TRANSMISSION LINETRANSMISSION LINE
LINE ROUTE SELECTIONLINE ROUTE SELECTION
TOWER SPOTTING CONCEPTSTOWER SPOTTING CONCEPTS
KITTI PETCHSANTHADKITTI PETCHSANTHAD
EGAT, THAILANDEGAT, THAILAND
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
2/71
Execution shall be made in 3 stagesExecution shall be made in 3 stages
1. Line Route Survey1. Line Route Survey
2. Transmission Line Design2. Transmission Line Design
3. Construction of Transmission Line3. Construction of Transmission Line
HOW TO OBTAIN A TRANSMISSION LINE ?HOW TO OBTAIN A TRANSMISSION LINE ?
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
3/71
1. Reconnaissance Survey1. Reconnaissance Survey
2. Survey for Design2. Survey for Design3. Survey for Construction3. Survey for Construction
STAGES OF LINE ROUTE SURVEYSTAGES OF LINE ROUTE SURVEY
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
4/71
PRINCIPLES FOR TRANSMISSION LINE ROUTE SELECTIONPRINCIPLES FOR TRANSMISSION LINE ROUTE SELECTION
Selecting for transmission line route, in principle, shouldSelecting for transmission line route, in principle, should bebe
straight with the shortest distance for engineering andstraight with the shortest distance for engineering and economiceconomic
benefits and it must be considered to the other effectbenefits and it must be considered to the other effects such as :s such as :
forests, environment and the land uses that the transmissforests, environment and the land uses that the transmission line ision line is
passing through.passing through.
Generally, selecting (and /or locating) of the transmissionGenerally, selecting (and /or locating) of the transmission lineline
route shall have the various principles considered, namelroute shall have the various principles considered, namelyy
1.1. PRINCIPLES FOR TRANSMISSION ENGINEERINGPRINCIPLES FOR TRANSMISSION ENGINEERING
2.2. PRINCIPLES REGARDING THE TYPES OF FORESTPRINCIPLES REGARDING THE TYPES OF FOREST
3.3. OTHEROTHER PRINCIPLESPRINCIPLES
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
5/71
PRACTICES FOR TRANSMISSION LINE ROUTE SELECTIONPRACTICES FOR TRANSMISSION LINE ROUTE SELECTION
1.1. Should use the topographic map scale 1 : 50,000 of RoyalShould use the topographic map scale 1 : 50,000 of Royal ThaiThai
Survey Department as base map with the upSurvey Department as base map with the up toto date anddate and
appropriate scale of the aerial photograph or the satellappropriate scale of the aerial photograph or the satellite imageryite imagery
to determine the preliminary possible transmission line rto determine the preliminary possible transmission line routes byoutes by
the consideration of the appropriation on the principlesthe consideration of the appropriation on the principles of theof the
types of forests and the other principles as well.types of forests and the other principles as well.
2. Perform the reconnaissance survey to find out the add2. Perform the reconnaissance survey to find out the additionalitional
information of land around the selected transmissioninformation of land around the selected transmission line routeline route
area.area.
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
6/71
PRACTICES FOR TRANSMISSION LINE ROUTE SELECTIONPRACTICES FOR TRANSMISSION LINE ROUTE SELECTION
(CONTINUED)(CONTINUED)
3. Coordinate with the other government agency concerned in the areas.4. Plot the most appropriate transmission line route from the
informationas added in items 2 and 3 on the map scale 1 : 50,000 or
the aerial photograph, with the representatives from System Planning
Division, Transmission System Engineering Division, Environmental
Division, Transmission System Survey and Land Division and
Transmission System Construction Division for further survey in
details of Plan & Profile in the site.
