Revised Procurement Plan for PMGSY RRP-II projectPunjab as on 29 th Dec 2014
This is an indicative plan prepared for RRP-II PMGSY Punjab. The project shall update the procurement Plan annually or as needed throughout the duration of the project in agreement with the Bank to reflect the actual project implementation needs and improvements in institutional capacity. The Project shall implement the procurement plan in the manner in which it has been approved by the Bank.
I. General 1. Bank’s approval date of the procurement plan - 29 th Dec 2014 2. Date of General Procurement Notice issued for Consultancies only : September 14, 20103. Period covered by this procurement plan: Full project period
II. Goods and Works1. Procurement Methods and Prior Review Threshold: Procurement Decisions shall be subject to Prior
Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement.
Expenditure Category Procurement Method
Prior Review ThresholdUS $
Comments
GOODS, EQUIPMENTS & MACHINERY
1. Goods and Equipments estimated to cost equivalent of US$ 3000, 000 or more per
contract
ICB All contracts World Bank SBD will be used and the procurement will be as
per procedures described in World Bank Guidelines.
2. Goods and Equipments estimated to cost less than US$ 3000, 000 and greater
than US$ 100, 000 equivalent per contract
NCB All post review All post review
The NCB bidding document agreed will be used and the procurement will be as per procedures described in the Procurement and Contract
Management Manual
95065
3. Goods and Equipments estimated to cost less than US$ 100, 000 or more per
contract
Shopping procedure with at least three
quotations from qualified bidder in accordance
with the provisions of
paragraph 3.5 of procurement Guidelines.
Procurement through DGS&D rate contracts
will be considered
equivalent to shopping
procedure.
All post review
4. Goods and Equipments that meet the requirements of paragraph 3.6 and 3.7 of procurement Guidelines
Direct Contracting
DC < USD100000 Post Review and All others
prior review
CIVIL WORKS
5. Civil works contracts ,Each greater than US$ 40,000,000
or equivalent per contract
ICB* All contracts World Bank SBD will be used and the procurement will be as per procedures
described in World Bank Guidelines.
6. Civil works contracts ,Each greater than US$ 50,000 or
equivalent and less than US$ 40,000,000 per contract
NCB First contract for works for each State,
irrespective of value and all contracts estimated to
cost more than US$
The procurement will be done as per procedures described in the procurement cum Contract Management Manual and using
SBD cleared by the Bank.
15,000,000 equivalent per contract will be
subject to prior review by the Bank. All other works contracts will be subject
to post review.*As per current planning, no ICB contracts are envisaged for civil works.
2. Pre-qualification. Not applicable
3. Proposed procedures for CDD Components (as per Paragraph 3.17 of the Guidelines: Not Applicable
4. Reference to (if any) Project Operational/ Procurement Manual: A Procurement cum contract Management Manual has been prepared by NRRDA. The manual has been received by the Bank and clearance of the manual given by the Bank. All Procurement in the project will be done as per procedures described in it.
5. Any Other Special Procurement Arrangement:
The Following provisions constitute additional provisions applicable for purpose of National Competitive Bidding (NCB). NCB will be conducted in accordance with paragraph 3.3 and 3.4 of the Guidelines and the following provisions:
Only the Model Bidding Document for procurement of works through NCB agreed with the Bank (and as amended for time to time). Shall be used for bidding;
Invitations to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated national daily inter-alia giving the website/electronic portal details from which the details of the invitation to bid can be downloaded), at least 30 days prior to the deadline for the submission of bids. No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidder, State-owned enterprises, small scale enterprises or enterprises from any given State;
Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder;
Extension of bid validity shall not be allowed with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks; and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by Bank only in cases of Force Majeure and circumstances beyond the control of the Purchaser/ Employer)Re-bidding shall not be carried out with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank
The system of rejecting bids outside a pre-determined margin or “bracket” of prices shall not be used in the project;
Rate contracts entered into by Directorate General of Supplies and Disposals will not be acceptable as a substitute for NCB procedures unless agreed with the Bank on case to case basis. Such contracts will be acceptable however for any procurement under the Shopping procedures Two or three envelope system will not be used (except when using e-Procurement system assessed and agreed by the Bank)However, as exception in this project, two part bidding for NCB works (as described in the model bidding document) has been agreed by the Bank subject to appropriate fiduciary safeguards (e-procurement system and complaint handling mechanism acceptable to the Bank)
All procurement of works through NCB will be done through a standardized e-procurement system acceptable to the Bank.
As per paragraph 1.14(e) of the World Bank’s Procurement Guidelines the associations’ right to inspect the accounts and records of bidders, suppliers and contractors will be included in the bidding documents.
III. Selection of Consultants1. Selection Methods and Prior Review Threshold: Selection decisions shall be subject to Prior
Review by Bank as stated in appendix 1 to the Guidelines Selection and Employment of Consultants:
Expenditure Category
Value threshold per contract
Procurement Method Prior Review Threshold
Consultancy contracts to be awarded to consultant firms including selection of
Each contract estimated to cost US$ 1000,000 equivalent or more per contract
-Quality and Cost Based selection (QCBS)-REO: to be published in UNDB on line
All prior review.
Each contract estimated to -Quality and Cost Based All single source
training institutes by NRRDA/SRRDAs
cost less than US$ 1000,000 equivalent per contract
(QCBS) method-Quality Based (QBS) method of selection in accordance with ht provisions of paragraph 3.1 to 3.4 of consultant’s Guidelines.-Consultant’s Qualifications (CQS) method.-Least Const Method (LCS).-Fixed Budget Method-Single Source Selection
selection of consultants with estimated cost of more than US$ 100,000 equivalent per contract will be subject to prior review. All other contracts will be subject to post review but with TORs subject to prior review by the Bank.
All Individual Consultant contract
-Through comparison of qualification of at least three candidates.
-Single source Selection
All cases subject to post review but with TORs subject to prior review by the Bank. All contracts for single source /selection of individual consultant with estimated value more than USD 100 000 will be subject to prior review
2. Short List Comprising entirely of National Consultants: short list of consultants for services, estimated to cost less than US$ 500,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.
Any Other Special Selection Arrangements: NIL.
i) Procurement plan with Method & Time Schedule -- for WORKS
Phase IX
Sr No.
