Terminal Concept Design 2019.10
Steamship Authority Woods Hole Ferry Terminal Reconstruction October 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
Terminal Concept Design Option History
VERSION DESCRIPTION
2017.1 Flat Roof with 40’ Open PergolaJune
2017.2 Shed Roof with 40’ Plaza CoverJune
2017.3 Saltbox - 40’ Plaza Cover (60’ Cover Alternate)June
2017.4 Saltbox - 40’ Open PergolaJune
2017.5 Saltbox - 40’ Sloped CanopyJune
5 bertaux + iwerks architects
1 2 3 4 5 6 7 8SALTBOX (x3) SALTBOX (x2) GLAZED SALTBOX (x3) GLAZED SALTBOX (x2) SALTBOX (x1) + FLAT (x2) FLAT (x3) BUTTERFLY (x1) BUTTERFLY (x2)
BIA RATING
PLAZA PASSENGER COVERAGE 275 125 275 125 275 275 85 225
PLAZA + PIER PASSENGER COVERAGE 550 400 550 400 550 550 360 500
GOES WITH SALTBOX FORM YES YES YES YES SOMEWHAT NO NO NO
GLASS TYPE SKYLIGHT SKYLIGHT SLOPED GLASS SLOPED GLASS FLAT GLASS FLAT GLASS SLOPED GLASS SLOPED GLASS
GLASS MAINTENANCE MINIMAL MINIMAL DIFFICULT ACCESS DIFFICULT ACCESS MODERATE MODERATE MODERATE MODERATE
DRAINAGE EDGE GUTTERS EDGE GUTTERS EDGE GUTTERS EDGE GUTTERS INTERNAL ROOF DRAINS INTERNAL ROOF DRAINS INTERNAL ROOF DRAINS INTERNAL ROOF DRAINS
VIEW FROM WAITING ROOM TOWARDS VILLAGE CLEAR CLEAR CLEAR CLEAR OBSTRUCTED, NOT
INTEGRATEDOBSTRUCTED, NOT
INTEGRATEDOBSTRUCTED, NOT
INTEGRATEDOBSTRUCTED, NOT
INTEGRATED
COVERAGE AT BUILDING ENTRY YES YES YES YES YES YES NO NO
Design Options
5 bertaux + iwerks architects
1 2 3 4 5 6 7 8SALTBOX (x3) SALTBOX (x2) GLAZED SALTBOX (x3) GLAZED SALTBOX (x2) SALTBOX (x1) + FLAT (x2) FLAT (x3) BUTTERFLY (x1) BUTTERFLY (x2)
BIA RATING
PLAZA PASSENGER COVERAGE 275 125 275 125 275 275 85 225
PLAZA + PIER PASSENGER COVERAGE 550 400 550 400 550 550 360 500
GOES WITH SALTBOX FORM YES YES YES YES SOMEWHAT NO NO NO
GLASS TYPE SKYLIGHT SKYLIGHT SLOPED GLASS SLOPED GLASS FLAT GLASS FLAT GLASS SLOPED GLASS SLOPED GLASS
GLASS MAINTENANCE MINIMAL MINIMAL DIFFICULT ACCESS DIFFICULT ACCESS MODERATE MODERATE MODERATE MODERATE
DRAINAGE EDGE GUTTERS EDGE GUTTERS EDGE GUTTERS EDGE GUTTERS INTERNAL ROOF DRAINS INTERNAL ROOF DRAINS INTERNAL ROOF DRAINS INTERNAL ROOF DRAINS
VIEW FROM WAITING ROOM TOWARDS VILLAGE CLEAR CLEAR CLEAR CLEAR OBSTRUCTED, NOT
INTEGRATEDOBSTRUCTED, NOT
INTEGRATEDOBSTRUCTED, NOT
INTEGRATEDOBSTRUCTED, NOT
INTEGRATED
COVERAGE AT BUILDING ENTRY YES YES YES YES YES YES NO NO
Design Options
5 bertaux + iwerks architects
1 2 3 4 5 6 7 8SALTBOX (x3) SALTBOX (x2) GLAZED SALTBOX (x3) GLAZED SALTBOX (x2) SALTBOX (x1) + FLAT (x2) FLAT (x3) BUTTERFLY (x1) BUTTERFLY (x2)
BIA RATING
PLAZA PASSENGER COVERAGE 275 125 275 125 275 275 85 225
PLAZA + PIER PASSENGER COVERAGE 550 400 550 400 550 550 360 500
GOES WITH SALTBOX FORM YES YES YES YES SOMEWHAT NO NO NO
GLASS TYPE SKYLIGHT SKYLIGHT SLOPED GLASS SLOPED GLASS FLAT GLASS FLAT GLASS SLOPED GLASS SLOPED GLASS
