Trần Đăng Khoa-Power Market Department-EVN
Hanoi, October 2017
I. Power system overview
II. Current Status of Renewable Energy
III.Solar Energy
I. Power system overview
I. Generation portfolio ower system overview
Hydro
Coal
Gas Gas
1. Primary fuel
Vietnam Electricity
2016
Generation MixInstalledCapacity
Proportion (%)
Hydro 15986 38,3
Coal-fired 14447 34,6
Oil-fired 875 2,1
Gas (combined cycle) 7998 19,2
Wind 135 0,3
Biomass 54 0,1
Small hydro 2206,5 5,3
Total 41702 100Contents Unit Quantity
500 kV transmission line Km 7,444
200 kV transmission line Km 16,551
110 kV distribution line Km 20,215
Medium and low voltage line (2015) Km 476,572
500 kV substation MVA 26,100
220 kV substation MVA 44,602
110 kV substation MVA 50,813
Medium and low voltage substation (2015)
MVA 81,141
I. Power system overview
2. Power system 2016
6
Source: NLDC annual report, 2015
and Revised Master Plan VII.
107587 119033 128849144655
164312184300
201866221145
242264265400
400327
571752
1649018603 20010
2221025828
2881031188
34462 38081
42080
63471
90651
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
100000
0
100000
200000
300000
400000
500000
600000
700000
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2025 2030
A Pmax
Average growth rate (%) 2011-2015 2016-2020 2021-2025 2026-2030
Peak Load 11.9 10.5 8.6 7.4
4. Load is forecasted for duration 2016-2030
I. Power system overview
7
40%
33%
22%2% 0% 3%
2015
38537 MW 30%
45%
16%
7% 0% 2%
2020
59779 MW
21%
51%
19%
8% 0% 1%
2025
89074MW 18%
51%
16%
10% 4% 1%
2030
117436 MW
5. Generation Share
I. Power system overview
8
6. Government’s strategic development plan
➢ Some major strategic targets (cont.):▪ To increase electricity generated from renewable energy:
2
11
90
35%
38%
32%
29%
30%
31%
32%
33%
34%
35%
36%
37%
38%
39%
0
10
20
30
40
50
60
70
80
90
100
2015 2020 2030
%
Bil
lion
kW
h
Year
Increasement in electricity generated from RE
Electricity generated from RE (excluding hydro)
Electricity generated from RE percentage (including hydro)
I. Power system overview
9
7. Government’s strategic development plan (cont.)
➢ Some major strategic targets (cont.):▪ Oriented development for different types of RE from 2015 to 2050:
56
0.6 0.18 0.01
90
7.8 2.5 1.4
96
37
16
35.4
85
53
210
0
50
100
150
200
250
Hydro Biomass Wind Solar
Bil
lion
kW
h
Oriented development for different types of RE
2015 2020 2030 2050
I. Power system overview
II. Current Status of Renewable Energy
II. Current Status of RE
11
1. Wind power
➢ Legal Rule: Decision 37/2011/QĐ-TTg
dated 29/6/2011 issued by Prime Minister
and Circular 32/2014/BCT issued by
MOIT.
▪ Electricity Tariff: 7,8 UScents/kWh
and planned to increase.
▪ PPA: Based on sample PPA.
➢ So far, there have been 9 projects signed
PPA with EVN with total installed
capacity of 403.9 MW and around
200MW in commercial operation.
II. Current Status of RE
12
2. Biomass
➢ Legal Rule: Decision 24/2014/QĐ-TTg
dated 24/3/2014 issued by Prime
Minister.
▪ Electricity Tariff:
o Electricity-thermal co-
generation: 5,8 UScents/kWh.
o The others: Based on avoided
cost mechanism.
▪ PPA: Based on sample PPA.
➢ According to statistics, there are 7
projects with total installed capacity of
around 200 MW, almost in commercial
operation.
II. Current Status of RE
13
3. Solid waste
➢Legal Rule: Decision 31/2014/QĐ-TTg
dated 05/05/2014 issued by Prime
Minister.
▪ Electricity Tariff:
o Generated by burning solid waste
directly:10,05 UScents/kWh.
o Generated by gas from solid waste
landfill: 7,28 UScents/kWh.
▪ PPA: Based on sample PPA.
▪ Only two project signed PPA and one
in commercial operation.
II. Current Status of RE
14
4. Small hydro
➢Legal Rule: Decision 18/2008/QĐ-
BCT dated 18/7/2008 and replaced by
Circular 32/2014/TT-BCT dated
9/10/2014 issued by MOIT.
▪ Electricity Tariff: Avoided cost
issued by ERAV, 2016 tariff is
around 5 Uscent/kWh.
▪ PPA: Based on sample PPA.
▪ Most successful mechanism:
around 250 projects and 3000MW
in commercial operation.
II. Current Status of RE
15
5. Solar
➢Legal Rule: Decision 11/2017/QĐ-TTg
dated 11/04/2017 issued by Prime Minister.
▪ Electricity Tariff:
o 9,35 UScents/kWh for both solar
farm and surplused root top.
o Affective until Jun 2019.
▪ PPA: Based on sample PPA based on
Circular 16/2017/TT-BCT dated
12/9/2017.
III. Solar Energy
1. Solar Radiation Study and Solar Potential in Vietnam regarding to information from MOIT
III. Solar energy
Vietnam Electricity
2. Solar Radiation Data in Vietnam
Areas Sunshine HoursSolar Radiation
Intensity(kWh/m2/day)
Remark
North East 1600 – 1750 3,3 – 4,1 Fair
North West 1750 – 1800 4,1 – 4,9 Fair
Middle North 1700 – 2000 4,6 – 5,2 Good
Central Highlands and South Central Region
2000 – 2600 4,9 – 5,7 Very good
South 2200 – 2500 4,3 – 4,9 Very good
Country on average 1700 – 2500 4,6 Good
Average total solar radiation is around 5 kWh/m2/day in the Central and the South, and 4
kWh/m2/day the North
Vietnam Electricity
III. Solar energy
3. Total capacity from renewable energy comes into operation:
Vietnam Electricity
Period Capacity (MW)
2016 – 2020 3,603
2021 – 2025 6,290
2026 – 2030 15,190
Total (2016-2030) 25,083
Solar capacity
Year Capacity (MW)
2020 850
2025 4,000
2030 12,000
III. Solar energy
4. Solar energy integration:
Vietnam Electricity
(i) Solar master plan: Solar development have to comply with the revised
master plant 7th, comply with the target of the government related to
solar development plan.
(ii) Grid code and Distribution code should be reviewed and revised as the
case may be, in order to reflect of solar integration.
(iii) System study should be implemented in order to optimize the auxiliary
services with the more and more penetration ratio of solar and other
intermitted energy.
III. Solar energy
21
Thank You!