Government of Madhya Pradesh Water Resources Department
Mantralaya Vallabh Bhawan, Bhopal
Memo No. DS/DRIP/59/DSRP/31/o To,
Bhopal datedo/ltpo2!
Chief Engineer (BODH)
Water Resources Department,
Bhopal (M.P.)
Sub:- Reconstitution of new Dam Safety Review Panel (DSRP) for Dam Rehabilitation and Improvement Projeet (DRIP) -II & II.
Ref (1) Minutes of meeting Memo no. 778/DS/DRIP/189/DRIP-II Proposal 2020, Bhopal dated 09-12-2020
2) Memo No. DS/1/CP/31/2009/815, Bhopal, Dated10/08/2020. (3) Memo No. DS/1/CP/31/2009/1052, Bhopal, Dated 18/09/2019.
Government of India decided to take up Dam Rehabilitation and Improvement Project (DRIP) - II and II which is approved by the Department of Economic Affairs (DEA)
and concurred by World Bank with a funding pattern in ratio 70:30 (World Bank: Agency). Constitution of Dam Safety Review Panel (DSRP) and Dam Safety Inspection by DSRP is
mandatory for implementation of project. The State Government has already constituted DSRP and Common pool as per the guideline of CWC stated in Memo No.
DS/1/CP/31/2009/1052, Bhopal, Dated 18/09/2019.
There are 27 number dams envisaged to be rehabilitated in Madhya Pradesh under DRIP
phase II & II. DSRP visits only 11 number projects could be completed due to travel
restrictions in the wake of Corona Pandemic. A review meeting between the officers of
Central Water Commission (CWC) and Madhya Pradesh Water Resources Department
(MPWRD) held on 9th Dec 2020 under the Chairmanship of ACS, MPWRD, in which officers of C.W.C. suggested to form new DSRP panels with the experts from Madhya
Pradesh. So, The State Government is pleased to reconstitute new DSRP and Common
pool as per the Minutes of Review meeting on preparedness of Madhya Pradesh for
DRIP phase II & III as stated below.
DSRP 1: S. No. Designation Name
Shri Manoj Aacharya Shri T.R. Suman
3. Shri M.G. Choure
- Chairman
- Member, Hydro Mechanical expert - Member, Construction Supervision Expert
-Member, Hydrology_
2.
4. Shri R.C.Maheswari Shri Mahesh Chandra Upadhyay-Member, Geologist5.
18 DSRP -2:
S. No. Name Designation 1. Shri S. K. Khare - Chairman
Shri Bharat Gosavi -Member, Design Expert Member, Hydro Mechanical expert
-Member,Hydrology |- Member,Geologist
2.
3. Shri R.C. Saxena 4. Shri Ashok Goyal 5. Shri M.P. Shrivastava
Common Pool:-
S. No. Name Designation Shri Ranjit Chandra Chakraborty-Dam Safety Specialist Shri Y.C. Sharma
1.
2. - Design Expert
Terms and Conditions for Chairman and Members of the Dam Safety Review Panel
and Common Pool as approved by the Finance Department, Government of MP. as
indicated below:- Remuneration@ Rs. 7500/- (Rupees Seven Thousand Five Hundred only) per day spent for the work as per the Government of Madhya Pradesh, Water
Resources Department, order no. DS/1/CP/131 /2017/MPS/31/1266 dated
03.07.2017 and Memo No. DS/1/CP/31/2009/815, Bhopal, Dated10/08/2020 as and when revised by the Government of M.P.
I.
T.A. and D.A. @ as admissible to Grade-I Offcers of the State Government wil be payable when they are on tour.
II.
Members of the panel will be eligible for accommodation in the Government Rest
House/Inspection Bungalovws, Circuit Houses ete, on the same conditions which are applicable to the Grade-I officers of the State Government.
III.
Tems of reference for Dam Safety Review Panel as indicated in Guidelines for
Safety Inspection of Dam published in January, 2018 under Chapter 10 -Comprehensive Dam Safety Review.
IV.
The Expenditure will be chargeable to respective head of DRIP - II& I
(V.S.Tekam) Deputy Seceretary,
Govt. of M.P.Water Resources Deptt.
