SOQ Pre-Submittal Meeting
VAL VISTA WATER TREATMENT PLANT
REHABILITATION 2018
Design Services
and
Construction Manager at Risk Services
Project Number WS85230052-1
Welcome and Introductions
George Goodale, Contracts SpecialistDesign and Construction [email protected]
Trevor Bui, Deputy DirectorEqual Opportunity [email protected]
Raghu Nandan, Civil Engineer III, Team LeaderWater Services Department
Steve Fernandez, Civil Engineer III, Project ManagerWater Services Department
Meeting Information
Please sign-in
Please hold questions until after the presentation
This is your ONLY opportunity to ask the City Staff
questions
Agenda
Project Description
Scope of Work
Small Business Enterprise (SBE) Requirements
Submittal Requirements
Selection Schedule
Questions?
Val Vista Water Treatment Plant
Insert photo
Plant Capacity: 220 mgd
Year Built (original plant): 1975
Plant Site Area: 150 acres
Facility Needs Val Vista Water Treatment Plant Rehabilitation to include:
The City anticipates the rehabilitation/replacement of the following treatment
systems to be included, which may or may not be all inclusive of what will be
required for this project:
Chemical Feed Stations
West Plant Bar Screens
Solid Handling Facility Polymer Feed System
Sludge Collectors
Reservoir Electrical Building
East Plant Inlet Electrical Building -Switchgear
East Plant Sedimentation Basins 1-8 Launders
Ferric Chloride Bulk Storage Tanks
West Plant Filter 1-8 Rebuild & GAC Conversion
***Val Vista Water Treatment Plant Rehabilitation – 2014 Future Rehabilitation
Plan Report ***
Design Firm Project Scope of Work
Prepare a condition assessment report and provide recommendations for phasing of
construction work for 2018, 2022 & 2026;
Develop conceptual design report and plan (30%);
Develop 60%, 90% and 100% design plans, final design report and associated construction
specifications;
Provide Opinion of Cost at 30%, 60%, 90% and 100%;
Coordinate with Planning and Development for plan approval;
Conduct project related design progress meetings;
Coordinate with the Public Works Facility Review Committee if required;
Design the facility with energy conservation measures incorporated;
Conduct project related workshops with work groups relocating to new facility as
needed;
Design and coordination of power/utilities to the site;
Review cost models provided by the CM@Risk at 60% and 90% design;
Provide pre-construction services,
Insert Photo
East Plant Inlet Electrical Building -
Switchgear
East Plant Sedimentation Basins 1-8
Launders
Solid Handling Facility Polymer Feed
System
West Plant Bar Screens Chemical Feed Stations Sludge Collectors
CMAR Design Services Project Scope
Provide detailed cost estimating and knowledge of marketplace conditions
Provide project planning and scheduling
Provide for construction phasing and scheduling that will minimize interruption
to City operations
Provide alternate systems evaluation and constructability studies
Advise City on ways to gain efficiencies in project delivery
Provide long-lead procurement studies and initiate procurement of long-lead
items
Assist in the permitting processes
Participate with the City in a process to set a goal for local and SBE
participation and implement the local and SBE process
Protect the owner’s sensitivity to quality, safety, and environmental factors
Advise City on choosing green building materials.
CMAR Construction Project Scope
Select subcontractors/suppliers for this project
Prepare a Guaranteed Maximum Price (GMP) proposal that meets the approval of
the City
Coordinate with various City of Phoenix departments, other agencies, utility
companies, etc.
Arrange for procurement of materials and equipment
Schedule and manage site operations
Bid, award, and manage all construction related contracts while meeting City bid
requirements including the local and SBE participation goal
Provide quality controls
Bond and insure the construction
Address all federal, state and local permitting requirements
Maintain a safe work site for all project participants
Submit The GMP in CSI Format
CSI Format for Organization of Specifications and materials
http://academics.triton.edu/faculty/fheitzman/csiformat.html
Vendor Registration
Register in the Vendor Management System PRIOR to submitting a Statement of Qualifications.
New Requirement –Include the Vendor Number on the cover of the
Statement of Qualifications and
Bid Proposal Package/Envelope.
New Firms - After Registering, the City will email a Vendor Number within two days.