GLASS MAINTENANCE MINIMAL MINIMAL DIFFICULT ACCESS DIFFICULT ACCESS MODERATE MODERATE MODERATE MODERATE
DRAINAGE EDGE GUTTERS EDGE GUTTERS EDGE GUTTERS EDGE GUTTERS INTERNAL ROOF DRAINS INTERNAL ROOF DRAINS INTERNAL ROOF DRAINS INTERNAL ROOF DRAINS
VIEW FROM WAITING ROOM TOWARDS VILLAGE CLEAR CLEAR CLEAR CLEAR OBSTRUCTED, NOT
INTEGRATEDOBSTRUCTED, NOT
INTEGRATEDOBSTRUCTED, NOT
INTEGRATEDOBSTRUCTED, NOT
INTEGRATED
COVERAGE AT BUILDING ENTRY YES YES YES YES YES YES NO NO
Design Options
5 bertaux + iwerks architects
1 2 3 4 5 6 7 8SALTBOX (x3) SALTBOX (x2) GLAZED SALTBOX (x3) GLAZED SALTBOX (x2) SALTBOX (x1) + FLAT (x2) FLAT (x3) BUTTERFLY (x1) BUTTERFLY (x2)
BIA RATING
PLAZA PASSENGER COVERAGE 275 125 275 125 275 275 85 225
PLAZA + PIER PASSENGER COVERAGE 550 400 550 400 550 550 360 500
GOES WITH SALTBOX FORM YES YES YES YES SOMEWHAT NO NO NO
GLASS TYPE SKYLIGHT SKYLIGHT SLOPED GLASS SLOPED GLASS FLAT GLASS FLAT GLASS SLOPED GLASS SLOPED GLASS
GLASS MAINTENANCE MINIMAL MINIMAL DIFFICULT ACCESS DIFFICULT ACCESS MODERATE MODERATE MODERATE MODERATE
DRAINAGE EDGE GUTTERS EDGE GUTTERS EDGE GUTTERS EDGE GUTTERS INTERNAL ROOF DRAINS INTERNAL ROOF DRAINS INTERNAL ROOF DRAINS INTERNAL ROOF DRAINS
VIEW FROM WAITING ROOM TOWARDS VILLAGE CLEAR CLEAR CLEAR CLEAR OBSTRUCTED, NOT
INTEGRATEDOBSTRUCTED, NOT
INTEGRATEDOBSTRUCTED, NOT
INTEGRATEDOBSTRUCTED, NOT
INTEGRATED
COVERAGE AT BUILDING ENTRY YES YES YES YES YES YES NO NO
Design Options
VERSION DESCRIPTION
2017.6 Saltbox with Roof Extension over Plaza 2 & 3 Bay VersionsDecember - April 2018
2017.7 Saltbox with Glass Roof over Plaza2 & 3 Bay Versions December - April 2018
2017.8 Saltbox with Flat Pergola over Plaza2 & 3 Bay Versions December - April 2018
2017.9 Saltbox with Canopies over Plaza2 & 3 Bay VersionsDecember - April 2018
2017 2017 - 2018
Steamship Authority Woods Hole Ferry Terminal Reconstruction Terminal Design Options July 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
Terminal Concept Design Option History
VERSION DESCRIPTION
2018.1 Saltbox with Flat Glass Pergola on 3 SidesUmbrellas Added to PlazaAugust -October
2018.2 2 Story Flattened Saltbox,Ridge 5’ Lower, Both 123’ and 113’ L VersionsNovember - December
2018.4 2 Story Gable with Shed, 123’ LDecember
2018.3 3 Story Tower, Reduced to 113’ LDecember
2018
Steamship Authority Woods Hole Ferry Terminal Reconstruction Terminal Design Options July 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
VERSION DESCRIPTION
2019.1 Reduced Height Saltbox, 113 LRevised ProgramFebruary
2019.2 2 Story Flattened Saltbox, Reduced to 113’ LJanuary - March
2019.3 2 Story Flattened Gable, 1 Story Waiting Room,Reduced to 113’ LJanuary - March
2019.4 2 & 3 Story Crossing Gable, Reduced to 113’ LJanuary - March
2019.5 2 Story Flattened Gable - Shifted NorthwardJune
VERSION DESCRIPTION
2019.6 2 Story Flattened Gable - Shifted Northward & MirroredJune