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
7/71
NoteNote ::
TheseThese principlesprinciples havehave beenbeen determineddetermined byby thethe sixsix (6)(6)
representativesrepresentatives fromfrom thethe relevantrelevant divisionsdivisions consistingconsisting ofof ::
Transmission System SurveyTransmission System Survey andand LandLand DivisionDivision,,
TransmissionTransmission SystemSystem ConstructionConstruction DivisionDivision,, SystemSystem
PlanningPlanning DivisionDivision,, EnvironmentEnvironment DivisionDivision,, TransmissionTransmission
SystemSystem EngineeringEngineering DivisionDivision;; andand havehave beenbeen approvedapproved byby
thethe CommitteeCommittee forfor ConsideringConsidering thethe TransmissionTransmission LineLine
RouteRoute inin thethe meetingmeeting NoNo.3/2541.3/2541 onon 1717 SeptemberSeptember BB..EE.2541.2541
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
8/71
PRELIMINARY DESIGNPRELIMINARY DESIGN
ELECTRICAL DESIGNELECTRICAL DESIGN
STRUCTURAL DESIGNSTRUCTURAL DESIGN
TOWER SPOTTING DESIGNTOWER SPOTTING DESIGN
TRANSMISSION LINE DESIGNTRANSMISSION LINE DESIGN
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
9/71
Tower Spotting is mean to SelectSelect TowerTowerTypeTypess,,
TowerTower HeightHeightss andandTowerTower LocationLocationss of Transmission Lineof Transmission Line
onon PlanPlan && ProfileProfile Drawing so thatDrawing so that ::
TOWER SPOTTING DESIGNTOWER SPOTTING DESIGN
ByBy ManualManual ((TrialTrial && ErrorError))
ByBy DynamicDynamic ProgrammingProgramming ((ProgramProgram TLCADDTLCADD))
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
10/71
TOWER SPOTTING DESIGNTOWER SPOTTING DESIGN
SelectSelect TowerTowerTypeTypess,,TowerTower HeightHeightss andandTowerTower LocationLocationss
onon PlanPlan && ProfileProfile Drawing so thatDrawing so that ::
1.1. Structures are not OStructures are not Overloadedverloaded2.2. All GeometricalAll Geometrical CClearanceslearances are metare met
3.3. Design is EconomicalDesign is Economical
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
11/71
1. STRUCTURE ARE NOT OVERLOADED1. STRUCTURE ARE NOT OVERLOADED
For Range of Line Angle :For Range of Line Angle :
Wind SpanWind Span AllowableAllowableBare Cold Weight SpanBare Cold Weight Span Allowable (Down)Allowable (Down)Bare Cold Weight SpanBare Cold Weight Span Allowable (Uplift)Allowable (Uplift)Ice Weight SpanIce Weight Span AllowableAllowable
Method 1 : Basic Allowable SpanMethod 1 : Basic Allowable Span
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
12/71
For Range of Line Angle :For Range of Line Angle :
AatualAatual Wind and Weight Spans give aWind and Weight Spans give a
point inside Allowable Interaction Diagrampoint inside Allowable Interaction Diagram
Method 2 : Interaction Diagrams BetweenMethod 2 : Interaction Diagrams Between
Allowable Wind and Weight SpansAllowable Wind and Weight Spans
Method 3 : By Structural AnalysisMethod 3 : By Structural Analysis
1. STRUCTURE ARE NOT OVERLOADED1. STRUCTURE ARE NOT OVERLOADED
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
13/71
2. ALL GEOMETRICAL CLEARANCES ARE MET2. ALL GEOMETRICAL CLEARANCES ARE MET
Vertical ClearanceVertical Clearance -- Hot After Creep, etc.Hot After Creep, etc.
Lateral ClearanceLateral Clearance -- Some Wind After CreepSome Wind After Creep
Insulator SwingsInsulator Swings -- Everyday, Occasional (Cold),Everyday, Occasional (Cold),
Rare (High Wind)Rare (High Wind)
Between PhasesBetween Phases -- Some Wind, Galloping,Some Wind, Galloping,Uneven Ice, etc.Uneven Ice, etc.
