The Pavilion Pre-Submittal Conference April 1, 2010
Slide 2
M. D. Anderson Team Leaders Jim Waters, Project Director, Shell
and Core Janet Sisolak, Project Director, Interior Build-out Pam
Redden, Project Director, Clinical Operations Dan Butterwick, Chief
Architect Greg Hudgins, Project Manager Rich Fitzgerald, Design
Facilitator Eve Avivi, Interior Planner Mary Mueller, Sourcing
& Contract Management
Slide 3
Project Organization
Slide 4
Project Objectives Enhance the front door of M.D. Anderson
Cancer Center Add horizontal expansion space to levels 3, 5 and 7
to support Diagnostic Imaging and Perioperative Enterprise,
respectively. Provide expansion space for sterile processing and
Perioperative clean supply (basement)
Slide 5
Project Objectives (continued) Free up space on the Alkek floor
plate to provide more operating rooms and diagnostic imaging suites
Ensure new operating rooms are programmed to optimum size based on
procedures to be performed and equipment needed
Slide 6
Project Goals Minimize closure of the front door; stage project
to facilitate early opening of drive and new lobby Maintain
continuous connectivity between the Alkek Hospital and Lutheran
Pavilion on all floors Provide future planning flexibility Long
term strategy for Lutheran Pavilion replacement Programmatic
changes Future bridge to TMC Garage 2
Slide 7
Site Overview
Slide 8
Slide 9
Slide 10
Design Criteria Package
Slide 11
Basement Level Expansion Block Plan
Slide 12
Level 1 & 2 Expansion Block Plan
Slide 13
Level 3 Diagnostic Imaging Expansion Block Plan Level 3
Diagnostic Imaging Expansion Block Plan
Construction Impacts Site Logistics/Staging Construction Access
Construction Supply - Bates and Bertner Crane Placement &
Removal Vibration/Noise Infection Control - dust Safety-dropped
loads
Slide 21
Design Impacts Optimizing the site and creating the right front
door image Confirm both the interior and exterior aesthetic design
objectives Confirm impact to both budget and schedule to optimizing
the site MEP Issues Confirm whether capacity in main building will
support the addition. Structural Issues Rotunda bridges can stand
alone, to allow Rotunda to be removed Design to support future
bridge to TMC Garage 2
Slide 22
Operational Concerns Keeping the Rotunda drive closed for
extended duration Further closure of Rotunda to pedestrian traffic
Visitors - Garage 2 Traffic flow (pedestrian & vehicular) along
Bates and Bertner Valet Operations currently operating out of Clark
Clinic Patient Discharges Currently using Emergency Center PT/OT
Continued closure of gardens used for gait training and pet therapy
Flooding Exposure