2019.7 2 Story Pitched Roof, 1 Story over Waiting Room, Reduced to 113’ LJuly - August
2019.8 2 Story Pitched Roof, 1 Story over Waiting Room - Mirrored PlanReduced to 113’ LJuly - August
2019.9 1 Story Flat Roof with Solar Panels, 133’ L 2 Story Utility Building with Staff OccupancyJuly - August
2019.10 1 Story Flat Roof with Solar Panels, 123’ L 2 Story Utility Building with Staff OccupancyJuly - August
Terminal Concept Design Option History
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/28/2019
BIA .studio
Three-Story Crossing Gable Roof
Gable Roof
Reduced Saltbox Roof
Previous Option
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/28/2019
BIA .studio
Three-Story Crossing Gable Roof
Gable Roof
Reduced Saltbox Roof
Previous Option
Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/28/2019
BIA .studio
Three-Story Crossing Gable Roof
Gable Roof
Reduced Saltbox Roof
Previous Option
ATM
LUGGAGE PICK-UP
EL 10' - 6"
EL 8' - 6"
EL 10' - 6"
JAN
N
0
bertaux + iwerks architects118 South Street, Boston, Massachusetts 02110t: 617.423.6500 w: www.bi-arch.com
Childs Engineering CorporationMarine Engineering34 William Way, Bellingham, MA 02019
DG Jones InternationalCost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801
Carol R Johnson AssociatesLandscape Architecture
GZA GeoEnvironmentalGeotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909
115 Broad St, Boston, MA 02110
Kalin AssociatesSpecifications1121 Washington Street #2West Newton, MA 02465
Thornton TomasettiStructural Engineering27 Wormwood Street Suite 200Boston, MA 02210
WSPMEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210
Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543
Drawn By:
Checked By:
Date:
Scale:
Design Phase:
Seal:
4'-0" 8'-0" 16'-0"
Sheet No.Phase
5
1/8" = 1'-0"
Woods Hole FerryTerminal Reconstruction
A101
Author
Checker
07/21/17
First Floor Plan -Presentation
Community Redesign
Issue / Revision Schedule
No. Revision Date
2019
Steamship Authority Woods Hole Ferry Terminal Reconstruction Terminal Design Options July 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
Steamship Authority Woods Hole Ferry Terminal Reconstruction October 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
Option 2019.10 One Story Terminal
BULKHEAD
PAVED PARKING
CONCRETE ABU
BRIDGE ABOVE
ABUTMENT WALL
CONCRETE
COWDR
27'
12.85'
14.58' CANOPY
CANOPY
TRANSFER BRIDGE 1
1
S
N
2
3
FLOATING
PLATFORM 1
14.54'
TRANSFER BRIDGE 3
8.0'
TRUCK STAGING AREA
ENTRY BOOTH 1
ENTRY BOOTH 2
FENCE
ACTI
VE P
ICK-
UP
AN
D D
ROP-
OFF
BUS
BUS
BUS
Sola
r Can
opy
Sola
r Can
opy
Sola
r Can
opy
8.13'
8.85'
13.92'
9.92'
10.5'
10.0'
10.5'
10.5'10.5'
10.5'
10.5'
AUTO STAGING AREA
ENTRY
7.0'
STAGING BOOTH
CRAN
E ST
COWDRY RD
JUN
IPER
PO
INT
RD
EMPLOYEEPARKING
BIKE PATH
BIKE PARK
RAILROAD AVE
LUSC
OM
BE A
VE
WATER ST
9.22'
7.41'
FLOATING
PLATFORM 2