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
14/71
3. DESIGN IS ECONOMICAL3. DESIGN IS ECONOMICAL
Method 1 : Trial and Error using Manual orMethod 1 : Trial and Error using Manual or
Computerized Interactive SpottingComputerized Interactive Spotting
Method 2 : Automatic Minimum Cost SpottingMethod 2 : Automatic Minimum Cost Spotting
Using Dynamic ProgrammingUsing Dynamic Programming
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
15/71
TENSIONTENSION LIMITSLIMITS
TensionTension limits for conductors arelimits for conductors are
specified to provide adequate factor of safetyspecified to provide adequate factor of safetyagainst failureagainst failure.. These limits are normallyThese limits are normally
specified as a percentage of the rated breakingspecified as a percentage of the rated breaking
strength of the conductorstrength of the conductor..
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
16/71
TENSIONTENSION LIMITSLIMITS
Initial Tension at 6Initial Tension at 6 ooCC
With WindWith Wind
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
17/71
CONTROL CONDITIONCONTROL CONDITION
CONTROL TENSION FOR CONDUCTOR :
22% OF ULTIMATE TENSILE STRENGTH
AT 27
O
C (NO WIND)CONTROL SAG FOR OVERHEAD GROUND
WIRE : 75% OF SAG MATCH TOCONDUCTOR SAG AT 27 OC (NO WIND)
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
18/71
DATA REQUIREMENT FORDATA REQUIREMENT FORTTOWEROWER SSPOTTINGPOTTING DESIGNDESIGN
1.1. TowerTowerTypeType,, TowerTowerHeightHeight andand TowerTowerWeightWeight
2.2. CostCost ofoftowerstowers andand foundationsfoundations
3.3. TowerTowerapplicationapplication andand insulatorinsulatorswingswing datadata
4.4. ConductorConductorsagsag andand tensiontension datadata
5.5. HorizontalHorizontal andand verticalvertical conductorconductorclearancesclearances requirementsrequirements
6.6. TowerTowerlocationlocation restrictionsrestrictions
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
19/71
DEFINITIONDEFINITION
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
20/71
RULINGRULING SPANSPANTheThe ruling span is the span length in which the sag and tensionruling span is the span length in which the sag and tension
in the conductor under changes in temperature and external loadiin the conductor under changes in temperature and external loading willng will
most nearly agree with the average sags and tensions in a seriesmost nearly agree with the average sags and tensions in a series of spansof spansof varying length located between deadof varying length located between dead--end supportsend supports.. The ruling span isThe ruling span is
used to determine the design sags and tensionsused to determine the design sags and tensions,, construct the sagconstruct the sag
templatetemplate,,
and prepare the stringing sag tablesand prepare the stringing sag tables..
The ruling span may beThe ruling span may becalculated using the following equationcalculated using the following equation..
nL...3L2L1L
3nL...
33
L32
L31
L
SpanRuling +++
+++
portssupenddeadbetweenlengthsspan...3
L,2
L,1
L =+
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
21/71
SPANSPAN CALCULATIONSCALCULATIONS
InIn the design of a transmission line therethe design of a transmission line there
are several different types of spans whichare several different types of spans whichrequire definitionrequire definition.. They are wind spanThey are wind span,, weightweight
spanspan andand rulingruling spanspan..
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
22/71
WINDWIND SPANSPAN
TheThe wind span is used to calculate thewind span is used to calculate the
transverse load on a structuretransverse load on a structure.. The wind span shallThe wind span shall
be the average of the actual horizontal lengths of thebe the average of the actual horizontal lengths of thetwo spans adjacent to the structuretwo spans adjacent to the structure concernedconcerned..ThisThis
isis illustratedillustratedononFigureFigure11
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
23/71
WEIGHTWEIGHT SPANSPAN
TheThe weight span is used to described theweight span is used to described the
portion of the conductor that is supported by aportion of the conductor that is supported by astructurestructure.. If the supports for the conductor are on theIf the supports for the conductor are on the
same elevationsame elevation,, then the weight span and the windthen the weight span and the windspan will be identicalspan will be identical.. HoweverHowever,, if one support isif one support is
lower than the otherlower than the other,, then the low point of thethen the low point of the
conductor will be closer to the lower supportconductor will be closer to the lower support.. EachEachstructure will then support that portion of thestructure will then support that portion of theconductor between the structure and the low spansconductor between the structure and the low spans..