Bhopal, Dated Of/1 202 Endt. No. DS/DRIP/59/DSRP/31/02 Copy forward to:-
1. Secretary, Government of India Ministry of Water Resources, River Development &
Ganga Rejuvenation, Shram Shakti Bhawan, Rafi Marg, New Delhi- 110001. 2. The Accountant General, Madhya Pradesh, Gwalior/Bhopal. 3. The Principal Secretary, Finance Department, Government of Madhya Pradesh,
Vallabh Bhawan, Bhopal. 4 The Chief Engineer, Dam Safety Organisation, Central Water Commission, Sewa
Bhawan, R.K. Puram, New Delhi- 110 066.
5. The Project Director, Dam Safety Rehabilitation Dte& Project Director, DRIP,
Central Project Management Unit, Central Water. Commission, GOI, 3d Floor, CWC Library Building, R.K.Puram, New Delhi 110 066.
6. The Engineer-in-Chief, Water Resources Department, Tulsi Nagar Bhopal.
7. The Chief Engineer, Chambal Betwa Basin, Bhopal. 8. The Chief Engineer, Water Resources Department, Hoshangabad. 9. The Chief Engineer, Narmada Tapti Basin, Indore.
10. The Chief Engineer, Wainganga Basin, Seoni.
11. The Chief Engineer, Dhasan Ken Basin, Sagar. 12. The Chief Engineer, Ganga Basin, Rewa.
13. The Chicf Engineer, Yamuna Basin, Gwalior. 14. Chief Engineer, Rajghat Canal Project, Datia 15. Chief Engineer, Water Resources Department, Ujjain
16. Web Manager, O/o E-in-C, WRD to upload for order on website.
Copy to Concern 1- Shri Ranjit Chandra Chakraborty, Retired Secretary, Mob. No. 9425372734 2- Shri S. K. Khare, Retired Chief Engineer, Mob. No. 9425113432 3- Shri Manoj Aacharya, Retired Chief Engineer, Mob. No. 9893243688 4- Shri Bharat Gosavi, Retired Superintending Engineer, Mob. No. 9340108335 5- Shri Y.C. Sharma, Retired Superintending Engineer, Mob. No. 9425007969 6- Shri R.C. Saxena, Retired Superintending Engineer E/M, Mob. No. 8989950590 7- Shri T.R. Suman, Retired Superintendent Engineer E/M, Mob. No. 9827264814 8- Shri M.G. Choure, Retired Superintending Engineer, Mob. No. 98262365 1 6
9- Shri Ashok Goyal, Retired Superintending Engineer, Mob. No. 9425029428
10-Shri M.P. Shrivastava, Retired Director (GIS) Mob. No. 9921140609
11-Shri Mahesh Chandra Upadhya, Retired Director (GIS), Mob. No. 9630094788 12-Shri R.C. Maheswari, Retired Executive Engineer, Mob. No. 9302306652
Deputy Secretàry, Govt. of M.P.Water Resources Deptt.
2ter Se Guidelines for Safety Inspection of Dams January 2018
Chapter 10. COMPREHENSIVE DAM SAFETY REVIEW c
Comprehensive Dam Sakety Review iss a procedure for assessing the dam safety as an entirety, which comprises a detailed study of dam engineering with specialist supports, and assessment of the records and reports from investigation, design, construction,
commissioning, operation, instrumentation monitoring and surveillance
activities.
dam owner or dam operator- who is
responsible for self-supervision or internal
supervision and the second pair of cyes has to belong to an independent body -
usually a supervisory authority, boards of
experts, consultants or a mixture of the above-mentioned bodies. maintenance,
The need for comprehensive safety review
of a dam has also been emphasised by the
MinistryDevelopment and Ganga Rejuvenation in
the National Dam Safety Bill 2017, which is
in the active stage of consideration for
introducing in the Parliament.
of Water Resources, River A comprehensive dam sakery review should
assess the integrity of a dam against known
failure modes, review of monitoring
program, program on-site inspections, and
review mechanisms for the various types of
dams based on current acceptable safety
criteria (e.g. engineering standards, dam safety guidelines) or risk management criteria, which may defer from original construction time of the dam.