FIXED PLATFORM 2
FIXED PLATFORM 1SOUTH PIER
NORTH PIER
EXIT
5.85'
TRANSFER BRIDGE 2
����
�����
LUGGAGEPICK UP
LUGGAGEDROP OFF
LUGGAGEDROP OFF
Steamship Authority Woods Hole Ferry Terminal Reconstruction August 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
Option 2019.10 One Story Terminal with Bus Berth Solar Canopies
Steamship Authority Woods Hole Ferry Terminal Reconstruction August 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
Option 2019.10 One Story Terminal with Bus Berth Solar Canopies
Steamship Authority Woods Hole Ferry Terminal Reconstruction August 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
Option 2019.10 One Story Terminal with Bus Berth Solar Canopies
Solar Energy EstimateAugust 2019
Temporary TerminalGross Area 3,600 sfAverage Annual Energy Usage 139,629 sfAverage Annual Energy Usage per Square Foot 39 kWh/sf
Future TerminalGross Area 6,888 sfAverage Annual Energy Usage 267,158 kWh/sfAverage Annual Energy Usage per Square Foot * 39 sf
Annual Solar Energy ProductionBus Berth Solar Canopies 115,000 Rooftop Solar Panels 24,000
139,000 kWh
52%
* Assume equal to the temporary terminal
% of Terminal Energy Demand Produced On Site
Steamship Authority Woods Hole Ferry Terminal Reconstruction October 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
Option 2019.10 One Story Terminal
Steamship Authority Woods Hole Ferry Terminal Reconstruction Terminal Design Options July 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
Option 2019.10 One Story Terminal
Steamship Authority Woods Hole Ferry Terminal Reconstruction Terminal Design Options July 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
EL 13' - 0"
EL 8' - 6"
EL 10' - 6"
VM VM VM
EL 10' - 6"
ATM
EL 17' - 0"
Childs Engineering Corporation
Marine Engineering34 William Way, Bellingham, MA 02019
DG Jones International
Cost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801
Carol R Johnson Associates
Landscape Architecture
GZA GeoEnvironmental
Geotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909
21 Custom House Street, Boston, MA 02110
Kalin Associates
Specifications1121 Washington Street #2West Newton, MA 02465
Thornton Tomasetti
Structural Engineering27 Wormwood Street Suite 200Boston, MA 02210
WSP
MEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210
Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543
Drawn By:
Checked By:
Date:
Scale:
Phase:
Seal:
Sheet No.Phase
As Indicated
BIA.118 South Street, Boston, MA 02111T: (617) 423-6500 W: bia.studio
studio
OPTION B
Woods Hole FerryTerminal Reconstruction
A111
GD
LD
TERMINAL BUILDINGFLOOR PLAN
Schematic Design
07/ 23/ 19
1/8" = 1'-0"TERMINAL FLOOR PLAN 1
Issue / Revision Schedule
No. Revision Date
123’- 0”
56’- 0”
1
74
2
85
3
11
10
9
12
13
14 166
Option 2019.10 One Story Terminal
First Floor Plan WAITING ROOM 40’-0” x 50’-0”
1.
4.
7.
