Page 1: UCH POWER PROJECT

UCH POWER PROJECT

Page 2: UCH POWER PROJECT

Project beginnin

g

Costing $690 M

586 MW

Dera Murad Jamali

OGDC

low-Btu gas

Page 3: UCH POWER PROJECT

586 MW

Electric Service

Colonies,jobs

Scope Of The

Project

Page 4: UCH POWER PROJECT

Financers

Dutch and German banks

ABN Amro

Deutsche Bank

NDFC

World Bank

IFC

Bank of China

Page 5: UCH POWER PROJECT
Page 6: UCH POWER PROJECT

MARKET SUMMARY

Page 7: UCH POWER PROJECT

MARKET SUMMARY(80’S &90’s)

81-91 : 9% & 10.9%

7100 MV:Cpty

31,500 GWH

600 & 800 MV

Forecasted incr demand :

16,323MV

Page 8: UCH POWER PROJECT

NEED ANALYSIS

Resources indigenous to

Pakistan

Avoiding import of foreign fuel:$2

billion

Agriculture sector nominal consumer electricity(18.2%) :15.8% in 1987 to

1991

Page 9: UCH POWER PROJECT

NEED ANALYSISDemand growth:

9.4%

GDP growth of

6.4%: 1991-92

June 1991: 32% of villages

(electricity)

Higher propensity of

electricity consumption

Demographic and economic

changes

Page 10: UCH POWER PROJECT
Page 11: UCH POWER PROJECT

Imported 34% of energy requirements

Page 12: UCH POWER PROJECT
Page 13: UCH POWER PROJECT

PROJECT Partners

Page 14: UCH POWER PROJECT

PARTICIPANTS

California Energy Company Inc Hawkins Oil & Gas Inc. Hasan Group Kiewit Energy Company Tenaska Inc.

Page 15: UCH POWER PROJECT

LOCATION• Dera Murad Jamali, District

Nasirabad, Balochistan

Page 16: UCH POWER PROJECT
Page 17: UCH POWER PROJECT

ADVANTAGES OF SELECTED SITE

Close to

water

WAPDA’s transmission system

Major

road

system

Page 18: UCH POWER PROJECT

FUEL SUPPLYLow btu gas from UCH

gas field

US.$1.20

• OGDC is the lease operator of Uch gas field

• Per unit price charged by the UCH is

Page 19: UCH POWER PROJECT

FUEL SUPPLY

GAS FROM OGDC

STORED AT PLANT:FIEL

D GATE

GAS PIPELINE IS 66KM

LONG

Page 20: UCH POWER PROJECT
Page 21: UCH POWER PROJECT

FUEL FOR THE START UP & SHUTDOWN

1500,000 GALLONS

Fuel will be trucked to location

Page 22: UCH POWER PROJECT

INTERCONNECTION WITH NATIONAL GRID

Near the 220 KV national grid QUETTA LOAD CENTER LINKED OTHER LOAD

CENTER

Page 23: UCH POWER PROJECT

BENEFITS OF LOW BTU GAS

DISPLACES EQUIVALENT VOLUME OF OIL

FREE FOREIGN ECXHANGE

FAR LOWER IMPACT ON ENVIRONMENT

CONBUSTION RESULT IN LEAST EMISSION OF

POLLUTION

Page 24: UCH POWER PROJECT

MACHINES USED

Gas turbines

Generators

(steam & gas)

Steam turbines

Page 25: UCH POWER PROJECT
Page 26: UCH POWER PROJECT

GENERAL BENEFITS

High therm

al efficie

ncy

Low capital costs

Low environmental impacts

Indigenous fuel

Page 27: UCH POWER PROJECT

CRITICAL ANALYSIS

& CONCLUSI

ON