Transportation Infrastructure
WGF 2017
Stuart Woods
VP Geospatial Division
Leica Geosystems AG.
2
Growing Population
THE WORLD'S POPULATION IS GROWING
TODAY 7.4BN - 10BN IN 40 YEARS
3
Mapping the Unknown
• From 1861, Victorian engineers built miles of purpose-built subways large enough to walk through, for running gas, electricity, water, and hydraulic
pipes.
• Removing the inconvenience of continually excavating highways to allow access to underground utilities.
• Most are still in use today – some have infrastructures surveys have not been updated since they were created.
Railway The Mumbai Suburban Railway is an offshoot of
the first railway to be built by the British in India,
and is also the oldest railway system in Asia. The
first train ran a distance of 34 km, on 16 April
1853
Gas & Electricity in 1861, Victorian engineers built several miles
of purpose-built subways large enough to walk
through, for running gas, electricity
Fresh water & Sewers London, like most other major cities, has
extensive underground infrastructure for
fresh water supply and sewers.
4
Mapping the Inaccessible
• Italy during August and October 2016, multiple earthquakes
impacted central Italy
• Historically only airborne data could be used for disaster
• Key to rebuilding and insurance is having a ground based capture
5
New Technology Enabling Mapping in New Ways
Infrastructure NEW OLD
Survey or nothing (once-in-lifetime) X
Complete as-built capture X
Progressive Capture (during
construction) X
Monitoring X X
Surveying Faster (higher ROI) X X
Dam waterway normally filled with water
Speed
Accessibility
6
Productivity Driving Reality Capture Products for Infrastructure
BP
Accuracy
Pro
du
cti
vit
y (
km
/h)
few
m
any
a lot
<2cm 3cm >5cm
Vehicle Speeds up to 120km/h
Outdoors only
Speed determines max pt per Sq mtr
Walking pace –
indoors or outdoors
Walking pace
Underground
or outdoor
Above and Below Ground
Mass Digitisation
15km/h Acquisition Speed
7
• Fast to deploy – no preparation
• Vehicle independent
• Boat, train, trolley, car
• Significantly flexibility in applications
• Battery operated
Infrastructures Need Flexiblity - Leica Pegasus:Two
8
Breadth of Digital Infrastructure Surveying Pegasus:Two
• Expressways, Highways, Roads corridor mapping.
• Railways , Fast Trains, Tram ways corridor mapping.
• Canals and distributaries system, having service roads.
• 3D City modeling, City surveys & Topographic Surveys.
• Surveys for Airport runways and adjacent areas.
• Surveys for Telecommunication – along road network.
• Water and Gas pipe lines survey along the existing
roads.
9
How Do Our Customers Generate Value From P2
0%
10%
20%
30%
40%
50%
Civ
il Surv
ey
GIS
Asset M
ana
gem
en
t
3D
Po
int C
loud
GIS
Ap
plic
atio
n
Ro
ad S
urv
ey
Orth
o T
IFF
DT
M
Civ
il Eng
ineerin
g
Airp
ort S
urv
ey
City
Mod
ellin
g
Ro
ad G
IS A
sset
Ma
nag
em
ent
3D
Po
int C
loud
Ra
il Su
rvey
Co
nte
nt
10
>
>
>
Government investment Important government investment:
400 Millon $USD .
200 KM 200 Km of simple road in northern Colombia
Acuracy Accuracy measurement of heights very important for design the new road surface
www.grupoacre.com
Customer Feedback – Acre, Pegasus Survey Tool
11
Why the Pegasus solution?
We obtain complete point cloud and pictures
Geometry and attributes at the same time
www.grupoacre.com
12
Mobile LiDAR and Multi-beam Sonar - Tittabawasse River, USA
1. High Level of Detail
2. Superior Deliverable
3. Collection Time vs. Traditional Methods
4. Impact to property owner
13
Customer Example: Infrastructure Mapping of Hydroelectric Dam in Italy Pegasus:Backpack
14
Customer Example: Infrastructure Mapping of Sewers Pegasus:Backpack
15
Customer Example: Infrastructure Mapping of Sewers Pegasus:Backpack
19
Urban Planning and Monitoring – Infrastructure?
Credit: Genesys International
20
• Dimly lit corridors even during Mid-Day (Problem
solved by using Flash mounted on the backpack)
• Extremely narrow lanes and by lanes
• Haphazard lane and by lane layouts
• Hutments present below ground level
• Closely spaced hutments with overlapping roofs
causes problems in acquiring GPS fixes
• Varying Terrain Undulations
• Turbulence from slum dwellers and political unions
Urban Planning
and Monitoring
Credit: Genesys International
21
Urban Planning and Monitoring - Deliverables
Hut Wall Extraction Top View
Hut Wall Extraction Side View
Credit: Genesys International
22
Rail Infrastructure – Maintenance of Rail Bridge SiTrack:Two
Weserbridge
northern Germany
built 1873
23
Detection of the beams
because of bridge sleeper
renewal
Rail Infrastructure – Maintenance of Rail Bridge SiTrack:Two
24
Rail Infrastructure – Maintenance of Rail Bridge SiTrack:Two
dimension
classical measurement
(levelling, tachymetric)
measurement with
mobile laser scanning
Field work 100 beams/sleepers a day (8h) 4000 beams/sleepers a day (8h)
Manpower 2 engineers 2 engineers
3 safety persons 3 safety persons
Field work: time 20 days* 0,5 days
Field work hours 800 20
Office work 500 beams/sleepers a day (8h) 250 beams/sleepers a day (8h)
Manpower 1 engineer 2 engineers
Office work: time 4 days 8 days
Office work: hours 32 128
Total work hours 832 h 148 h
*probably necessary overnight costs not included
25
Rail Infrastructure – Maintenance of Rail Bridge SiTrack:Two
26
Below and Above Ground Asset Management
27
1 unit in China
18 units in USA
5 units in Japan
1 unit in
Portugal
2 units in Russia
18
2 1 1 14
1
8
2 1 1 1 2 15
1 1 13 4
2
U.S
.A
Me
xico
Be
lgiu
m
Po
rtu
ga
l
Gre
ece
Ita
ly
S. A
fric
a
Fra
nc
e
Ho
lla
nd
S. K
ore
a
Switzerl…
Hu
ng
ary
Ru
ssia
Uk
rain
e
Jap
an
Ch
ina
Bra
zil
Uru
gu
ay
UK
Ind
ia
Du
ba
i
Pegasus Systems units sold
Demo unit Brazil
Demo unit NAFTA
3 Demo units Europe
Demo unit APAC
1 unit in Brazil
3 unit in UK
Demo unit China
2 units in Dubai
Shared Demo unit
ME
4 units in India
• Updated for Q3 2016.
• Demos available in all regions.
• 8 Pegasus:Backpack system – France, Holland, Norway, India
1 unit in
Uruguary
1 unit in Ukraine
4 unit in Italy
1 unit in Hungary
8 units in France
1 unit in Greece 1 unit in
Switzerland
2 units in Mexico
1 unit in Spain
1 unit in S.
Africa
1 unit in S.
Korea
1 unit in Belgium
2 unit in Holland
Customer’s Choice – Pegasus Platform - 61 Units Globally – Fastest Growing Community in 3 yrs
Top Related