2.
5.
8.
3.
6.
9.
10.
11.
12.TICKETING 12’-0” x 20’-0”
CASH ROOM 15’-0” x 8’-0”
PUBLIC WOMEN’S RESTROOM 12 W.C. / 10 LAV 24’-6” x 25’-0”
PUBLIC MEN’S RESTROOM 3 W.C. / 4 UR / 4 LAV 13’-0” x 16’-6”
ELECTRICAL ROOM 8’-6” x 12’-0”
EMPLOYEE RESTROOM - MEN 8’-0” x 10’-0”
BREAK ROOM 12’-0” x 12’-0”
JANITOR 5’-0” X 8’-0”
13.
15.EMPLOYEE RESTROOM - WOMEN 8’-0” x 10’-0”
VENDING 15’-0” x 8’-0”
TELECOM / DATA 9’-0” x 17’-6”
UNISEX RESTROOM 1 W.C. / 1 LAV 8’-6” x 8’-6”
14.
TERMINAL AGENTS OFFICE 13’-0” X 17’-6”
TERMINAL MANAGER’S OFFICE 9’-0” X 17’-6”
15
MECHANICAL 20’-0” x 23’-0”
16.
Steamship Authority Woods Hole Ferry Terminal Reconstruction Terminal Design Options July 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
GRADE - EL. 10’-0”
FIRST FLOOR - EL. 13’-0”
MECHANICAL - EL. 17’-0”
18’-6”
GRADE - EL. 10’-0”
FIRST FLOOR - EL. 13’-0”
MECHANICAL - EL. 17’-0”
North Elevation
East Elevation
Option 2019.10 One Story Terminal
Solar ArrayPergola
Steamship Authority Woods Hole Ferry Terminal Reconstruction Terminal Design Options July 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
18’-6”
GRADE - EL. 10’-0”
FIRST FLOOR - EL. 13’-0”
MECHANICAL - EL. 17’-0”
GRADE - EL. 10’-0”
FIRST FLOOR - EL. 13’-0”
MECHANICAL - EL. 17’-0”
South Elevation
West Elevation
Option 2019.10 One Story Terminal
Solar ArrayPergola
Childs Engineering Corporation
Marine Engineering34 William Way, Bellingham, MA 02019
DG Jones International
Cost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801
Carol R Johnson Associates
Landscape Architecture
GZA GeoEnvironmental
Geotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909
21 Custom House Street, Boston, MA 02110
Kalin Associates
Specifications1121 Washington Street #2West Newton, MA 02465
Thornton Tomasetti
Structural Engineering27 Wormwood Street Suite 200Boston, MA 02210
WSP
MEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210
Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543
Drawn By:
Checked By:
Date:
Scale:
Phase:
Seal:
Sheet No.Phase
As Indicated
BIA.118 South Street, Boston, MA 02111T: (617) 423-6500 W: bia.studio
studio
OPTION B
Woods Hole FerryTerminal Reconstruction
A301
GD
LD
TERMINAL BUILDINGSECTION
Schematic Design
07/ 23/ 19
1/8" = 1'-0"BUILDING SECTION 3
Issue / Revision Schedule
No. Revision Date
Steamship Authority Woods Hole Ferry Terminal Reconstruction Terminal Design Options July 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
GRADE - EL. 10’-0”
FIRST FLOOR - EL. 13’-0”
MECHANICAL - EL. 17’-0”
18’-6”
Option 2019.10 One Story Terminal
Section
DN
UP
GEN
ELEC.