Reference Package
No.Contract
( Description )Lengt
h ( Km)
GOI Amount
( In Lacs)
Contract
AmountProcurement Method
Review by Bank
Expected Bid
opening date
Comments
1 2 3 4 5 6 7 8 9 10
1 PB-0138 Manj to Bachiwind 7.86 370.02 441.04 NCB Post Awarded on 17-09-2012
Work Completed
2 PB-0139 Amritsar Wagha to Amritsar Chabal Road 16.98 951.79 1031.04 NCB Post Awarded on
17-09-2012Work
Completed3 PB-0140 Amritsar Ajnala road to
Chetanpura 19.92 945.72 894.96 NCB Post Awarded on 02-11-2011
Work Completed
4 PB-0141 Gaggomahal, Chamiari to Khatrai Kalan 13.55 650.97 750.79 NCB Post Awarded on
17-09-2012Work
Completed5 PB-0142 Burj to Lahori Mal Bhakna
Road 12.16 583.14 585.68 NCB Post Awarded on 31-10-2011
Work Completed
6 PB-0144 Bandala to G.T.Road (NH-I) 24.00 1033.25 1125.31 NCB Post Awarded on 14-11-2011
Work Completed
7 PB-0145 APK road to Jandiala 9.72 464.03 447.54 NCB Post Awarded on 31-10-2010
Work Completed
8 PB-0146 Amritsar Ajnala road to APK road 15.72 726.69 767.63 NCB Post Awarded on
31-10-2011Work
Completed9 PB-0147 G.T. NH-I (Khilchian) to
Amritsar Mehta Road 15.75 671.09 540.32 NCB Post Awarded on 02-11-2011
Work Completed
10 PB-0533 Mallanwala to Fatehgarh Sabhraon 11.42 576.80 583.75 NCB Post Awarded on
02-11-2011Work
Completed11 PB-0534 Ferozepur to Maboke 15.69 783.59 785.42 NCB Post Awarded on
02-11-2011Work
Completed12 PB-0535 Mamdot to Maboke 10.70 537.74 519.70 NCB Post Awarded on
02-11-2011Work
Completed13 PB-0536 Chak Moban Hardo Dhandi to
Tahliwala 20.90 911.26 954.30 NCB Post Awarded on 02-11-2011
Work Completed
14 PB-0537 Guruharsahai to MKT- Jallalabad road via Boor Wala 22.50 1142.10 1159.24 NCB Post Awarded on
02-11-2011Work
Completed
Kuti road
15 PB-0538 MB
NH-15 (Km 168.50) to Mallanwala (Section NH-15 Km 168.50 to Fatehgarh Sabraon via Nizimudin, Wattu Bhatti
Gatta Badshah)
7.91 378.53 400.37 NCB Post Awarded on 01-11-2011
Work Completed
16 PB-0539 MB
NH-10 (Km 391.25 Ghallu) to T-06 (ODR Km 14.00) via
Ghallu, Khippan wali, Azamwala, Kheo wali Dhab
13.13 632.31 695.50 NCB Post Awarded on 01-11-2011
Work Completed
17 PB-0540 MB
NH-10 (Km 393.00) to MDR 40 (Km 34.00) via Kathera, Kamal
Wala, Islamwala15.00 722.51 732.78 NCB Post Awarded on
01-11-2011Work
Completed
18 PB-0541 MB
NH-15 (KM 170.60) to T-08 Zira-Mallanwala raod via
Sadar wala, Ghuddu wala, Behak Fattu, Islambad, Lohke Kalan, Thatha Kishan Singh
13.58 680.42 735.84 NCB Post Awarded on 01-11-2011
Work Completed
19 PB-0542 Mamdot to SH-20 Ferozepur Fazilka raod 20.13 967.39 958.67 NCB Post Awarded on
02-11-2011Work
Completed
20 PB-0543Ferozepur City to Pharymal Bhalla to ODR-20 Ferozepur
Mallanwala road24.70 1192.85 1198.80 NCB Post Awarded on
02-11-2011Work
Completed
Total 311.32 14922.20
15308.68
Phase X
Sr. No
Reference Package
No.Contract ( Description )
Length
( Km)
GOI Amount
( In Lacs)
Contract
Amount ( In
Lacs)
Procurement Method
Review by Bank
Expected Bid
opening date
Comments
1 2 3 4 5 6 7 8 9 10
1 PB-0153 Sarangdev to Abadi Sarangdev 2.20 111.34 107.13 NCB Post Awarded on 03-10-2012
Work Completed
2 PB-0154 Harsha Chinna Road to Abadi Jhander 1.95 118.02 117.67 NCB Post Awarded on
03-10-2012Work
Completed
3 PB-0214 Gidder Neor Road to Kothe Gobind Nagar 1.37 42.4 1 42.61 NCB Post Awarded on
05-11-2012Work
Completed
4 PB-0215 Poohla to Kothe Mehneke 1.80 80.86 73.72 NCB Post Awarded on 29.04.2013
Work Completed
5 PB-0216 Phul Bhadaur Road 12.96 604.51 564.79 NCB Post Awarded on 03-12-2012
Work in progress
6 PB-0315 Kotkapura - Jaitu - Chandbhan Road 19.33 922.95 989.87 NCB Post Awarded on
28-03-2013Work
Completed
7 PB-0415N.H. 95 Km 52 Ucha Pind
(Sanghol) to Khanna upto M.C. Limit
17.10 876.88 844.58 NCB Post Awarded on 12-03-2013
Work in progress
8 PB-0416 Badali Ala Singh to N.H.-1 (KM 2.52) 11.00 528.91 519.94 NCB Post Awarded on
22-10-2012Work
Completed9 PB-0417 Amloh to Khanna 10.00 476.9 478.52 NCB Post Awarded on
09-11-2012Work
Completed10 PB-0544 Sukhera Bodla Jodhey Wala
road to Dhani Amar Singh 2.00 94.39 79.94 NCB Post Awarded on 11-10-2012
Work Completed
11 PB-0545 Baghe Ke Uttar to Dhani Inder Singh 1.40 67.94 57.46 NCB Post Awarded on
11-10-2012Work
Completed12 PB-0723 Tanda to Dholwaha Bahera
upto H.P. Boundary 16.60 1086.04 1138.75 NCB Post Awarded on 25-03-2013
Work in progress
13 PB-0724 Jaijon to Garhshankar Hoshiarpur Road (Km 73) 15.94 585 547.15 NCB Post Awarded on
30-10-2012Work
Completed14 PB-0725 Mahilpur to Phagwara 14.34 625.4 574.75 NCB Post Awarded on
30-10-2012Work in progress
15 PB-0726 Hajipur to Miani (Sec. Hajipur to Dasuya) 19.19 835.15 747.50 NCB Post Awarded on
30-10-2012Work
Completed
16 PB-0727 Miani to Begowal 7.45 326.46 287.79 NCB Post Awarded on 30-10-2012
Work Completed
17 PB-0728 Jia Chak to Datarpur 17.48 802.83 765.61 NCB Post Awarded on 30-10-2012
Work in progress
18 PB-0827 Banga Phillaur Km 13.40 to Nagar 24.30 Km 10.90 510.08 499.54 NCB Post Awarded on
05-12-2012Work
Completed
19 PB-0828 Bhogpur Adampur ODR km. 0 to Behram km. 6 (ODR) 5.20 165.26 153.21 NCB Post Awarded on
30-10-2012Work
Completed
20 PB-0829 Mehatpur to Parjian Kalan (ODR 27) 9.30 411.69 385.6 NCB Post Awarded on
30-10-2012Work
Completed
21 PB-0830 Phagwara - Dosanjh (ODR Km 7.50 to Mukandpur road) 11.35 322.03 338.64 NCB Post Awarded on
30-10-2012Work
Completed
22 PB-0916 Nadala to Dhilwan 12.40 460.4 420.54 NCB Post Awarded on 30-10-2012
Work Completed
23 PB-0917 Razapur to Kular 13.97 862.44 843.23 NCB Post Awarded on 30-10-2012
Work Completed
24 PB-1025 Lakha to Burj Kularan (ODR-8) upto Block Boundary 17.64 1027.97 982.37 NCB Post Awarded on
25-10-2012Work
Completed
25 PB-1026L.F. Road upto Sugar Mill
(ODR-11) to Kokari Kalan via Galib Kalan upto Distt.