The draft National Dam Safety Bill 2017
requires owners of specified dams to
arrange ftor comprehensive satety evaluation
of their dams through an independent panel of experts.
Comprehensive dam safety review report is
produced to document the results of safety
review and to recommend remedial or
As pointed out in 1COLD Bullcin 154, the main purpose of the comprehensive safety
maintenance work. Dam owners may use
risk assessment techniques with safety
reviews to determine the urgency and extent
of works and to prioritise remedial works
review is to obtain an overall view of the
actual state of safery of the dam, and
determine whether any rehabilitation (structural as well non-structural) measures, modifications or alterations, are
necessary to ensure that the level of safery is appropriate, and ensure that the principle of continual improvement is observed.
for their dams
In view of ever changing economic
importance of the dams as well the changing
hazard perceptions for the downstreamn, the
comprehensive safety reviews of the dams
are generally being conducted globally at
regular intervals of typically 5-30 years (Switzerland- 5 years, China, 6-10 years,
Canada, 5-10 years, United Kingdom -10
years, Japan-30 years etc.).
The Dam Safcty Review Panel should be constituted to carry out a comprehensive
assessment of the dam system and provide
answers to the following questions:
Does the dam conform to current
regulatory requirements? Are All over the world the usual practice of
supervision of dams is based on the "four-
cyes principle. This applies to dams in state
or public ownership or privately-owned dams as well as. The fundamental principle is that the first pair of eyes belongs to the
the managerial and
organizational currently in placc sufficient to
maintain the levels of safety in
arrangements
conformance with the above
Doc. No. CDSO_GUD_DS_07_v1.0 Page 159 of 190
hleliH oe Maleny Inapethon f Dunn Jawary 29I
uiromwN Cmpehoalve anlety revlewi
)eview all vailalle releyan davabases, infomaon ineluling
denbgpn veports, e51e9n epos,
And past rehabiliratio cords omprehensive natey vevlewn ArO normally conhctel erlolicully with the froqueney leending on tlhe level of rink to people, property and the environment, "The Interva tor
BUPVelllanee records deermine CACI eAUse of prolblem, It may also include arny design hmivations, and deficlencics in performance, and inlication of adverse trends, if any.
comprehensive Henerally from 5-10 yearn; nOmettmes up to 0 years lepenling On the potential comscquenees of the failure of the dam. The satety review has 1o be performed by experts with adequnte education, experience and expertise. In practice for all large dams the review is often made by a group or Independent Panel of Experts' (comprising of qualitied engineers and experts in other
ticlds, e.g geologists, dam safety expecrt, seismic expert etc.), called "Dam Safety Review Panel (DSRP)". In India, it is proposed that DSRP cvaluations of cach large dam are undertake once in 10 years. During this performance, any safety incidences, results of satety inspections, instrumentation data, major repairs and maintenance activities are
comprehensively analysed.
Nalety reviewa I
b) Gencral assessment of hydrolopjeand hydraulic conditíons in view of the mandatory review of desiyn flood.
c)General assessment of seisnic safety of dam, especially if there is a change in the seismic zoning of the dam location or any old dam not designed for scismie loading at that point of time.
d) Detailed on-site inspection of the dam and appurtenant structures;
including changes that were made and the reasons for such changes or
cvaluation, the dam
design revisions. Review any potential for the development of unsafe conditions (eg. unexpected foundation conditions, presence of scepage, indications of distress or
erosion, mechanicai equipment
malfunctioning, ageing of the dam
10.1 Compulsory movements, Comprehensive Dam
Safety Reviews in Certain and electrical
Cases etc.) e)Site inspection and witnessing of
testing of gates, hoists and valves that fulfil dam and reservoir safety functions (íincluding their operating equipment, power control,
The comprehensive dam safety evaluation
should be compulsory in the case of:
(2 major modification to the original structure or design criteria;
Supplies and (b) discovery of an unusual condition
at the dam or reservoir rim; and and protection
telecommunication systems). Testing may not be necessary if the Dam
has an extreme hydrological or seismic
Owner completed and event. documented recent tests that
adequately requirements (both hydraulically and structurally; however, the operation and performance records for the tests should be reviewed in depth).