16' - 0"
15' - 0" COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
11' - 0"
Childs Engineering Corporation
Marine Engineering34 William Way, Bellingham, MA 02019
DG Jones International
Cost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801
Carol R Johnson Associates
Landscape Architecture
GZA GeoEnvironmental
Geotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909
21 Custom House Street, Boston, MA 02110
Kalin Associates
Specifications1121 Washington Street #2West Newton, MA 02465
Thornton Tomasetti
Structural Engineering27 Wormwood Street Suite 200Boston, MA 02210
WSP
MEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210
Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543
Drawn By:
Checked By:
Date:
Scale:
Phase:
Seal:
Sheet No.Phase
As Indicated
BIA.118 South Street, Boston, MA 02111T: (617) 423-6500 W: bia.studio
studio
OPTION B
Woods Hole FerryTerminal Reconstruction
A011
GD
LD
STAFF BUILDING -FIRST FLOOR PLAN
Schematic Design
07/ 23/ 19
1/8" = 1'-0"1 FIRST FLOOR PLAN
Issue / Revision Schedule
No. Revision Date
1 4
2
6
3
11
1012
13
First Floor Plan ENTRY 10’-0” x 10’-0”
1.
4.
7.
2.
5.
8.
3.
6.
9.
10.
11.
12.ELEVATOR
STAIR
CONSUMABLE STORAGE 33’-6” x 13’-6”
MISCELLANEOUS STORAGE 9’-0” x 33’-6”
TRASH & RECYCLING YARD
LOST & FOUND 14’-6” x 16’-6”
WORK AREA 15’-6” x 10’-0”
STAIR
13.
15.RUNNER PICK UP / DROP OFF 14’-6” X 10’-6”
JANITOR 8’-6” x 5’-0”
WASTE OIL STORAGE 28’-0” x 16’-0”
EQUIPMENT STORAGE 31’-0” x 33’-6”
14.
VINEYARD SPACE 14’-6” X 10’-6”
CENTERPLATE STORAGE 14’-6” X 17’-6”
14
15
5
7
8
9
Option 2019.10 Utility Building
(Uncovered / Exterior)
Steamship Authority Woods Hole Ferry Terminal Reconstruction Terminal Design Options July 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
DN
DN
15' - 0"
16' - 0"
Childs Engineering Corporation
Marine Engineering34 William Way, Bellingham, MA 02019
DG Jones International
Cost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801
Carol R Johnson Associates
Landscape Architecture
GZA GeoEnvironmental
Geotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909
21 Custom House Street, Boston, MA 02110
Kalin Associates
Specifications1121 Washington Street #2West Newton, MA 02465
Thornton Tomasetti
Structural Engineering27 Wormwood Street Suite 200Boston, MA 02210
WSP
MEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210
Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543
Drawn By:
Checked By:
Date:
Scale:
Phase:
Seal:
Sheet No.Phase
As Indicated
BIA.118 South Street, Boston, MA 02111T: (617) 423-6500 W: bia.studio
studio
OPTION B
Woods Hole FerryTerminal Reconstruction
A012
GD
LD
STAFF BUILDING -SECOND FLOORPLAN
Schematic Design
07/ 23/ 19
1/8" = 1'-0"1 SECOND FLOOR PLAN
Issue / Revision Schedule
No. Revision Date
Second Floor Plan ELEVATOR LOBBY 10’-0” x 10’-0”
16.
19.
22.
17.
20.
23.
18.
21.
24.
25.
26.
27.ELEVATOR MACHINE ROOM 10’-0” x 6’-0”
ELEVATOR
MULTI-PURPOSE ROOM 25’-6” x 14’-6”
TELECOM / DATA 15’-0” x 8’-6”
EMPLOYEE RESTROOM - MEN 8’-0” x 10’-0”
EMPLOYEE LOCKER ROOM 20’-0” x 21’-0”
EMPLOYEE BREAK ROOM 11’-0” X 8’-0”
28.
EMPLOYEE RESTROOM - WOMEN 8’-0” x 10’-0”
JANITOR 8’-6” x 4’-6”
TERMINAL STORAGE 15’-0” x 32’-0”
LINEN 19’-6” x 15’-0”
29.