Boundary7.50 410.66 398.88 NCB Post Awarded on
25-10-2012Work
Completed
26 PB-1027 Bhundri to Swaddi Kalan upto Block Boundry via Barrowal 15.10 807.82 741.35 NCB Post Awarded on
25-10-2012Work
Completed
27 PB-1028Pohir Ahmedgarh
(Bahadargarh) to Brahmpur via Chhappar Rachine
13.70 673.53 657.75 NCB Post Awarded on 25-10-2012
Work Completed
28 PB-1029 (MB)
Chhokkar to Dhoorkot (Sec. Jodhan to Lohgarh) 8.10 445.36 NCB Post Awarded on Work
Completed
29 PB-1113Sardulgarh Mansa road to
Talwandi Sabo upto block limit (ODR-22A)
19.51 890.04 991.03 NCB Post Awarded on 05-04-2013
Work Completed
30 PB-1114 Jourkian Jagatgarh Bandran (ODR-22C) 2.83 113.27 111.09 NCB Post Awarded on
06-11-2012Work
Completed
31 PB-1115Sardulgarh Ratia Road to
Sangha upto Haryana Border (ODR-22 B)
15.88 817.93 850.81 NCB Post Awarded on 06-11-2012
Work Completed
32 PB-1116 (MB)
Mansa Khukhar Khurd Sadha Singhwala Man Bibrian upto
Block Boundary (T-08)11.10 689.08 782.64 NCB Post Awarded on
30-10-2012Work in progress
33 PB-1117 (MB)
Jhunir to Ghurkarni Fatehpur Modey Pilsian upto Block
Boundary9.00 662.67 688.70 NCB Post Awarded on
30-10-2012Work
Completed
34 PB-1118 (MB)
Mansa Khillan Chakerian Fafre Bhaike upto Block Boundary 10.57 672.81 671.25 NCB Post Awarded on
30-10-2012Work
Completed
35 PB-1210Mudki to Nihal Singh Wala
(ODR-06) (Sec. Block Boundries Bagha Purana)
32.80 1006.96 892.78 NCB Post Awarded on 25-10-2012
Work Completed
36 PB-1211 Bagha Purana Block Boundary to NH-71 via Nihal Singh Wala 17.46 696.35 633.38 NCB Post Awarded on
31-01-2013Work
Completed
37 PB-1212Moga Khosa Pando Zira road upto Block Boundary (RD 0 to
8.50 Km)8.50 260.09 225.45 NCB Post Awarded on
25-10-2012Work
Completed
38 PB-1213 Moga Khosa Pando Zira road (RD 8.50 to 23.46 Km) 14.96 479.42 441.89 NCB Post Awarded on
25-10-2012Work
Completed
39 PB-1214 Kot Ise Khan to Jagraon upto Block Boundary 16.00 504.93 469.67 NCB Post Awarded on
25-10-2012Work in progress
40 PB-1215 Kot Ise Khan to Galib Kalan (RD 16.00 to 25.20 Km) 7.80 238.37 205.30 NCB Post Awarded on
25-10-2012Work in progress
41 PB-1216Kot Ise Khan to Dharamkot to Sidhwan Bet (Sec. Dharamkot
to Sidhwan Bet upto Block Boundary)
13.70 491.35 461.40 NCB Post Awarded on 25-10-2012
Work Completed
42 PB-1327Gidderbaha to Bhalianan (Section Gidderbaha to
Kotbhai)7.47 421.02 400.64 NCB Post Awarded on
11-10-2012Work
Completed
43 PB-1328Hunsar (NH-15) to sotha
(Muktsar-Malout road) upto Bloack Bounday (Sec. Gidderbaha to Sotha)
22.30 756.62 719.07 NCB Post Awarded on 11-10-2012
Work in progress
44 PB-1329 (MB) Butter Sharih to Mallan 7.58 436.12 464.53 NCB Post Awarded on
17-10-2012Work in progress
45 PB-1330 (MB) Alamwala to Dabra 7.61 448.35 539.37 NCB Post Awarded on
18-07-2013Work in progress
46 PB-1525 Rohti Bridge to Tanda Bhada Bridge upto Distt. Boundary 21.30 962.41 985.60 NCB Post Awarded on
09-11-2012Work
Completed47 PB-1526 Nabha Thuhi Channo Road 6.22 285.18 308.00 NCB Post Awarded on
09-11-2012Work
Completed48 PB-1527 Patiala Main Swajpur Road 11.15 633.52 644.85 NCB Post Awarded on
15-11-2012Work
Completed49 PB-1528 Retgarh to Shuttrana 14.70 846.42 860.87 NCB Post Awarded on
15-11-2012Work
Completed50 PB-1529 Rajpur Chandigarh road to
Fatehgarh Sahib Landran road 9.30 465.27 561.67 NCB Post Awarded on 15-11-2012
Work Completed
51 PB-1530 Sarala Kalan to Naneola upto Haryana Border 6.00 437.96 524.40 NCB Post Awarded on
15-03-2013Work
Completed
52 PB-1620 MDR 55 Km 27.00 Nurpur Bedi to ODR 13 Distt. Boundary 11.43 653.13 679.62 NCB Post Awarded on
08-05-2014
Rebidding was done as the
previous agency did not execute the work after
allotment.
53 PB-1621RGN Road SH-22 to Sh. Naina
Devi Road upto Block Boundary
6.44 329.38 362.30 NCB Post Awarded on 15-11-2012
Work Completed
54 PB-1750 Tapa to Pakhoke Crosing 12.80 724.06 690.91 NCB Post Awarded on 04-10-2012
Work Completed
55 PB-1751 Tapa to Talwandi 30.40 1739.8 1780.88 NCB Post Awarded on 04-10-2012
Work Completed
56 PB-1752 Baloke to Abadi Baloke 2.40 123.8 116.96 NCB Post Awarded on 08-10-2012
Work Completed
57 PB-1753 (MB)
Raisar to Diwana via Naraingarh Sohian 22.13 1318.25 1482.19 NCB Post Awarded on
17-06-2013Work in progress
58 PB-1747 Sangrur (Km 3.80) to Cheema 16.00 766.29 759.64 NCB Post Awarded on 04-10-2012
Work Completed
59 PB-1748 Dhuri to Mimsa upto Block Boundary 12.40 280.17 281.32 NCB Post Awarded on
03-10-2012Work
Completed
60 PB-1749 Bagrian to Mimsa upto Block Boundary 6.45 189.1 187.08 NCB Post Awarded on
08-10-2012Work
Completed
61 PB-1754 Bhawanigarh to Bassiarkh (Sec. Bhawanigarh to Balial) 5.60 308.21 306.36 NCB Post Awarded on
04-10-2012Work
CompletedG. Total 717.06 33931.5
632901.1
7
Phase XI ( Batch – I)
Sr. No
Reference Package
No.Contract
( Description)Lengt
h ( Km)
Amount ( In Lacs)
Contract
Amount ( In
Lacs)
Procurement Method Post
Expected Bid
opening date
Comments
1 2 3 4 5 6 6 7 8 9
1 PB01-076 Amritsar Mehta road to Binjierwal 4.47 173.90