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
24/71
Figure 1
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
25/71
Definition of Wind Span & Weight Span
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
26/71
H = HORIZONTAL COMPONENT OF TENSION
C = CATENARY CONSTANT = H / W
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
27/71
UPLIFT
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
28/71
NO UPLIFT
MAY RESULT IN EXCESSIVE INSULATOR SWING
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
29/71
FigureFigure 22
TheThe cold curve falls above the point ofcold curve falls above the point ofsupport of the conductor indicating upliftsupport of the conductor indicating uplift..
The cold curveThe cold curves vertical span is negatives vertical span is negative..
WhenWhen deadendingdeadending for this applicationfor this application,, checkcheck
for excessive conductor tension at minimumfor excessive conductor tension at minimum
temperaturetemperature..
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
30/71
Figure 2
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
31/71
FigureFigure33
TheThe cold curve falls below the point ofcold curve falls below the point ofsupport of the conductor indicating that nosupport of the conductor indicating that no
uplift would occuruplift would occur..
The cold curveThe cold curves verticals verticalspan is small in relation to the averagespan is small in relation to the averagehorizontal spanhorizontal span.. This may result in excessiveThis may result in excessive
insulator swinginsulator swing..
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
32/71
Figure 3MAY RESULT IN EXCESSIVE INSULATOR SWING
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
33/71
SIDE SWING CONTROL
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
34/71
STRUCTURE LOADING CONTROL
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
35/71
LineLineSectionSection ororTensionTension SectionSection is spanis span
length betweenlength between TensionTensionTower toTower toTensionTension
TowerTower which havewhich haveSuspensionSuspensionTower in theTower in the
middle sectionmiddle section
LINE SECTIONLINE SECTION OR TENSION SECTIONOR TENSION SECTION
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
36/71
HHOT CURVEOT CURVE
MaximumMaximum conductor temperatureconductor temperature,, nono,, final sag curvefinal sag curve.. Used to check clearancesUsed to check clearances
,, and structure height on theand structure height on the.. The maximum conductorThe maximum conductor
waswas 7575CC..
windwind ,,
insulator swinginsulator swingplotted profileplotted profile
temperaturetemperature
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
37/71
CCOLD CURVEOLD CURVE
MinimumMinimum temperaturetemperature,, no windno wind,, initialinitialsag curvesag curve.. Used to check for uplift andUsed to check for uplift and
insulatorinsulator swingswing 66CC was used as thewas used as theminimum conductorminimum conductor temperaturetemperature.. UpliftUplift
conditionsconditions shouldshould bebe avoidedavoided,, forfor EGATEGATss
500500kVkV lineslineswas used insulator swing 4was used insulator swing 4CC..
Conditions considered in the design of
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
38/71
Conditions considered in the design ofTransmission line cables
a ) Cable behavior after long term Creep( Will happen )
Conditions considered in the design of
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
39/71
Conditions considered in the design ofTransmission line cables
b ) Cable behavior after being subjected to Heavy load( Assumption )
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
40/71
DATA INFORMATION REQUIREMENTDATA INFORMATION REQUIREMENT
1.1. Plan & Profile DrawingPlan & Profile Drawing
2.2. Sag Template, Ruling Span and LoadingSag Template, Ruling Span and LoadingCriteriaCriteria
3.3. Structure Application ChartsStructure Application Charts4.4. Vertical Clearances CriteriaVertical Clearances Criteria
5.5. Crossing Clearances CriteriaCrossing Clearances Criteria6.6. Horizontal Clearances CriteriaHorizontal Clearances Criteria
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
41/71
TowerTowerSpottingSpotting
ManualManual (( TrialTrial && ErrorError)) MethodMethod
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
42/71
115kV LINETO KAMPHAENPHET
115kV LINE
TO LANKRABU
Ruling Span 330 m.
