Upcoming Projects
Strathcona County
CEA Partnering with Industry SymposiumJanuary 2019
Introduction
1/17/2019 2
Relevant departments:
• Transportation Planning and Engineering (TPE)- Planning studies- Design of roadway improvements,
upgrades, or new alignments• Transportation and Agriculture Services
- Maintenance/Rehab of roads, trails, sidewalks and bridges
• Utilities- Sanitary, Water
• Facility Services• Recreation, Parks, and Culture
Transportation Planning and Engineering DepartmentApproved 5-Year Capital Plan
Future Consultant Procurement• Annual Programs:
– Annual Missing Links Sidewalk Program• Provides new sidewalks in business and industrial areas.
• 2019:– Southwest Quadrant Functional Planning Study
• From Range Road 234 (City of Edmonton boundary) to Highway 21 and Township Road 510 to Highway 14
• 2020:– Range Road 231 Design, Land, and Utilities, Wye Road to Hillshire Boulevard
• 2022:– Broadmoor Boulevard and Baseline Road Functional Planning Study
1/17/2019 3
1/17/2019 4
2019 - Southwest Quadrant Functional Planning Study
5
2020 - Range Road 231 Design, Land and UtilitiesWye Road to Hillshire Boulevard
1/17/2019
2022 - Broadmoor Boulevard And Baseline Road Functional Planning Study
• Annual Programs:– Annual Traffic And Pedestrian Safety– Annual Traffic Signal/Intersection Replacements
• 2019:– Wye Road, Estate Drive To Clover Bar Road, Widening Construction– Township Road 522, 800m East Of Highway 21 To West Of Curve, Construction– 2019 Train Whistle Cessation
Transportation Planning and Engineering DepartmentApproved 5 Year Capital Plan - Other Projects
1/17/2019 7
8
2019 - Wye Road, Estate Drive To Clover Bar Road, Widening Construction
1/17/2019 9
2019 - Township Road 522, 800m East Of Highway 21 To West Of Curve, Construction
1/17/2019 10
2019: Train Whistle Cessation
• 2020:– Broadway Boulevard and Broadview Drive Roundabout– Sherwood Drive, Ash Street To Village Drive, Construction– Range Road 232, Aurum Access To Township Road 534, Construction
Transportation Planning and Engineering DepartmentApproved 5-Year Capital Plan - Other Projects
1/17/2019 11
12
2020 - Broadway Boulevard And Broadview Drive Roundabout Construction
13
2020 - Sherwood Drive, Ash Street To Village Drive, Construction
14
2020 - Range Road 232, Aurum Access To Township Road 534, Construction
Recreation, Parks and Culture Department Projects
• Project Management by TPE Department– Includes new trails, landscaping, and gathering spaces (parks, amenities)
• 2019 Consultant Procurement:– 2019 Pedestrian Trails Design
• Other Relevant Upcoming Projects– Ardrossan Youth Park Design– Summerton Spray Deck Design Build
1/17/2019 15
Utilities Department Projects
• 2019:– Collingwood Cove Lift Station Renewal
1/17/2019 16
Facilities Capital Projects• 2018:
– Kinsmen Leisure Centre Pool Family Change Rooms– Annual Facility Lifecycle Program
• 2019-2022:– Public Transit ‘Bus Barn’ Expansion– Annual Facility Lifecycle Program– Community Hub (FCS)– Strathcona County Public Services (SPSY) Expansion and Modernization– Multi-Purpose Agriculture Facility
1/17/2019 17
Future Outlook
• Future Capital Projects may be created due to:– Emerging Industrial Development
projects in Alberta’s Industrial Heartland
– Residential Development– Other emergent needs
1/17/2019 18
Heartland Area Map
Questions?
1/17/2019 19
Contact Info:Kevin ColeDirector, Transportation Planning and [email protected]: 780-400-3881
Top Related