967.93
NCB Post
Awarded on 08.05.14
These works have been allotted by grouping.Work in progress
2 PB01-078 Ram Diwali To Jhamke 5.25 246.50 NCB Post3 PB01-080 Asr Majitha FGC to Burj Gosal
Zimidara 4.02 181.46 NCB Post
4 PB01-084Asr Pkt road to Abadi Abdal 1.06 54.02 NCB Post
Asr FGC Road to Daddopura 5.40 281.77 NCB Post
5 PB01-079 Majitha Fateh Garh Churrian to Bhagwan 4.49 189.96
612.97
NCB Post
Awarded on 08.05.14
These works have been allotted by grouping.Work in progress
6 PB01-081Majitha Kathunangal via
Jalalpur Sham Nagar T-02 to Jalalpur)
5.76 220.76 NCB Post
7 PB01-085Amritsar Fateh Garh Churrian
Road to Jehunangal 2.32 105.55 NCB Post
Harrian Kaler Mangat to Dadian 0.98 57.57 NCB Post
8 PB01-093 Chaba to Mandiala 6.23 343.4 338.13 NCB Post Awarded on 05-09-2013
Work in Progress
9 PB01-109Makkowal to Sudhar 5.00 251.77
759.11NCB Post
Awarded on 08-05-14
Work in ProgressKurallian to Thoba 2.84 194.24 NCB Post
Darya Mussa to Thoba 5.00 332.56 NCB Post
10 PB01-105 Motla to Jai Ram Kot 2.60 173.75 1233.37 NCB Post Awarded on 17-12-2013
These works have been allotted by grouping
Work in progress
Bhalot to Lopoke Ajnala 7.00 302.91 NCB Post
11 PB01-110
Ibrahimpura road to Gujjarpura, Gaggomehal 4.26 168.93 NCB Post
Abadi Puran Galib to Gaggomehal 2.75 130.98 NCB Post
Lakhuwal to Paidewal 1.60 81.24 NCB Post
12 PB01-111 Nanoke to Sudhar 1.55 73.73 NCB PostAbu Said to Chamiari 5.90 288.31 NCB Post
13 PB01-057 Tarn Taran Goindwal road to Voin Poin 4.01 187.37 176.01 NCB Post Awarded on
23-12-2013Work
Completed
14 PB01-058ATTSH Road To Walipur
Jandoke To Takthu Chak (Tarn Taran to TarnTaran Patti Road)
8.35 457.88 480.80 NCB Post Awarded on 17-12-2013
Work in progress
15 PB01-060 Chohla Sahib To Dhun Dhaiwal 5.50 289.06 297.67 NCB Post Awarded on 17-06-2013
Work Completed
16 PB01-061Sheron Dhotian Road to Abadi
Paidewali Khui (Dhotian To Naushera Pannuan)
5.30 250.49 258.14 NCB Post Awarded on 17-06-2013
Work Completed
17 PB01-062 ABK Road To Mari Kamboke 7.50 453.50 468.23 NCB Post Awarded on 04-09-2013
Work in progress
18 PB01-067T06 To Pandori Romana (ABK Road To Tarn Taran Chabal
Road)8.82 476.15 497.21 NCB Post Awarded on
04-09-2013Work in progress
19 PB01-070 Tarn Taran Patti Rd to Koharka 6.85 470.97 488.18 NCB Post Awarded on 04-09-2013
Work in progress
20 PB02-017 Upgradation of MDR 41 to Burj Mehma 1.39 59.32 47.61 NCB Post Awarded on
11-07-2013Work
Completed
21 PB03-018 Kemeana to Daggo Rormana up to Phide Kalan 9.72 506.08 532.99 NCB Post Awarded on
17-06-2013Work in progress
22 PB03-019 Kaler to Kot Sukhia to Bageana up to Panjgrain 7.72 360.77 375.93 NCB Post Awarded on
17-06-2013Work
Completed
23 PB03-020Golewala to Chugewala to
Diffence road up to Sh- Muktsar-Ferozepur road
11.96 570.83 555.38 NCB Post Awarded on 17-06-2013
Work in progress
24 PB03-023 Bageana to Panjgrain 8.55 368.60 376.51 NCB Post Awarded on 17-06-2013
Work in progress
25 PB05-050 MB Suner to Mansoorwal Kalan 5.00 244.09 242.87 NCB Post Awarded on
17-06-2013Work
Completed
26 PB05-052 MB
T-05 (Zira-Kot Ise Khan) Km 23.50 to Tindwan 8.11 426.50 412.67 NCB Post Awarded on
17-06-2013Work in progress
27 PB05-055 MB Mudki to Kabar Wacha 6.00 277.72 286.49 NCB Post Awarded on
17-06-2013Work
Completed28 PB05-057 SH-20 (Km 51) to Pire Ke
Uttar 4.98 261.15 256.49 NCB Post Awarded on 09-07-2013
Work Completed
29 PB05-058 Sukhera Bodla to Jhode Wala 6.00 435.44 426.54 NCB Post Awarded on 09-07-2013
Work Completed
30 PB05-075Banna wala to Hamad Chak 3.00 171.45
296.47NCB Post Awarded on
11-07-2013Work
CompletedArifke to Bandala (Km. 9.60 to 12.70) 3.10 159.54 NCB Post
31 PB05-061 F.F. Road to PAP Picket Noor Shah 5.98 257.37 249.54 NCB Post Awarded on
30-07-2013Work in progress
32 PB05-071 MDR-39 (Abohar-Sitoguna Dabwali) K.M 21.00 to Vishnu Datt Dhani (Sec MDR-39 K.M 21.00 to Bazidpur Bhoma)
9.22 482.89 517.17 NCB Post Awarded on 17-06-2013
Work in progress
33 PB05-072NH-10 (Malout-Fazilka) K.M
382.00 to Patti Teja to Muradwala Dal Singh to Kundal ( ODR ABH-MKS)
13.82 730.20 777.58 NCB Post Awarded on 17-06-2013
Work in progress
34 PB05-076NH 10 (Malout-Fazilka) Km
386.00 to Jand Wala Hanuwanta
1.60 86.69 91.16 NCB Post Awarded on 17-06-2013
Work Completed
35 PB05-082 MDR-40 (Km 31) to Noorpur 4.50 183.24 188.70 NCB Post Awarded on 17-06-2013
Work Completed
36 PB05-083 SH-20 (Km 70) to Ladhuka 1.70 78.54 80.76 NCB Post Awarded on 17-06-2013
Work Completed
37 PB05-087MDR-40 to Mandi Roran Wali
(Halimiwala via Aliana Nukerian)
12.75 570.47 611.09 NCB Post Awarded on 18-06-2013
Work in progress
38 PB05-088MDR-40 (KM 26.75) (Arniwala)
to Dalip Singh Dhani via Bannawala, Pakan
12.18 516.44 537.91 NCB Post Awarded on 17-06-2013
Work in progress
39 PB06-041 APK Road to Satkoha Bhoja 3.00 100.76 104.54 NCB Post Awarded on 08-05-2014
Work in progress
40 PB06-054 DBN-FGC road to Bholeke via Niko Sarai 6.20 235.19 247.88 NCB Post
Awarded on 04-09-2013.