MECHANICAL 20’-0” X 18’-6”
ELECTRICAL ROOM 11’-0” X 8’-0”
Option 2019.10 Utility Building
16
17
18 19
20
21 22
23
24
25
26
27
28
29
Steamship Authority Woods Hole Ferry Terminal Reconstruction Terminal Design Options July 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
Option 2019.10 Utility Building
Steamship Authority Woods Hole Ferry Terminal Reconstruction Terminal Design Options July 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
FIRST FLOOR - EL. 11’-0”
SECOND FLOOR - EL. 23’-0”
North Elevation
West ElevationEast Elevation
FIRST FLOOR - EL. 11’-0”
SECOND FLOOR - EL. 23’-0”
Steamship Authority Woods Hole Ferry Terminal Reconstruction Terminal Design Options July 2019
BIA .studio Copyright © 2019 BIA Studio | All Rights Reserved
Terminal ProgramJuly 2019
Public Service Areas Public Service AreasLobby/Passenger Waiting Area 1,900 Lobby/Passenger Waiting Area 2,067 Vestibules/Entryways 344 Vestibules/Entryways 559 Food Concession/Vending 140 Food Concession/Vending 127 Public Restrooms 982 Public Restrooms 940
Ticket Selling / Customer Service Areas Ticket Selling / Customer Service AreasTicket/Cust. Serv. Counter Area 225 Ticket/Cust. Serv. Counter Area 258 Cash Handling Area 120 Cash Handling Area 120
Line Employee Areas Line Employee Areas Line Employee Areas Line Employee AreasEmployee Restrooms 160 Employee Restrooms 130 Employee Restrooms - Employee Restrooms 184 Employee Locker Room 415 Employee Locker Room - Employee Locker Room - Employee Locker Room 415 Employee Break Room 412 Employee Break Room 177 Employee Break Room - Employee Break Room 336 Dockworkers Restroom - Dockworkers Restroom - Dockworkers Break Room - Dockworkers Break Room -
Supervisory Employee Areas Supervisory Employee AreasTerminal Manager Office 120 Terminal Manager Office 150 Terminal Agents Office 258 Terminal Agents Office 258
Other Purpose Areas Other Purpose Areas Other Purpose Areas Other Purpose AreasMulti-Purpose Room 380 Multi-Purpose Room - Multi-Purpose Room - Multi-Purpose Room 380
Storage Areas Storage Areas Storage Areas Storage AreasJanitor's Room 39 Janitor's Room 35 Janitor's Room - Janitor's Room 82 Storage Room 156 Storage Room - Terminal Storage Room - Terminal Storage Room 486Storage Room 72 Storage Room - Trash & Recycling 1,000 Trash & Recycling 1,000
Waste Oil Storage 450 Waste Oil Storage 450 Lower Level Equp. Storage 1,100 Lower Level Equp. Storage 1,090 Lower Level Consumable Storage 460 Lower Level Consumable Storage 460 Lower Level Work Area 170 Lower Level Work Area 160 Vineyard Space 150 Vineyard Space 150 Runner Drop-Off / Pick Up Area 136 Runner Drop-Off / Pick Up Area 150 Lost and Found Area 275 Lost and Found Area 300 Miscellaneous Space 296 Miscellaneous Space 296 Linen Area 296 Linen Area 296 Centerplate Storage 255 Centerplate Storage 255
Mechanical/Equipment Areas Mechanical/Equipment Areas Mechanical/Equipment Areas Mechanical/Equipment AreasElectrical Room 104 Electrical Room 100 Electrical Room 90 Electrical Room 90Mechanical Room 630 Mechanical Room 550 Mechanical Room - Mechanical Room 432 Data/Telecom Center 178 Data/Telecom Center 160 Data/Telecom Center - Data/Telecom Center 130 Elevator Machine Room 30 Elevator Machine Room - Elevator Machine Room - Elevator Machine Room 62
Total Net Area 6,665 5,631 4,678 7,204
2019.10One Story Terminal
Terminal Building Utility Building
2019.7 & 2019.8 2019.10Unoccupied Occupied
2019.7 & 2019.8Two Story Terminal
Program Comparison