Download - Thermo-siphon cooling workshop §3

Transcript
Page 1: Thermo-siphon cooling  workshop §3

Thermo-siphon cooling workshop §3Thermo-siphon cooling workshop §3

ALEX BITADZECERN- European Organization for Nuclear ResearchATLAS Experiment

E-mail: [email protected] 

Home institute:Department of Physics and Astronomy University of Glasgow

System integration System integration in PX15in PX15

28 May 2010 Geneva, CERN28 May 2010 Geneva, CERN

Page 2: Thermo-siphon cooling  workshop §3

Dimensions and other Parameters of System PartsDimensions and other Parameters of System Parts

Name Hight Length Width

Tank 1.5m 1.5m 1m

Small Chiller 1.35m 0.85m 0.76m

Control Cabinet 2m 1m 0.5m

Test Evaporator (big) 1.5m 6m 1.5m

Small Evaporator 1.2m 0.5m 0.5m

Outer Diameter Tottal LengthInlet Liquid Pipe (Blue) 58.7mm (DN25+25mm of Thermal isolation) 100.134m

Outlet Vapor Pipe (Rad) 60.3mm (DN50) 100.817m

Page 3: Thermo-siphon cooling  workshop §3

Building 3184Building 3184

Page 4: Thermo-siphon cooling  workshop §3

Building 3184Building 3184

Page 5: Thermo-siphon cooling  workshop §3

Building 3178Building 3178

Page 6: Thermo-siphon cooling  workshop §3

Building 3178Building 3178

CDD: ATLICSC_0062CDD: ATLICSC_0062

Page 7: Thermo-siphon cooling  workshop §3

~70M~70M

Page 8: Thermo-siphon cooling  workshop §3

USA15 Level A3USA15 Level A3

Page 9: Thermo-siphon cooling  workshop §3

USA15 Level A3USA15 Level A3

Dummy Load / Evaporator Dummy Load / Evaporator

Page 10: Thermo-siphon cooling  workshop §3

USA15 Level A3USA15 Level A3

Page 11: Thermo-siphon cooling  workshop §3

DrawingsDrawings

ATLICSC_0059ATLICSC_0060ATLICSC_0061ATLICSC_0062ATLICSC_0063ATLICSC_0064ATLICSC_0065ATLICSC_0066ATLICSC_0067ATLICSC_0069ATLICSC_0070ATLICSC_0071ATLICSC_0072