Work in progress
41 PB06-081Nagal Ghiala Gura Mirthal to
Nalunga up to Himachal Pardesh Boundary
1.90 123.66 121.89 NCB Post Awarded on 01-07-2013
Work Completed
42 PB07-032 NH-1A (Jalandhar-Pathankot) to Behalpur 4.90 to 9.50 Km 4.60 157.40 130.94 NCB Post Awarded on
14-06-2013Work
Completed
43 PB07-042 Mukerian Naushera to Talluwal 6.30 353.03 299.61 NCB Post Awarded on 14-06-2013
Work Completed
44 PB08-032 Mehatpur to Khurlapur via Khaira Mustarka 8.50 419.06 427.67 NCB Post Awarded on
17-06-2013Work
Completed45 PB08-043 Nakodar Kapurthala road to
Shahpur 4.16 228.90 232.06 NCB Post Awarded on 17-06-2013
Work Completed
46 PB08-046 Samrai to Pandori Mustaki 2.72 123.36 131.22 NCB Post Awarded on 24-12-2013
Work Completed
47 PB08-047 Jandiala to Patti Mohanpur 5.20 274.22 271.43 NCB Post Awarded
on 17-06-2013
Work in progress
48 PB09-019 NH-1 (Jalandhar-Amritsar) to Lakhan Khurd 7.25 403.09 371.61 NCB Post Awarded on
17-06-2013Work in progress
49 PB09-021 T-03 to Pakhowal 6.90 256.47 253.05 NCB Post Awarded on 06-09-2013
Work Completed
50 PB10-035 Bhadewal Bridge to Jargari 9.56 523.09 421.91 NCB Post Awarded on 04-07-2013
Work in progress
51 PB10-036 GT Road to Payal Via Barmalipur 4.80 195.83 165.75 NCB Post Awarded on
04-07-2013Work
Completed
52 PB10-039Hadiwal to T-04 4.03 197.00
432.48NCB Post
Awarded on 04-07-2013
Work CompletedMarrewal to T-05 3.66 171.68 NCB Post
Ghumana to T-03 2.31 87.77 NCB Post53 PB10-040 Ghelewal to T-03 6.21 343.50 327.96 NCB Post Awarded on
04-07-2013Work
Completed54 PB10-041 Bholapur to T-04 6.05 255.68 240.28 NCB Post Awarded on
04-07-2013Work in progress
55 PB10-042NH-1 to Bilga 1.47 57.89
142.98NCB Post Awarded on
04-07-2013Work
CompletedSahnewal Kalan to Bhairo Munna Road 2.40 97.72 NCB Post
56 PB10-043 Boundal to Samrala 4.45 204.77 354.82 NCB Post Awarded on 22-07-2013
Work in progressDhindsa to ODR-15 3.25 140.98 NCB Post
57 PB10-046 Dangian to Kaunke kalan 7.90 455.56 444.93 NCB Post Awarded on 17-06-2013
Work in progress
58 PB10-048Sohian to N.H-95 (L.F. road) 2.38 118.28
743.67NCB Post Awarded on
22-07-2013Work in progressBarich to Dhollan. (MDR-51) 10.92 636.79 NCB Post
59 PB10-067 Aluna kalan to MDR-33 Via Aluna Tola, Nasrali. 6.65 307.55 317.39 NCB Post Awarded on
17-06-2013Work in progress
60 PB10-071 Jhugina Begga to T-03 1.60 77.18 66.23 NCB Post Awarded on 04-07-2013
Work Completed
61 PB10-077 Chak-Bhaika to Bassian 10.15 528.21 530.46 NCB Post Awarded on 22-07-2013
Work in progress
62 PB10-078 Mand Chounta to T-03 4.00 190.94 175.17 NCB Post Awarded on 04-07-2013
Work Completed
63 PB10-079 Ayali to Jhamat 1.75 94.57 78.24 NCB Post Awarded on 04-07-2013
Work Completed
64 PB10-080 Kariana Kalan to T-03 1.40 51.57 50.04 NCB Post Awarded on 04-07-2013
Work Completed
65 PB10-081 N.H-95 to Bains. 3.50 157.42 91.04 NCB Post Awarded on 04-07-2013
Work Completed
66 PB11-019 Udat Bhagat Ram to Dullowal 4.42 194.99 214.53 NCB Post Awarded on 17-06-2013
Work Completed
67 PB11-021 H.S. Road to Gehle 4.55 201.02 216.70 NCB Post Awarded on 17-06-2013
Work Completed
68 PB11-022 Khaila Malikpur (H.S. Road) to Burj Hari to Kothe Major Singh 13.50 589.45 645.70 NCB Post Awarded on
17-06-2013Work
Completed
69 PB11-023 Sahnewala to Ghudduwala 3.25 139.69 153.68 NCB Post Awarded on 17-06-2013
Work Completed
70 PB11-024 Birewala Jattan to Bhalaike 2.35 106.79 105.93 NCB Post Awarded on 17-06-2013
Work Completed
71 PB11-026 Joga to Burj Dhilwan (Joga-Burj Jhabran) 8.80 367.34 406.69 NCB Post Awarded on
17-06-2013Work
Completed72 PB11-027 Aklian to Rar 12.72 664.19 627.39 NCB Post Awarded on
17-06-2013Work in progress
73 PB11-030 Kothe Jatana to Sardulgarh Mansa Road 16.67 865.99 899.40 NCB Post Awarded on
17-06-2013Work
Completed
74 PB11-031 Hirke to Jhanduke 4.39 233.23 253.53 NCB Post Awarded on 17-06-2013
Work Completed
75 PB11-032 Sardulgarh Road to Rorki 3.04 134.98 136.61 NCB Post Awarded on 17-06-2013
Work Completed
76 PB12-017 NH-95 RD 51.00 km to Talwandi Mallian Upto B.B 8.20 480.63 422.35 NCB Post Awarded on
04-07-2013Work
Completed
77 PB12-019 N.H 95 RD76 to Salina up toBlock Boundary 7.37 434.15 361.17 NCB Post Awarded on
04-07-2013Work in progress
78 PB12-021 ODR No.08 RD 8.10 km to Lopon upto B.B 9.00 467.12 396.67 NCB Post Awarded on
04-07-2013Work
Completed
79 PB12-027Didar Singh Wala to S.H. 16A Via Raunta, Tharaj (Smadth
Bhai)12.96 772.87 791.98 NCB Post Awarded on
17-06-2013Work in progress
80 PB12-029 Baghapurana Mudki Road ODR-6 RD 0.90km to Bhaloor 6.81 333.47 344.38 NCB Post Awarded on
22-07-2013Work in progress
81 PB13-031 Modlewala to Bariwala 3.20 120.41 118.36 NCB Post Awarded on 30.07.2013
Work in progress
82 PB13-034 Marar Kalian to Chack Modlewala 2.53 103.03 97.42 NCB Post Awarded on
16.08.2013Work in progress
83 PB13-039 Doda to Kothe Surgapuri upto Rupana Husnar Road 7.56 342.66 367.13 NCB Post Awarded on
17-06-2013Work in progress
84 PB13-045Lambi to Khudian Gulab Singh 3.20 170.41
251.76NCB Post Awarded on
17-06-2013Work in progressAbul Khurana to Dhani
Balwant Singh 1.30 66.07 NCB Post
85 PB13-046
MDR 39 (KM 53.50) to Killanwali 2.32 132.98
511.45NCB Post
Awarded on 17-06-2013
Work in progressMDR 39 (KM 44.90) to Middu
Khera to Fatta Khera 5.63 357.50 NCB Post
86 PB13-048Aulakh To Dhani Sucha Singh
via Jhorar to Lakkarwala to Khane ki Dhab
10.74 608.37 613.47 NCB Post Awarded on 17-06-2013
Work in progress
87 PB13-052 Buraj Sidhwan to Dhani Burkian wali 5.26 209.42 212.45 NCB Post Awarded on
17-06-2013Work in progress
88 PB13-053
NH-10 (KM 324.15) to Bhagu 1.20 77.53
144.67
NCB PostAwarded on 17-06-2013
Work CompletedMDR-399 (Km 40.90) to
Hakuwala 0.50 31.34 NCB Post
MDR-39 (Km 49.50) to Lohana 0.60 24.43 NCB Post
89 PB13-054Arniwala - Phullu Khera to
Dhani Kanganpura 50 276.23371.07
NCB Post Awarded on 17-06-2013
Work in progress
Kangan Khera to Dabwali Rahurianwali 1.69 69.04 NCB Post
90 PB13-056 Gurrusar Jodhan to Shamkot 2.54 128.15 134.26 NCB Post Awarded on 17-06-2013
