II. Integrate On- and Off-site Mitigation to Maximize Watershed Scale Benefits and Meet Total Impact Liability.
Research Needs• What ecosystem functions are being lost during
mine development?
• What functions are being recovered through on-site mitigation of streams and wetlands?
• Can we develop ecological currencies to compare functional values of reference headwaters, constructed wetlands, and constructed stream channels?
• Are there ways to improve on-site mitigation so as to maximize recovery of functional losses?
• Are there ways to integrate on- and off-site mitigation to maximize watershed scale benefits?
Application to Mine Development• Step 1: Estimate EU losses resulting from
proposed development– Functional EU based on organic matter
processing
Application to Mine Development• Step 2: Place projected EU losses into a
watershed scale context– Quantify functional loss as a percentage of the
total EUs “operating” in the watershed.
Application to Mine Development
• Step 3: Develop On-Site / In-Kind Mitigation Plan to maximize headwater EU recovery.
• Construction of wetland, flowing channel, riparian corridor complexes.
• Maximize sediment, water, OM, and nutrient retention.• Added local values: fishing, aesthetics, real estate value,
bird habitat.• Valuation of On-Site EU credits.• Constraints: spoil permeability and isolation from
downstream systems.• Typically end up with an EU deficit and a “structural”
deficit.
Application to Mine Development
• Step 4: Obtain remaining liability through strategic Off-Site mitigation
• Sequence of prioritized restoration actions in the watershed (stream bank stabilization, AMD remediation, habitat enhancement, riparian plantings, conservation easements).
• Actions designed to meet measurable watershed scale ecological goals (e.g., productive fisheries, EU recovery).
• Plans stipulate Mitigation Credit Value of Restoration actions.
• Plans may be “pre-approved.”
Hypothetical Example
• Projected Impacts from Mining– Jurisdictional wetlands: 2 acres– Jurisdictional streams: 3 miles– Headwater Function EUs: 9 EUs (2%)
• On-Site Mitigation Plan– Direct Wetland Offset: 2 acres– EU Offset via Wetlands: 6 EUs (4 acres)– EU Offset via Streams: 1 EUs (1 mile)
• Off-Site Mitigation Plan– Remaining stream liability: 6 EUs (2 miles)
Hypothetical Example
• Pre-Mining Conditions On-Site– Jurisdictional wetlands: 2 acres– Jurisdictional streams: 3 miles– Headwater Function EUs: 9 EUs (2%)
• Post-Mining Conditions On-Site– Wetlands: 6 acres– Stream Channels: 1 mile– Headwater Function EUs: 7 EUs
• Post-Mining Conditions Off-Site– Restored HW EUs: 6 EUs – Restored stream channel: 2 miles
Hypothetical Example
• Net Change at Watershed Scale– Wetland Area: + 4 acres (200%)– Stream Channel: - 2 miles (33%)– Improved Stream Channel + 2 miles– Headwater Function EUs: + 4 EUs (150%)
Mine Development Plan•Projected impacts•Stream miles•Headwater EcoUnits
Watershed Restoration Master Plan
• 8 – 10 digit HUC scale• ID dominant stressors• Maximize ecological recovery at
the watershed scale
Integrated Mitigation Plan•+ HW Function•+ Extent of Wetlands•+ Functional Stream Miles•+ Progress towards implemtnation of the WRMP
On-Site Mitigation Plan•Linked wetland – stream channel complexes•Maximize HW function offset
Off-Site Mitigation Plan•EcoUnit based (HW and fishery)•Prioritized actions•Investment opportunities with associated credits•Seek pre-approval
• provides a way to:
– Integrate wetland and stream construction to meet on-site restoration objectives.
– Integrate on- and off-site mitigation to meet watershed scale restoration objectives.
– Quickly improve watershed conditions and the amount of functional streams and wetlands on the landscape
– Defend the process as being rational, quantitative, and science based
Mitigation Policy based on Ecological Function…
Benefits of Watershed Scale Perspective to Mitigation
Combines On-Site and Off-Site mitigation to meet watershed scale objectives.
Pre-approved watershed mitigation plans can reduce permitting time, cost, and uncertainty.
Science-based program that is legally defensible.
A platform for watershed-based mitigation banks.
Watershed plans that can be used by many: Industry, Division of Highways, County Planners, DEP, Watershed Organizations