saisfy the test 10.2 Comprehensive Dam
Safety Review Procedures
The terms of reference of the comprehensive dam safety evaluation shall include but not limited to: Assessment of the adequacy of the
dam and its appurtenant structures,
Doc. No. CDSO_GUD_DS_07_v1.0 Page 160 of 190
er Se Guidelines for Safety Inspection of Dams L
January 2018
including all hoisting loacdings, update current material
properties. gates,
arrangements and valve systems that fulfil dam and reservoir safety functions, to safely perform to current intended functions for all
Terp Planning, secretarial and assistance
coordination of a visit of DSRP team for
loading conditions. The reviewers are unlikely to reanalyze the dams but may identify if there is a need for further analysis, design or assessment of an element of the
inspection of identified dams shall be done
by the concerned dam owner agency. Sufficient time (blocked period of visit) shall
be allocated for inspection of each dam
depending upon Size of dam and for
finalization of inspection report. The period
and timings for dam inspection must serve
the basic purpose of comprehensive review; it may sometime require the multiple
inspections.
facility and identify this as a dam safety issue.
g) Review
management system for its adcquacy and compatibility with current state of-the-art design
approach, surveillance, testing procedures and records, and
providing any, clarifications on
matters relating to operations or
dam safety to surveillance staff.
of the dam safety
methods and
operating. 10.3 Details to be provided to and
maintenance and DSRP before inspection
A memorandum for dam inspection shall be
prepared by the concerned dam manager/ Executive Enginer covering: the dam
salient features; recommendations of carlier h) Review previously identified dam
safety issues, and the adequacy of their resolution, or whether there are
impediments that prevent their
resolution.
safety inspections and compliances; design flood revisions; understanding of present
anticipated and any difficulties
the
remedial problems
measures encountered
and
being and n operation
i) Review of the organization of
operational infrastructure.
maintenance of dam. The memorandum
resources and shall be made available to cach member of
DSRP team for examination at least three months ahead of proposed inspection.
)Review of emergency preparedness procedures,
Cxercises, tacilities and equipment,
and implementation part with al
disaster
including training, If possible, owner agency must facilitate the
DSRP team to interact with experts who
had been involved in construction stage of
dam, important rehabilitations, any past Expert Group constituted for some need based unscheduled inspections etc. in order to have one to one interaction for
concern management
agencies
k) Review of known potential hazards and dam safety threats
Dam Hazard comprehensive assessment of past issues. )Review Classification
of the
The technical memorandum shall consist of m) Review of the outputs from the
identified potential failure modes
key
all relevant details/data/drawings for thec dam project to be inspected by the Pancl of Experts and in general includes:
and their performance indicators. determine the
appropriateness of the design loads
and conditions such as the need to (a) General Information
flood estimates, seismic i, Scope of project
revise
ii. Basic data and salient fearures
Doc. No. CDSO_GUD_DS_07_v1.0 Page 161 of 190
January 2018 Guidelines for Safety Inspection of Dams
ii. Issues related to safety of dam (e) Dam and Spillway
iv. Previous Inspection reports i. Special problems
v. Details of key personnel ii. Foundation including treatment
vi. All manuals i.e. Reservoir Operation Manual, Operation and Maintenance Manual, Sccurity Manual etc.
treatment of faults shear zones weak zones, curtain / consolidation
grouung, drainage provisions, any treatment, other special cutoff
vii. Emergency
Communications, Auxiliary Power, Downstrcam Warning system & Security of site.
preparedness trench, diaphragrm walls etc.
11. Design criteria and result of stability
analysis
iv. Special studies
Dynamic analysis etc.) (b) Hydrology (Finite element,
i. Description of drainage basin v. Design and drawings of spillway
gates, hoist arrangement, sluicegates,
emergency gates, auxiliary gates, review of adequacy of strength of
ii. Original inflow design flood report
ii. Highest observed inflow flood along with date and ime
exisang and hoisung gates arrangemernt especially in case older system not conforming to present
design criteria if any, auxiliary power
iv. Spillway capacity at FRL & original MWL
v. Elevation-Area-Capaciry of the reservoir arrangement etc.
vi. Bathymetry report/ data if any, t assess present gross and l1ve storage
vi Adequ2cy of design - from dam
safery consideraions of dam vii. Hydraulic design of Spillway and
Energy Dissipation Arrangements including past model study reporrs if .