Work in progress
91 PB13-057 SH-16 (KM 12.80) to Dhani Kundan Singh 3.62 171.64 176.54 NCB Post Awarded on
17-06-2013Work in progress
92 PB14-017Behram-Mahilpur road to
Phagwara-Hoshiarpur upto Block Boundary (Via Ghuman,
Mehliana)6.35 273.88 266.39 NCB Post Awarded on
24-06-2013Work
Completed
93 PB14-019 Balachaur-Ropar road to Majara Jattan 2.29 112.92 112.01 NCB Post Awarded on
24-06-2013Work
Completed94 PB14-026 Aur Phillaur to Phambra 3.52 174.34 177.13 NCB Post Awarded on
24-06-2013Work in progress
95 PB15-036 Patiala Rajpura Road to Shahpur Afgana 5.10 213.8 184.38 NCB Post Awarded on
17-06-2013Work
Completed
96 PB15-039Massingan to Faridpur 2.34 149.19
534.94NCB Post Awarded on
18-06-2013Work
CompletedPatiala-Pehowa road to GaneshPur Plant 5.58 378.87 NCB Post
97 PB15-056 Dhanetha to Ratanheri 4.78 234.33 228.87 NCB Post Awarded on 18-06-2013
Work Completed
98 PB15-057 Dhanetha Ratanheri to marouri 3.30 127.21 137.74 NCB Post Awarded on
04-07-2013Work
Completed99 PB15-048 Lalru to Dharamgarh 3.30 201.67 199.25 NCB Post Awarded on
01-07-2013Work in progress
100 PB17-067
Sangrur Barnala road to NH-64 to Harigarh
3.10 115.72 98.49
NCB Post
Awarded on 09-07-2014
Rebidding of this package was done as the previous
agency did not execute the
work.
Tapa - Bhadaur road km 06 to Jaimal Singh Wala NCB Post
101 PB17-087 Sherwanikot to Bhudan 5.80 308.89 235.99 NCB Post Awarded on 17-06-2013
Work completed
G. Total 637.64 31921.12
31767.35
Phase XI ( Batch-II)
Sr. No
Reference Package
No.Contract
( Description)Lengt
h ( Km)
Amount ( In Lacs)
Contract
Amount ( In
Lacs)
Procurement Method Post
Expected Bid
opening date
Comments
1 2 3 4 5 6 7 8 9 10
1 PB01-114 Amritsar Wagha road to Dhand 11.00 578.63 554.09 NCB Post Awarded on
08-05-2014Work in Progress
2
PB01-056
Tarn Taran Manochal Shahbajpur Dialpur road
(Sec.Tarn Taran to Shahbajpur)
Km 0 to 16.0016.00 950.69
1353.49 NCB Post Awarded on 12-03-2014
Work in Progress
3Tarn Taran Manochal
Shahbajpur Dialpur road (Sec. Shahbajpur to Dialpur) KM 16
to 23.717.71 381.48 Work in
Progress
4 PB01-075 Tarsika to Udhonangal 14.94 899.26 887.85 NCB Post Awarded on 12-11-2013
Work in Progress
5 PB-01-102 MB
G.T. Road (Khilchian) to Asr-Mehta Road 8.40 611.63 624.97 NCB Post Awarded on
17-02-2014Work in Progress
6 PB01-059 MB Sheikh Chak to Kalha 2.90 168.34 177.61 NCB Post
Awarded on 29-10-2013
Work Completed
7 PB01-069 MB
ATTSH Road To Khabe Rajputtan 8.18 604.51 667.89 NCB Post Awarded on
24-12-2013 Work in Progress
8 PB05-059 Abohar Hindumal to Kot Road 15.74 599.38 561.58 NCB Post Awarded
on 04-03-2014
Work in Progress
9 PB05-060 Khuian Sarwar Panjkosi Nihal Khera road 18.85 730.09 698.26 NCB Post
Awarded on 04-03-
2014Work in Progress
10 PB05-062 Fazilka Hindumal Kot Road 13.30 483.22 484.94 NCB Post Awarded
on 04-03-2014
Work in Progress
11 PB05-077 MB
NH15 (Abohar-Sri Ganga Nagar) Km 368.00 to
Dharmpura6.77 324.74 330.93 NCB Post
Awarded on 17-02-
2014Work in Progress
12 PB06-050 Shalla Chak Sharif road to Kahnuwan upto Sekhwan Adda 19.16 1272.63 1131.38 NCB Post
Awarded on 29-10-
2013Work in Progress
13 PB06-063Dhariwal Kot Santokh Rai
Allowal Jagowal Jattan Attri Bakshi Wal Road.
4.50 204.54 212.57 NCB Post Awarded on 07-05-2014
Work in Progress
14 PB06-058Gurdaspur Hardochhanni
Dostpur Bohar Wadala Kalanour road.
13.00 744.28 738.32 NCB Post Awarded on 08-05-2014
Work in Progress
15 PB06-062 Kalanour Qila Lal Singh Road 7.00 349.35 333.77 NCB Post Awarded on 08-05-2014
Work in Progress
16 PB06-075 MB
Gurdaspur -Jail road to APK road 8.08 493.55 501.19 NCB Post Awarded on
17-02-2014Work in Progress
17 PB06-060NH-1 A (117 Km) Malikpur
Sahoura Taragarh Dinanagar Road
14.00 685.94 720.37 NCB Post Awarded on 07-05-2014
Work in Progress
18 PB06-076 MB
Sujanpur to Jandpur Phool Piara Panjore Kaleser 6.50 313.72 338.54 NCB Post Awarded on
17-02-2014Work in Progress
19 PB07-038Gardiwal to Hoshairpur
Dasuya Road 22.30 822.33 765.19NCB Post Awarded on
22-01-2014Work in Progressto Koi Baruhi Dholbaha
Hariana Road NCB Post
20 PB07-039 Garshankar Santokhgarh Road 16.40 725.54 669.32 NCB Post Awarded on 22-01-2014
Work in Progress
21 PB07-040 Mahilpur to Jajjon Road 15.12 594.19 557.45 NCB Post Awarded on 22-01-2014
Work in Progress
22 PB07-035 Garhdiwal to Bullowal 10.00 510.76 490.47 NCB Post Awarded on 22-01-2014
Work in Progress
23 PB08-048 Muayi to Nurmehal via Bilga 9.27 610.98 597.83 NCB Post Awarded on 26-12-2013
Work in Progress
24 PB09-018 Phagwara to Nakodar road upto Distt.Boundary 7.60 477.88 463.07 NCB Post
Awarded on 26-12-2013
Work Completed
25 PB10-072 Dugri Dhandra road (R.D. 2.00 km) to Dhandra 3.90 163.99 162.37 NCB Post Awarded on
29-11-2013Work
Completed
26 PB10-074 Quaddian to NH-1 3.35 173.06 173.06 NCB Post Awarded on 06-02-2014
Work Completed
27 PB10-033 Chak Lohat to Machhiwara
ODR -17 17.75 863.3 863.30NCB Post Awarded on
06-02-14Work in Progress(Sec Machhiwara to Chak
Lohat) NCB Post
28 PB10-031 Isru to Dehru Road Via Chakohi Bhamadi 3.76 178.32 174.27 NCB Post Awarded on
22-01-2014Work in Progress
29 PB10-044 Machhiwara to NH-95 (Ludhiana Chandigarh Road) 9.25 507.14 507.02 NCB Post Awarded on
06-02-2014 Work in Progress
30 PB11-020 MB
Mansa Khurd to Kothe Mansa Khurd 3.31 203.21 200.23 NCB Post
Awarded on 28-10-
2013Work
Completed
31 PB13-051 MB Kabarwala to Sarwan Bodlan 4.05 283.87 273.49 NCB Post Awarded on
19-02-2014 Work in Progress
32 PB13-033 Mann (ODR-16) Dabwali upto Block Boundary 14.80 1001.43 965.98 NCB Post Awarded on
06-05-2014Work in Progress
33 PB13-035 Malout-Abohar road to Malout-Bathinda road (ODR Bye Pass) 4.85 284.36 276.90 NCB Post Awarded on
06-05-2014Work in Progress
34 PB13-032Muktsar-Ferozepur Road to
Lubanianwali to Marar kallan upto
Block Boundary2.58 141.92 143.88 NCB Post
Tendering under
process
Rebidding is under process as the agency did not sign
the agreement after the
allotment of the work.