Distance from P.I. STA.34+192.60 to P.I. STA.37+420.576 = 3227.916 m
Number of Span = Distance between P.I. to P.I. / Rul ing Span
= 3227.916 / 330
= 9.78 Span
Say 10 Span
Distance between Tower = 3227.916 / 10
= 322.79 m
TOWERSPOTTINGBYMANUALDESIGNTOWERSPOTTINGBYMANUALDESIGN
Ban Huai Sai
Ban Rai Kho Si
Ban Rai Kho Si
P.I. STA.41+593.63706-42 -05 LT.
P.I. STA.39+502.78741-14 -06 LT.
P.I. STA.37+420.516
34-18 -16 RT.
P.I. STA.34+192.6012-08 -50 RT.
HUAIERA
HU
AIE
-R
A
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
43/71
TowerTowerSpottingSpotting
ByBy DynamicDynamic ProgrammingProgramming (( ProgramProgram TLCADDTLCADD ))
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
44/71
Structure Characteristic
Structure CostTLCADDTLCADD
SoftwareSoftware
Profile (Terrain)
Catenary Constants
Prohibitive Zone
Design
Report
Sheet
Drawing
OUTPUTOUTPUT
Tower Spotting by TLCADD SoftwareTower Spotting by TLCADD Software
TABLE ITABLE IRecommended Minimum Vertical Clearances of Conductor
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
45/71
Minimum Vertical Clearance (m)Minimum Vertical Clearance (m)CaseCase
No.No.Nature of ClearanceNature of Clearance
69 kV69 kV 115 kV115 kV 230 kV230 kV 500 kV500 kV
1.1. RailroadsRailroads 9.509.50 10.5010.50 11.5011.50 16.0016.00
2.2. StateState//MajorMajorHighwaysHighways 7.007.00 9.009.00 10.0010.00 14.5014.50
3.3. CultivatedCultivated AreasAreas,, GroundGround
accessibleaccessible byby VehiclesVehicles6.306.30 7.007.00 8.408.40 13.0013.00
4.4. GroundGround accessibleaccessible toto pedestrianspedestrians
onlyonly,, UncultivatedUncultivated landland6.306.30 7.007.00 8.408.40 11.0011.00
5.5. CrossingCrossing NavigableNavigable RiverRiver((aboveabove
maximummaximum waterwaterSurfaceSurface))18.0018.00 18.0018.00 18.0018.00 18.0018.00
ForForCASECASE NONO.. 22 ((
ClearanceClearance UtiltyUtilty))8.508.50 16.0016.00 18.0018.00 18.0018.00
Recommended Minimum Vertical Clearances of Conductor
(Based on Final Conductor Sag at Maximum Operating Temperature)
TABLE IITABLE IICrossing Clearances
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
46/71
Minimum Vertical Clearance (m)Minimum Vertical Clearance (m)CaseCase
No.No.Nature of ClearanceNature of Clearance
69 kV69 kV 115 kV115 kV 230 kV230 kV 500 kV500 kV
1.1. CommunicationCommunication LinesDistributionLinesDistribution
LinesLines2.502.50 4.504.50 5.205.20 5.255.25
2.2. 3333 kVkV andand LessLess 1.501.50 2.002.00 3.503.50 4.654.65
5.5. PowerPowerLinesLines 230230 kVkV 3.703.70 4.304.30 5.805.80 6.006.00
66 ShiedShied WiresWires ofofotherotherLinesLines 1.501.50 2.002.00 3.503.50 4.004.00