How to Register Information is available at:https://www.phoenix.gov/finance/vendorsreg
Subject to City of Phoenix Code, Chapter 18, Article Vl, pertaining to participation of Small Business Enterprise firms
NO established small business goal for Design Contracts
Established by City of Phoenix Goal Setting Committee
Goals based on certified SBE firms available in each of the specified trade areas identified in the project specs
Trade areas with less than 3 certified SBE firms are not considered in the calculation of the overall goal
Successful Prime will work with the Small Business Team prior to goal setting
CMAR Goals are required to be met at each GMP and during the life of the project
Goal Setting Methodology
Small Business Enterprise (SBE) Program
SBE Pre-Award Requirements
No SBE documents due at time of submittal
Outreach Efforts and SBE Plan should be
actively in development
“Good Faith Efforts”
If Contractor is unable to meet the goal
Must submit fully documented waiver request
To locate certified firms visit:
https://phoenix.diversitycompliance.com
Select:
City of
Phoenix
Directory
of
SBE
Certified
Firms
REMEMBERconfirm certification
status of a firm
Small Business Outreach and Compliance
SBE documents due to EOD at each GMP
Contractor’s Statement of Proposed SBE Utilization
Letter of Intent to Perform as an SBE Subcontractor/Supplier
SBE firms must be certified at the time of each GMP
SBE participation counted for certified firms performing a Commercially Useful Function (CUF) in their certified scope of work
Contractor is required to demonstrate good faith efforts to utilize small business throughout the contract
All subcontractors/suppliers must be reported within the B2G System
All small business participation will be tracked and reported by the Equal Opportunity Department
Post-Award SBE Requirements
Design - Statement of Qualifications Criteria
A. General information (5 points)
B. Design Experience of the Prime Firm (20 points)
C. Construction Administration and Inspection Experience
of the Prime Firm (15 points)
D. Experience of Key Personnel and Subconsultants (20
points)
E. Project Understanding and Approach (30 points)
F. Overall Evaluation of the Firm and Its Perceived Ability to
Provide the Required Services (10 Points)
CMAR - Statement of Qualifications Criteria
A. General information (15 points)
B. Experience and Qualifications of the Firm (20 points)
C. Experience of Key Personnel to be Assigned to this Project (25
points)
D. Understanding of the Project and Approach to Performing the
Required Services (30 points)
F. Overall Evaluation of the Firm and Its Perceived Ability to
Provide the Required Services (10 Points)
Statement of Qualifications Criteria SOQ Information Sheet/Cover Letter
Provide a cover letter which includes full firm company name,
address, phone number, vendor number, and the email address of
your contact person for the project. Do not include additional
information.
Evaluation Criteria - including project organizational chart
Additional Content – including resumes, photos, charts, or other
information
MAXIMUM Pages Permitted =
DESIGN-14 pages
CMAR-12 pages
+ Evaluation Criteria - including organizational chart, resumes, and/or other
information
+ Photos, charts / graphs or other evaluation content
Statement of Qualifications Criteria
What WILL be Counted Toward Maximum Number of Pages:• Each side of a page with criteria information.
• Pages that have photos, charts, and graphs.
What WILL NOT be Counted unless they contain information that may be considered by the selection panel):
• Cover letter,
• front and back covers,
• Table of Contents, and
• tab dividers
Statement of Qualifications Criteria
Submit 8 Copies of the SOQ that the firm is interested in
providing services for.
SOQ is Due:
12:00 Noon, local time
Friday, March 16, 2018
Phoenix City Hall
200 West Washington Street, 6th Floor
Submittal Box
Grounds for Disqualification
Receipt of SOQ after the specified cut-off date and time
Too few copies of the submittal
Deposit of SOQ in the wrong location
Violating the “Contact with City Employees” policy
SOQ Due Date
12:00 Noon, local time
Friday, March 16, 2018
Phoenix City Hall
200 W. Washington Street
6th Floor, Submittal Box
Selection Schedule
Design Services SOQ’s Due Fri, March 16, 2018
Firm Notified for Award Wed, April 18, 2018
Scope Meeting Wed, May 2, 2018
Construction Manager At Risk SOQ’s Due Fri, March 16, 2018
Firm Notified for Award Wed, April 18, 2018
Scope Meeting Wed, May 2, 2018
Information on Street Transportation Design
and Construction Procurement Webpage
https://www.phoenix.gov/streets/procurement/current-opportunities
Notification (if any)
Plan Holder List
Pre-submittal Power Point Presentation
Pre-submittal Sign-in sheet
Award
It is your responsibility as an RFQ holder to determine, prior to submittal, if an Addendum Letter has been issued
Questions After Today
E-mail Your Questions No Later Than Noon on Friday, March 9, 2018 to:
George Goodale, Contracts Specialist
602-534-8352
OPEN FOR QUESTIONS
&
THANK YOU FOR ATTENDING