Agency has been debarred from bidding for PMGSY works for 1
year.35 PB14-015
MB Aur Phillaur road to Gunachaur 2.10 115.84 121.46 NCB Post Awarded on 28-10-2013
Work in Progress
36 PB15-055 MB Patiala Samana road to Rajla 5.50 287.01 311.99 NCB Post
Awarded on 17-02-2014
Work in Progress
37 PB16-022 Nangal SH-22 km 61.00 to Alragan 8.30 519.02 545.14 NCB Post Awarded on
09-05-2014Work in Progress
38 PB16-023 Khanpur Khuhi to Bhangal 3.50 263.63 274.09 NCB Post Awarded on 08-05-2014
Work in Progress(RD 7.90 to 11.20) NCB Post
39 PB16-024ODR-07 KM 0.0 Bela to ODR-07 KM 8.05 District Boundary
Chak lohat8.05 599.45 595.51 NCB Post Awarded on
18-11-2013Work in Progress
40 PB17-080 Bathinda Barnala road to Tajoke 9.61 414.35 357.20 NCB Post Awarded on
20-11-2013Work
Completed
41 PB17-066 Cheema to Fatehgarh 15.76 978.49 958.51 NCB Post Awarded on 11-11-2013
Work Completed
42 PB17-082 MDR (Km 2) to Kauhrian 14.00 839.48 816.67 NCB Post Awarded
on 14-01-2014
Work Completed
43 PB17-068 Sangrur Bhalwan Road 9.95 452.94 454.27 NCB Post Awarded
on 11-11-2013
Work in Progress
44 PB17-085 Lehra to Kauhrian 9.21 732.64 719.02 NCB Post Awarded
on 14-01-2014
Work Completed
45 PB17-061 MB
SH-10 (Patran Moonak Road Km 151) to Mandvi 11.94 729.82 775.18 NCB Post Awarded on
24-12-2013Work in Progress
46 PB17-062 MB Khanouri to Mandvi Boarder 13.00 845.34 904.11 NCB Post Awarded on
24-12-2013Work in Progress
Total 455.24 24716.27
24464.73
Under World Bank Funded PMGSY RRP-II Phase XII
Sr. No
Package No. Contract (Description) Lengt
h (Km)
Amount Cleared by GoI (lacs)
Contract Award without mainten
ance cost (Rs.
Lacs)
Procurement Method
Review by Bank
Expected Bid
opening date
Comments
1 2 3 4 5 7 8 9 10 11
1 PB01-104 Ghoga to Jasrur 3.60 193.77 - NCB PostTechnical
bids opened on 12.12.2014
Rebidding is under process
2 PB01-118 Pringli to Patti Sirhali Road 5.25 247.39 - NCB Post Awarded on 24.12.14
Recently Allotted
3 PB04-019 Sirhind Morinda Road (MDR-31) to Merran 1.60 90.90 76.69 NCB Post Awarded on
10.11.2014Recently Allotted
4
PB05-064
NH-95 (Ludhiana-Ferozepur) Km.122.00 to
Basti Bhattian1.37 59.73
356.47 NCB Post Awarded on 07.11.2014
Recently Allotted
5 Dulchi ke to Kamale Wala 1.65 79.47 Recently Allotted
6 FZR City to Habibke 3.66 273.94 Recently Allotted
7PB05-068
Mamot to Saide Ke Naul 4.50 199.17255.46 NCB Post Awarded on
04.11.2014
Recently Allotted
8 Khai Mamdot Road to Tarran Wali 2.00 68.06 Recently
Allotted
9 PB07-029 Tanda Dholwaha Road (Km 3) to Harijan Abadi Jhawan 1.80 100.98 84.62 NCB Post Awarded on
07.11.2014Recently Allotted
10 PB07-034Hoshiarpur Una Road SH-22
Km No 17 to Bullanwari Road
1.66 73.79 66.94 NCB Post Awarded on 07.11.2014
Recently Allotted
11 PB07-036 Tanda Gardhiwala Road to Kotli 2.00 87.01 67.89 NCB Post Awarded on
07.11.2014Recently Allotted
12 PB07-041 Unchi Bassi to Fatehgarh 1.97 111.15 87.59 NCB Post Awarded on 07.11.2014
Recently Allotted
13 PB10-069ODR-13 (Ludhiana Pakhowal Road) to
Thakarwal1.81 99.92
88.13 NCB Post Awarded on 07.11.2014
Recently Allotted
14
PB10-084
Gopalpur to Rattangarh Mattewara Road (T-03) 4.11 215.20
435.92 NCB Post Awarded on 13.11.2014
Recently Allotted
15Kadiana Khurd to
Rattangarh Mattewara Road (T-03)
3.51 142.14Recently Allotted
16Bonkar Gujjran to
Rattangarh Mattewara Road (T-03)
2.23 116.67Recently Allotted
17 PB12-018NH-95 (Ldh.- Fzr Road) RD 58.20 Km to Kapure upto
B.B.8.10 418.00
380.18 NCB Post Awarded on 07.11.2014
Recently Allotted
18 PB15-035 Shambhu Ghanour Road to Kami Khurd 5.40 377.37 324.29 NCB Post Awarded on
12.11.2014Recently Allotted
19 PB15-060 Nabha Gobindgarh Road to Sahoi 1.40 209.41 187.95 NCB Post Awarded on
10.11.2014Recently Allotted
20 PB15-061 Nabha Malerkotla Road to Godian 7.83 527.91 383.03 NCB Post Awarded on
10.11.2014Recently Allotted
21PB15-062
Toderwal Bir Dosanj road to Tanda Bada Bridge 1.00 78.28
452.99 NCB Post Awarded on 10.11.2014
Recently Allotted
22 Saluwal to Nabha Bir Dosanj Udha Bridge 8.30 490.26
23 PB16-025 RGN Road Km 54 to Brahmpur upper and lower 2.90 152.58 151.96 NCB Post Awarded on
26.11.2014 Recently Allotted
24 PB17-071 Kauhrian to Ubhe 4.00 218.13 189.01 NCB Post Awarded on 21.11.2014
Recently Allotted
25 PB05-046 MB
T-05 (Km 25.50) to Wara Pohwindia 10.60 576.06 553.34 NCB Post Awarded on
18.11.2014Recently Allotted
26 PB06-055 MB
Shri Hargobindpur Road to Masania 1.60 78.25 61.98 NCB Post Awarded on
18.11.2014Recently Allotted
27 PB06-073 MB
Pathankot Madhopur Road to Mudhe 3.65 165.08 151.25 NCB Post Awarded on
21.11.2014Recently Allotted
28 PB06-074 MB
Mamoon Madhopur (Defence Road) Tharial 2.53 116.96 105.17 NCB Post Awarded on
21.11.2014Recently Allotted
29 PB08-045 MB Mehsampur to Mehatpur 8.01 402.87 372.67 NCB Post Awarded on