()Geology including geology
geological reports i. Dam Site
any.
Vil. Instrumentatuoon i Qualiy and sufficiency of the
geological investigaions.
analysis and interpretation of instrumentation data including structural behavior
ii. Special problems and their treatment reports.
iv. Reservoir competency
geological report ix. Pre-construction material testing
reports including adequacy of field and
per as
v. Slope stability issues along reservoir laboratory invesugauons, appropriateness of materials selected
rim. etc.
(d) Layout including Drawings x. Post-construction testing reports, if i Dam any.
i. Spillway xi. Seismiciy Seismic Parameters approved by the National ii. Junction between Embankment &
Concrete/Masonry dams Committee on Seismic Design Parameters for Dams)
iv. River/Canal outlets Construction history
v. Instrumentaion g) Dam incidents/failures, remedial
measures/modifications undertaken
Doc. No. CDSO_GUD DS_07_v1.0 Page 162 of 190
Guidelines for Safety Inspection of Dams January 2018
h) Reservoir Operation & Regulation constitution and composition of the DSRP
shall be as follows: Plan
i. General a) Each DSRP shall consist of at least six
key experts- with one Chairman' and
others designated as 'members' as per the detail given in Table.10-1. The core
personnel shall be identificd based on
comprehensive expertise. For ensuring the continuity and workability, the core composition of
any team shall normally not be altered
except for compelling reasons.
. Reservoir filling
. Operation manual
iv. Water release protocol normal
condition and during floods. their dam safety
All these pertinent records (including design records, construction records along with in
recent operation and
with built drawings, maintenance records along
shall be made instrumentation data)
available at dam site during inspection by
the dam manager/Executive Engineer for
examination by the DSRP team.
b) During any evaluation by DSRP, one or
required disciplines of Central/State may be
included as additional member of
DSRP team for facilitating sufficiency need-based
the more experts from
Further investigation may be required prior to concluding a comprchensive dam safety
review. The investigation may include:
and for meeting requirements of domain expertise for
inspections. based
n special specific circumstances, on
where insufficient data exist, the dam may have to be surveyed and
new plans drawn
recommendations of the DSRP
Chairman, more experts shall also be
included in the team as 'special invitee'.
sampling and testing of materialsin the dam and its foundations in c) The members of DSRP may comprise
of working as well as retired officials
Central
the required conjunction geotechnical drilling and mapping
to
from the Government
State Governments, Organisations, Public Sector Undertakings, Reputed Private Institutions, reputed freelance
experts etc. The Chairman of any DSRP
team shall be a reputed expert having
proven credentials in dam safety area
along with adequate experience in
dealing with dam safety matters. The
minimum qualification and experience
of the other DSRP members as per the details given in the Table. 10-1. A
minimum of tifty percent of the
members of DSRP shall be from outside
calculation of new revised design flood and flood routing studies,
hydraulic model studies etc.
Any advance modelling to assess the
exact behavior of dam and predicted
forecasting of critical parameters;
may require in-situ various material
properties as inpuut
revision of seismic loadings
10.4 Composition of DSRP
of the State. Due to large number of dams in each State, the some of the States may have more than
one DSRP with a view to ensure and imely
completion of all specified comprehensive dam safety evaluation. In order to ensure
uniformity composition,
d) During the inspection by DSRP, DSRP
team shall be accompanied by an officer
of not less than a Chief Engineer/ General Manager in rank, of dam
owning agency, and wrap up meetingB of standardization
framework and
the for
Doc. No. cDSO_GUD_DS_07_v1.0 Page 163 of 190
January 2018 Guidelines for Safety Inspection ot Dams
shall be with the Head of Department. In case of any unscheduled inspection during hydrological or seismic event, wrap up meeting shall be with Principal Secretary/Executive Director of dam
owning agency
term and long term rehabilitations,
material testing, Physical modelling, Advanced Modelling ctc. (x) Key
Records/Information/Reports,
Key Drawings-original and modified
xii) Relevant photographs and detail
of videos
(xi)
DSRP will consist of the members of the Recommendations of DSRP may also
include: b)
following domain expertise:
i Dam Safety Specialist 1) emergency measures or any
actions, if required, to assure the4 immediate and long-term safery ot
i. Design Expert
11. Construction Supervision Expert the structure.
iv. Geologist
i1) related to design, construction,
operation, monitoring and evaluation, and
inspection of the structure, if
required.
