UMLUMLACTIVITYACTIVITYDIAGRAMSDIAGRAMS
. , Dr Hoang Huu Hanh OST Hue University
hanh-at-hueuni.edu.vn
8/14/2019 UML ActivityDiagram
2/20
2
University
ObjectivesObjectives
To read and write UML activitydiagrams
To know when and how to use
activity diagrams
8/14/2019 UML ActivityDiagram
3/20
8/14/2019 UML ActivityDiagram
4/20
4
University
Processes and TheirProcesses and TheirDescriptionDescription
Process description notationsdescribe design processes as well ascomputational processes we design.
ss is a collection of related tasks that transforms a set of inputs intos is a collec
tion of related tasks that transforms a set of inputs into
activity diagram shows actions and the flow of control and data bectivity diag
ram shows actions and the flow of control and data bet
8/14/2019 UML ActivityDiagram
5/20
5
University
Activities and ActionsActivities and Actions
An activity is a non-atomic task or procedure decomposable into a
An action is a task or procedure that cannot be broken into parts.
n activity is
a non-atomic task or procedure decomposable into ac
n action is a task or procedure that cannot be broken into parts.
8/14/2019 UML ActivityDiagram
6/20
6
University
Activity Graph ElementsActivity Graph Elements
Sort
Clothes
Wash
Whites
Wash
Darks
Dry
Clothes
FoldClothes
Do Laundry
8/14/2019 UML ActivityDiagram
7/207
University
Execution ModelExecution Model
Execution is modeled by tokens that areproduced by action nodes, travel overaction edges, and are consumed byaction nodes.
When there is a token on everyincoming edge of an action node, itconsumes them and begins execution.
When an action node completesexecution, it produces tokens on eachof its outgoing edges.
An initial node produces a token on each
outgoing edge when an activitybegins.
8/14/2019 UML ActivityDiagram
8/208
University
Branching NodesBranching Nodes
Run Drier
Fold
Clothes
Dry Clothes
[else]
[still wet]
8/14/2019 UML ActivityDiagram
9/209
University
Branching ExecutionBranching Execution
If a token is made available onthe incoming edge of a decisionnode, the token is made
available on the outgoing edgewhose guard is true.
If a token is available on anyincoming edge of a merge node,it is made available on itsoutgoing edge.
Guards must be mutually
exclusive.
8/14/2019 UML ActivityDiagram
10/2010
University
DeadlockDeadlock
RunDriercannot
execute: whenthe activitybegins, there isa token on the
edge from theinitial node butnot on the
other incoming
Run Drier
Fold
Clothes
Try to DryClothes
[else]
[still wet]
8/14/2019 UML ActivityDiagram
11/2011
University
Forking and Joining NodesForking and Joining Nodes
SortClothes
WashWhites
WashDarks
DryClothes
Fold
Clothes
Do Laundry
8/14/2019 UML ActivityDiagram
12/2012
University
Forking and JoiningForking and JoiningExecutionExecutionA token available on the incoming
edge of a fork node isreproduced and made available
on all its outgoing edges.When tokens are available on
every incoming edge of a joinnode, a token is made availableon its outgoing edge.
Concurrency can be modeledwithout these nodes.
8/14/2019 UML ActivityDiagram
13/2013
University
Object NodesObject Nodes
Data and objects are shown asobject nodes.
Destroyer[captured]
Cruiser
Battlegroup
Battleship[damaged]
8/14/2019 UML ActivityDiagram
14/2014
University
Control and Data FlowsControl and Data Flows
Control tokens do not contain data,object tokens do.
A control flow is an activity edge thatis a conduit for control tokens.
A object flow is an activity edge thatis a conduit for object tokens.
Rules for token flow through nodes
apply to both control and objecttokens, except that object isextracted from consumed tokens andadded to produced tokens.
8/14/2019 UML ActivityDiagram
15/2015
University
Control and Data FlowControl and Data Flow
ExampleExample
Run Drier
Fold
Clothes
Wash and DryClothes
[else]
[still wet]
Clothes
[wet]
Clothes
Wash
Clothes
8/14/2019 UML ActivityDiagram
16/2016
University
Activity ParametersActivity Parameters
Activity parameters are objectnodes placed on activity symbolboundaries to indicate data or
object inputs or outputs.Activity parameters contain the
data or object name.
Activity parameter types arespecified in the activity symbolbeneath the activity name.
8/14/2019 UML ActivityDiagram
17/2017
University
Activity ParameterActivity ParameterExampleExample
max = a[i]
FindMaxa : int[1..*]
max : int
[else]
[i < a.length]
i++
[max < a.[i]]
[else]
max = a[0]i = 1
a
max
8/14/2019 UML ActivityDiagram
18/2018
University
Activity Diagram HeuristicsActivity Diagram Heuristics
Flowc
ontrol
andobje
ctsdo
wnth
e
pageand
leftto
right.
Nam
eactivities
anda
ctionswit
h
verbp
hrases.
Nameo
bjectn
odeswithn
oun
phrases.
Don
tusebot
hcont
roland
data
flowsw
henadat
aflow
alone
can
dothe
job.
esureth
atall
nodesent
ering
onnodec
anpro
vide
urrently.
datever
y
8/14/2019 UML ActivityDiagram
19/20
19
University
When to Use ActivityWhen to Use ActivityDiagramsDiagramsWhen making a dynamic model ofany process.
Design processes (what designers
do) Designed processes (what
designers create) During analysisDuring resolution
A
8/14/2019 UML ActivityDiagram
20/20
20
University
SummarySummary
Aprocessisacollectionofrelate
dtasks
thattran
sformsasetofinp
utstoaseto
outputs.
UM
Lactivitydiagram
smodelprocessesby
depictingactionsandtheflowofc
ontrol
anddatabetweenthem
.
Activitysymbolscontainact
ivitygraphs
cons
istingof
actionnodes
actionedges
datanodes
specialnodesforstartingan
dstop
activities,branching,fo
rking
Activitydiagram
scanrepr
processandareusef
softwaredesign.