18.11.2014Recently Allotted
30 PB09-020 MB
Kartarpur-Kapurthala Kala Sanghian Road (MDR-48) to
Bishanpur2.25 116.58 98.15 NCB Post Awarded on
18.11.2014Recently Allotted
31 PB09-022 MB
Kapurthala-Jalandhar (MDR 52) to Sidh Wazir 4.50 196.61 166.39 NCB Post Awarded on
07.11.2014Recently Allotted
32 PB10-064 MB Majra Rohoun to Rahoun 2.25 114.05 111.07 NCB Post Awarded on
07.11.2014Recently Allotted
33 PB10-065 MB
Devinagar (Malakpur) to Rauni 4.70 236.95 231.89 NCB Post Awarded on
07.11.2014Recently Allotted
34 PB10-083 MB Johla to MDR-51 5.95 291.82 308.42 NCB Post Awarded on
07.11.2014Recently Allotted
35 PB11-028 MB Vare to Mandali 6.00 267.16 266.86 NCB Post Awarded on
21.11.2014Recently Allotted
36 PB12-026 MB
ODR-08 (RD 0.55 Km) to Manawan 4.89 282.07 291.64 NCB Post Awarded on
07.11.2014Recently Allotted
37 PB12-031 MB
Moga Kotkapura Road SH-16 (RD 24.50 Km) to Lande 9.10 449.09 456.77 NCB Post Awarded on
07.11.2014Recently Allotted
38 PB13-041 MB
Akalgarh to MDR-43 (MKS-JBD Road RD 11.20 Km) 4.14 195.40 186.64 NCB Post Awarded on
21.11.2014Recently Allotted
39 PB13-044 MB Singhewala to Fatuhiwala 1.40 55.99 55.88 NCB Post Awarded on
21.11.2014Recently Allotted
40 PB-14-018 MB
Mahilpur Behram Road to Cheta 4.55 180.32 164.77 NCB Post Awarded on
21.11.2014Recently Allotted
41 PB15-040 MB
Rohar Jangir Road to Mehmoodpur Roorki 3.48 207.16
314.16 NCB Post Awarded on 07.11.2014
Recently Allotted
42 Patiala Pehwoa Road to Sadiqpur Veeran 1.90 118.01 Recently
Allotted
43 PB15-044 MB
Patiala Sangrur Road to Ranbir Pura 3.00 169.31 154.82 NCB Post Awarded on
13.11.14Recently Allotted
44PB15-050
MB
Patiala Samana Gulha road to Bathoi Kalan 2.00 92.62
184.85 NCB Post Awarded on 13.11.2014
Recently Allotted
45 Patiala Samana Gulha road to Jalah Khera 1.50 61.11 Recently
Allotted
46 Patiala Samana Gulha road to Khusropur 1.01 51.12 Recently
Allotted
47 PB15-058 MB
Samana Patran Road to Kakrala 1.50 75.88 72.10 NCB Post Awarded on
13.11.2014Recently Allotted
48 PB15-046 MB
Ambala Chandigarh Road to Jawaharpur 1.30 99.74 97.37 NCB Post Awarded on
07.11.2014Recently Allotted
Total 173.46 9231.44
8209.83
Procurement plan with Method & Time Schedule -- for GOODS
Sr.No
Reference Package
No.Contract (Description)
Nos/ Quanti
ty
Estimated Cost (in ₹
million)
Procurement Metho
d
Review by
Bank (Prior/ Post)*
Expected Bid
Opening
Date
Comments
* First Contract of each State will be subject to prior review by the BankPunjab : Goods
1
Approved by NRRDA vide
its e-mail dated
13th July, 2013
Total Station 1
10.55 NCB post Oct 31, 2014
The letter of
Acceptance stands issued to
M/s Survey
Engineering &
Instruments
Factory, Ambala on Dec
26, 2014.
Auto Level 10Cone Penetrometer 10
NQBL Calibration Standard IS sieves of 45 cm dia with 10 specified sieves as per IS :460
(1985)10
NABL Calibration Standard IS sieves of 20 cm dia with 10 specified sieves as per IS :460
(1985)10
NQBL accredited Laboratory Balance Capacity 5 Kg 10
NQBL accredited Laboratory Electronic Oven Digital indicator 50 degree to 250 degree 10
Sand Pouring Cylinder Apparatus 10Compaction Test for light compaction 10Compaction Test for Heavy compaction 10
Laboratory CBR test Apparatus electronic 10Aggregate Impact tester 10
NABL digital display compression testing machine 2000 KN 10
Iron Moulds 150 MM X 150 MM 10MERLIN 10
Concrete Test Hammer 10
Bump Integrator (CRRI design)3
2
Approved by NRRDA vide its File No.
17029/1/2006/P-III dated 12th Nov,
2014
Desktops with all the necessary accessories 25
1.45 Shopping Post Jan 30,
2015Laptops 5
Printers 25
Procurement plan with Method & Time Schedule -- for SERVICES
Cont
ract
Agr
. N
o.
Cont
ract
D
escr
ipti
on
Nam
e of
the
Co
nsul
tant
Cont
ract
Pr
ice
Proc
urem
ent
Met
hod
Revi
ew b
y Ba
nk (
Yes
/ N
o)
WB
NO
to
the
awar
d of
Co
ntra
ctD
ate
of
Awar
d of
Co
ntra
ctD
ate
of S
tart
of
As
sign
men
tCo
mpl
etio
n D
ate
Com
men
ts
1 of
201
4-15
External Audit (Statutory Audit) of Program Implementing Units (PIUs) and SRRDA located in the State of Punjab for the Financial Year 2013-14 to 2015-16.
M/s R. K. Deepak & Co., Chandigarh
₹ 2,
42,1
36
QCBS Post --
23-Ju
l-14
23-Ju
l-14
31-O
ct-1
6
The Contract Agreement
with M/s R. K. Deepak & Co.,
Chandigarh has been
signed on Jul 23, 2014.
Undertaking Internal Audit on half yearly basis for the financial year 2014-15 and 2015-16 of the State Rural Roads Development Agency office at Mohali and at Seventeen (17) Program Implementing Units (PIUs) at different locations in the state of Punjab
--- ₹
300
,000
(ind
icativ
e)
QCBS Post --
31-M
ar-1
5 (in
dica
tive)
31-M
ar-1
5 (in
dica
tive)
--
The Request For Proposal
(RFP) document is
being finalized for issuance to the shortlisted
CA firms.