remedial measures and actions v. Hydrologist
vi. Hydro - Mechanical Expert maintenance,
vii. Instrumentation Expert
vii. Seismic Expert
Members of DSRP shall have sufficient ii) investigations and analyses, if
required.
additional detailed studies, experience in the field of safety of dams
preferably from the areas of dam-design,
hydro-mechanical engineering. hydrology geo-technical instrumentation, seismic, dam-rehabilitation or such other field ctc. The requirement and minimum qualifications of various members of the DSRP are described in Table 10-1.
iv improvements maintenance and inspection of
dam, if required.
recommendations for investigations, in routine
v)short-term and long-term risk reduction measures (structural well
as non-structural), and comments 10.5 Reports of
Comprehensive Safety Evaluation
on time frame for their
implementation c) After dam inspection visit by DSRP,
a wrap up meeting shall be arranged by dam owner, wherein head of
department along with concern Chief Engineer, and his/her complete team dealing with dam matters shall attend it. In case unscheduled dam safety inspection i.e. unusual flood event or seismic event, wrap meeting shall be arranged with concern Principal Secretary or higher rank official in case of Water Resources Department, or with CMD in case of Public Sector
Separate report shall be prepared by DSRP for each inspected dam, and shall include, but not limited to:
a) The outlines of Comprehensive Dam
Safety Review report should include these Chapters, ) Description of
dam and its operation, (i) Evaluation
of Design, Construction and Analysis detail, (ii) Inspection, Testing and
Examination Detail, (iv) Hydrologic Review, (v) Seismic Review, (vi) Instrumentation and Evaluation, (vii) Risk Consequences, (viii) Future
Performance Undertakings, with highest authority in case of privare owner to apPpraise Monitoring, (ix)
Recommendaions; issues for short
Doc. No. CDSO_GUD_DS_07_v1.0 Page 164 of 190
Guidelines for Safety Inspection of Dama
critical issues experlenced by the
DSRP OpovmorH And lold eraeoned lumllar with the dam and in ooraton shoulkd
or the d) The report shall be prepared by
oln the T'eam OXAmnalon They nhould he
DSRP team jolntly within a reasonable time after completing the visit, and ench report shall be slgned by every member of the DSRP team before its submissicon to the Water
CApablo o anAworlng or obtalning AnAwOrH t0 quostlons the Toam may
have coneernlng KIBUng COndilon Ancd the operatlon of the da,
b) Dam Inapection shall ho earrled ou
by DSRP an por thone Guldeinen for
Safoty lnapocthon of Dams-covering
inspection items brought out in Annexure-1, and foCuning on features, CVents and evidence an brought out in
Annexurc-|| of this chapter,
Resources Department or Dam Safety Organization of the State an well as further onward transmission,
c) In case final report submisslon by DSRP needs more time, an lInterim
highlightingReport Various issues needs to be important
submitted within two months from the date of dam inspection visit and final report submission may be discusscd with concern dam owner,
The DSRP will be advisory in
function and provicde an expert
opinion on nafety condition8 of the clam and various studies eonducted
recommendations8
C)
as well as CDSO in case DSRP has And give been constiruted by CDSO under special conditions.