3.3. PowerPowerLinesLines 6969 kVkV 1.701.70 2.302.30 3.703.70 4.654.65
4.4. PowerPowerLinesLines 115115 kVkV 2.302.30 2.902.90 4.304.30 5.255.25
77 GasGas pipepipe LinesLines 6.306.30 7.007.00 8.408.40 13.0013.00
g
TABLE II ITABLE IIIRecommended Clearances to other features
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
47/71
MinimumMinimumHorizontalHorizontal ClearanceClearance ((mm))CaseCase
NoNo..NatureNatureofofClearanceClearance
6969 kVkV 115115 kVkV 230230 kVkV 500500 kVkV
1.1. RailroadsRailroads ** 15.0015.00 ** 15.0015.00 ** 20.0020.00 65.0065.00
2.2. StateState//MajorMajorHighwaysHighways ** 15.0015.00 ** 15.0015.00 ** 20.0020.00 75.0075.00
3.3. CountryCountry roadsroads ** 15.0015.00 ** 15.0015.00 ** 20.0020.00 55.0055.00
4.4. FarmFarm laneslanes,, DirtDirt RoadsRoads,, CartCart tracktrack 15.0015.00 15.0015.00 20.0020.00 25.0025.00
5.5. CanalCanal 15.0015.00 15.0015.00 20.0020.00 20.0020.00
6.6. BuildingsBuildings 12.0012.00 12.0012.00 20.0020.00 35.0035.00
7.7. PowerPowerLineLine 230230 kVkV ** 15.0015.00 ** 15.0015.00 ** 20.0020.00 50.0050.00
8.8. PowerPowerLineLine 115115 kVkV ** 15.0015.00 ** 15.0015.00 ** 20.0020.00 40.0040.00
9.9. PowerPowerLineLine 6969 kVkV ** 15.0015.00 ** 15.0015.00 ** 20.0020.00 40.0040.00
10.10. DistributionDistribution LinesLines 3333 kVkV andand lessless 15.0015.00 15.0015.00 20.0020.00 40.0040.00
11.11. GasGas pipepipe lineslines 15.0015.00 15.0015.00 20.0020.00 43.0043.00
(Based on minimum distance to tower center line)
115115 kVkV TRANSMISSIONTRANSMISSION LINELINE
DOUBLEDOUBLE CIRCUITCIRCUIT TOWERTOWER
FF 11 795795 MCMMCM ACSRACSR
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
48/71
FForor 11 xx 795795 MCMMCM ACSRACSR
( Ruling Span 330 M, R.O.W. = 12.0 m. each )
Structural Application, Height and Leg Extension )
TYPETYPEDEVIATIONDEVIATION
ANGLEANGLE
WINDWIND
SPANSPAN((mm))
WEIGHTWEIGHT
SPANSPAN ((mm))
4.04.0 mm..
BODYBODY ExtExt..LEGLEG ExtExt..
SPOTTINGSPOTTING
HTHT.. ((mm))
DADA11 00 11oo
340340 495495 YY 11 14.514.5
LDALDA11 00 11oo
650650 13001300 YY 22 15.515.5
DBDB22 00 1515oo
330330 495495 YY 33 16.516.5
DCDC22 00 3030oo
330330 495495 YY 44 17.517.5
DDDD22 00 6060oo 330330 495495 YY 55 OROR 11 ++ BEBE 18.518.5
DEDE22 00 9090oo
330330 495495 YY 66 OROR 22 ++ BEBE 19.519.5
DTDT22 00 11oo
340340 495495 NN 77 OROR 33 ++ BEBE 20.520.5
00oo
++CompleteComplete
165165 250250 44 ++ BEBE 21.521.5
4545oo SlackSlack 215215 325325 55++ BEBE 22.522.5
00oo
++
CompleteComplete
165165 250250 66 ++ BEBE 23.523.5
9090oo SlackSlack 215215 325325 77 ++ BEBE 24.524.5
YYDDEDDE(90)(90)
YYDDEDDE
Structure Weight ( Complete Tower, in kg .)Structure Weight ( Complete Tower, in kg .)