SUuggestions for further improvement and rehabilitation recquirements.
of implementation "ehabilitation project for any dam, all
necessary reviews must have bcen
completed and the review pancl's
d) For ny 10.6 Roles and the
Responsibilities of Dam Safety Review Panel
recommencdations must havc becn The roles and the responsibilities shall
include as under. eliscussed with the (Chief Ingincer and Senior Officers of Water Resources
Safety Dam Department Organisation.
a) DSRP members shall have the desirec and
and ability to make a comprchensive review of all data related to the dam
thorough onsite
examination. They should be capable
of making in-depth evaluations and
arriving logical conclusions. DSRP
should be observant, have good
analytical reasoning, and not bc
disconcerted when confronted with
Any rchalbilitation work propo8al to
be undertaken by a dam owner must include the DSRP.
C) and make a
recommendations of
In cases, where 1DSRP after the comprchensive dam safcty cvaluation recommends a remeclial action, the State Dam Safety Organisation shall pursue with the concerned owner of the large dam to ensure that remeclial measures arc carriccd out in time, for which thc concernecl clam owner shall
voluminous detail. They should be to concentrate on
and safety
conditions able considerations conducive to dam failures and be alert
for changed conditions Team suspicious,
non-complacent, SOund
members should be provide adequate funds. inquisitive, methodical, and
engineering judgment. They should have an independence view and avoid
quick,
In cascs whcre thcre are unresolved 8) points or issucs that emerged berween DSRP and the owner of the dam, the matter shall be referrecd to the State
possess
unfounded conclusions.
Doc. No. CDSO_GUD_DS_07_v1.0 Page 165 of 190
Guicdelines for Safety Inspection of Dams anuary 2018
safety experts. Appropriate communication
is sent to concern expert and the dam
owning agencies that have engaged them as
DSRP Members.
Dam Safety Organisation, and in case, no agreemeni is arrived at, the matter
shall be referred to the Central Dam
Safety Organisation (CDSO) which shall give requircd guidance wherever
and necessary send their recommendations to the State GOvemment concerned for their
implementation.
10.7 Empanelment of Members
of DSRP
CDSO will maintain a register ot
accredited experts who may be appointed as members of the DSRP by the States/ dam Owners. Accreditation of DSRP
be done by Committee
members will the
Empanclment Chairmanship of Member (D&R), CWC.
Basic information about the potential panel members is collected by CDSO through
online invitation of application on official
web site of CDSO/CWC and submitted to
under the
the Committee for approval. The Committee after the review may seek any
additional information as necessary and
evaluate the candidate based on the
defined criteria and recommend the
for suitability empanelment as a member of DSRP and
will upload the detail of empaneled experts
on official web site for the reference of
of the candidate
dam owners.
DSRP members are enrolled for a initial
period of 3 years. The performance of the
DSRP members to be reviewed based on
the dam safety evaluation reports
submitted by them, their readiness for
pertorming the assigned evaluations in the
defined ime frame and the quality of the
recommendations and suggestions, as well
as feedback of danm owners.
The Empanelment Committee considers
and the pertormance evaluations determines the renewal of the accreditation
for a further period of 3 years or dropping
their names from the list of accredited dam
Doc. No. CDSO_GUD DS_07_v1.0 Page 166 of 190
Guidelines tor Satety Inspection of Dams Anuary 2018
Table 10-1. Minimum Qualification Criteria for the Members of DSRP
S1. Minimum No. Experts Experience Qualification
Experience in handling dam safety related issues
of minimum of 5 number of large dam projects
Additional weightage in case cundicdate hacd been a
member of to
B.E./B.Tech. or cquivalent degree in Civil Engg. Preferably Master Degree in Geotechnical
Engg/ Geological Engg /Water Resources Engineering/Hydrology or Master degree in Geology or Engincering
Geology
m that handled disasters of any
ype (cspecially related to cdam disasters) at
national and international level.
Have ar least 15 ycars of relatecd expericnce in
design, construction, safety evaluation, and/or
operation of dams. IExperience of rehabilitatlon of
old dam
Dam Safety
Expert 1.
structures Would Aet aclditional
weightage. Professional expcricnce of inspection of dams,
instrumentation, emergency action planning ctc.
Experience in planning and designs for minimum
of five large cdam projects. B.E./B. Tech. or equivalent degree in Civil Engg. Preferably Master
Degree in Structural
Engg./ Hydraulic Engg. / Water Resources
Development
Have at least 15 years of relatecl expericnce in
planning and design of large clam projccts.
Experience of rehabilitation of old dam structurcs
would get additional weightage.
Design Expert
Experience of Construction, Work Supervision and Quality Assurance for a minimum of 5 large
B.E./B. Tech. or dams. cquivalent in Civil Engg.
Preferably Master Degree
in Structural Engg. /
Hydraulic Engg. / Water
Resources Development
Experience of rchabilitation of old dam strucrurcs
would get additional weightage. Professional experience of at least 15 years in
construction of dam projects.
Construction
Supervision Expert
3.
Master Degree in
Geology / Engineering
Geology
Experience of hanclling various geological aspccts
of minimum of 5 large dam projects.
Professional expericnce of ar least 15 ycars in
dealing with enginecring gerological aspects of water resources projects
Geologist
Experience in dealing with hydrological planning of major dam projects especially design flood
estimation, review of design floodl, design storm
inputs, secdimentation aspccts ctc. ot at least 10
large dam projects.
Additional weightage for an expert having exposure to various relevant hydrological
modelling tools, work done for dam break
modelling, inundation mapping, development of emergency action plan ancd its implementation etc.
Professional experience af at least l5 years in
denling with hyclrological aspects of water resources projects
B.E./B. Tech. or
cquivalent in Civil Engg, Preferably Master Degree
in Hydrology / Hydraulic Engg. 7 Water Resources
Development
. Hydrologist
Hydro Mechanical
B.E./B. Tech. or
cquivalent. in Civil/ Mech. Engg, Preferably
Experience in planning and design of Gates &
Hoists for a minimum of 5 large dam projects. .
Expert
Page 167 of 190 Doc. No. CDSO_GUD_DS_07_v1.0
anuary 2018 Guidelines for Satety Inspection of Dams
SI. Minimum Experience Experts Qualification
Master Degree in Structural Engg. / \Water
Resourees Development
No. IExperience in rehabilitation of spillway gates,
under-sluice gates, emergency gates, ercction of
H.M. works etc. would get acdditional weightage.
Demonstrate relevant experience during the last
10 years prior to empanclment
Professional expericnce of at least 15 ycars in
designs of HM Works of large dam projects and
cspecially works done at detail cngincering
projects and rehabilitation HM works done,
lExperience in planning and installation of all kinds of dam instruments for a minimum of three
B.E./B.Tech. or large dam projects. equivalent in Civil Engg Prefcrably Master Degree
in Structural Engg./ Water Resources
Demonstrate relevant experience during the last
10 years prior to applying for empanelment.
Experience of rehabilitation of old dam structurcs
would get additional weightage.
Professional experiene of at lcast 20 years in
design of dam projects.
Instrumentauon 7.
Expert
Devclopment, or Master Degree in Physics
Expcrience in planning and designs for minimum
of five large dam projects accounting for scismic
loadings, having thc exposure of time history
series as well as scismic spectra will be an
additional advantage. Also work done for site
specific seismic design parameters would be given
additional weightage
B.E./B. Tech. or equivalent in Civil Engg
Preferably Master Degree
in Structural Engg. / Physics./ Water Resources Development or Master degree in
Geology/ Engineering Geology
8 Seismic Expert Demonsrate relevant cxperience during the last
10 years prior to applying for empanelment.
Experience of rehabilitation of old dam structures
would get additional weightage.
Professional experience of at least 15 years in
design of dam projects.
Experience in architectural planning, design and landscaping of Water Resources Projects
Additional weightage for any work relatedto tourism development done for any dam which
may include planning, design, supervision during construction, and any other works rclated to it
Professional experience of at least 15 years in activities related to Architecrure planning and
landscaping Demonstrate relevant experience during the last
10 years prior to applying for empanelment
Architecture
PlanningLandscaping Expert
B.Arch. degree in
Architecture and Planning preferably M. Arch degree in architecture
and
9.
Note: The DSRP «spert hsted at Si. No.9 shall be part of DSRP team in case dam is having Tourism
Component or derelopment of Tourism Component is being proposed by dam owning agengy keeping in view the
tourism potential as well as financial implication etc
Page 168 of 190 Doc. No. CDSO_GUD_DS_07_v1.0