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
49/71
LEGLEG EXTENSIONEXTENSION
++ 44 ++ 55 ++ 66 ++ 77
4+4+BEBE 5+5+BEBE 6+6+BEBE 7+7+BEBE
3,6153,615 3,7553,755 3,8953,895 4,1154,115
4,7404,740 4,8804,880 5,0205,020 5,2405,240
4,9504,950 5,1505,150 5,3505,350 5,5705,570
6,2906,290 6,4906,490 6,6906,690 6,9106,910
5,2505,250 5,3905,390 5,6905,690 5,9705,970
6,6306,630 6,7706,770 7,0707,070 7,3507,350
6,1806,180 6,3806,380 6,6206,620 7,0207,020
7,9157,915 8,1158,115 8,3558,355 8,7558,755
8,3308,330 8,6508,650 8,9308,930 9,3509,350
10,52510,525 10,84510,845 11,12511,125 11,54511,545
6,0006,000 6,1406,140 6,4406,440 6,7206,720
-- -- -- --
8,5408,540 8,8608,860 9,1409,140 9,5609,560
10,73510,735 11,05511,055 11,33511,335 11,75511,755
10,41010,410 10,73010,730 11,13011,130 11,63011,630
12,71012,710 13,03013,030 13,43013,430 13,93013,930DDEDDE(90)(90) 2,3002,300 9,5109,510 9,8109,810 10,11010,110
DDEDDE 2,1952,195 7,7407,740 7,9607,960 8,2408,240
DTDT22 1,3801,380 5,4805,480 5,6205,620 5,7605,760
DEDE22
DDDD22 2,1952,195 7,5307,530 7,7507,750 8,0308,030
DCDC22 1,7351,735 5,5805,580 5,7405,740 5,9205,920
DBDB22 1,3801,380 4,7304,730 4,8704,870 5,0105,010
LDALDA11 1,3401,340 4,4704,470 4,6104,610 4,7504,750
DADA11 1,1251,125 3,2153,215 3,3153,315 3,4553,455
++ 11 ++ 22 ++ 33
TYPETYPE BEBE :: (4.0(4.0 mm))
115 kV Transmission Line (1 x 795 MCM ACSR)115 kV Transmission Line (1 x 795 MCM ACSR)
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
50/71
Ruling Span = 330 m., R.O.W = 12 m.
(Pascal)
(Pascal)
(Pascal)
(16 kg/m2)
(88 kg/m2)
(52.5 kg/m2)
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
51/71
Conductor PropertiesConductor Properties
mm2
mm
N/mGPa
LoadingLoading CriteriaCriteria
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
52/71
LoadingLoading CriteriaCriteria
LoadingLoading CriteriaCriteria (Continued)
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
53/71
LoadingLoading CriteriaCriteria (Continued)
LoadingLoading CriteriaCriteria (Continued)
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
54/71
LoadingLoading CriteriaCriteria (Continued)
Loading conditions andLoading conditions and CatenaryCatenary constant Tableconstant Table
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
55/71
Structure CharacteristicsStructure Characteristics
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
56/71
Structure CharacteristicsStructure Characteristics
Structure CharacteristicsStructure Characteristics (Continued)
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
57/71
Structure CharacteristicsSt uctu e C a acte st cs (Co t ued)
Structure CharacteristicsStructure Characteristics (Continued)
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
58/71
Terrain
Structure Characteristics ( )
Structure CharacteristicsStructure Characteristics (Continued)
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
59/71
Structure CharacteristicsStructure Characteristics (Continued)
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
60/71
StructureStructure CostCost
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
61/71
StructureSt uctu e CostCost
StructureStructure CostCost (Continued)
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
62/71
Structure Cost ( )
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
63/71
FROM DESIGN REPORT
1. Located Towers on Plan & Profile Dwg.
2. Structure List & Summary List
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
64/71
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
65/71
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
66/71
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
67/71
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
68/71
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
69/71
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
70/71
7/28/2019 TRANSMISSION LINE LINE ROUTE SELECTIONLINE ROUTE SELECTIONTOWER SPOTTING CONCEPTSTOWER SPOTTING .pdf
71/71
Questions?