TechnicalspecificationforXJ250Workoverrigandunitizedparts

1.0Environmentaloperatingconditions

1.1Temperature

Therigwillbeoperatedinweathervariation:ØMaximumAmbientTemperature:40°CØMinimumAmbientTemperature:-19°C

1.2Generalrequirements

Theambienttemperatureattheplacewheretherigwillbeusedisabout-40°C,thefollowingdesignwillbeconsidered:theweatherproofshieldshouldbedesignedforoperatorandairslips;themudpumpshouldbedesignedwithhouseaswellastheinsulationmeasurements;theworkoverrigisdesignedaspernormaltemperature,butwithwarming&preheatingdevice.

1.3Designstandardandcodes

APISpec4F(3rdedition)DrillingStructures

APISpecQ1(8thedition)QualityPrograms

APISpec8C(5thedition)DrillingHoistingEquipment

APISpec7K(5thedition)DrillingEquipmentSpecs

APISpec7-2006RotaryDrillStemElements

APISpec9A(26thedition)WireRopeSpecs

APISpec7F(8thedition)ChainandSprocket

ISO9001-2008QualityControlSystem

Page 2: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

1.4Maintechnicalspecifications

Structure:Doubledrum,truck-mounted,self-propelled

Servicedepth:3200m(φ2-7/8”tubing)Workoverdepth:2000m(φ2-7/8”DP)

EngineHP:322hp/2200rpm

Drawworksgears:5F+1R

Reevingsystem:3×4ØDia.,

wirelines:Φ22mm

Mastheight:21.6m

Max.statichookload:675KN

Min.turningradius:20m

Min.groundclearance:290mm

Max.climbinggradient:32%

Drivetype:10×6ØMax.speed:80km/h

Workingtemperature:-19°C~40°C

Overalldimensionsintransportation:21.435mX3.2mX4.28m

Totalweightofmainrigintransportation:~40t

Weightonfrontaxles:~16t

Weightonrearaxles:~24t

Page 3: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

2.0Carrierrequirements

2.1Generaldescription

Thedrivetypeofthecarrieris10×6.The1stand2ndaxlesare10tsteeringaxles,hydraulicaidsteering,steelplatespringsuspension.The3rd,4thand5thaxlesare13tdrivingaxles,airsuspension,fittedwithinteraxleandinterwheeldifferentiallock.AllcontrolsofthecarrierarecentralizedintheCOEsingle-seatcab.

1stto2ndaxlespacing:1300mm

2ndto3rdaxlespacing:5750mm

Centerofthefronttwoaxlestocenteroftherearthreeaxles:7900mm

3rdto5thaxlespacing:3000mm

Wheeltrack:2180mm

Drivetype:10×6

Approachingangle:34°

Departureangle:11°

Min.turningradius:20m

Max.climbinggradient:32%

Min.groundclearance:290mmMax.speed:80km/h

Page 4: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

Fronttire:Michelin455/55R22.5XOneXZUS

Reartire:Michelin11R22.5XZY3

2.2Suspensionanddrivesystem

Brake:AllaxlesareequippedwithWABCOpneumaticABSbrakingsystem.

2.3Positioning

Front:2hydrauliclevelingjacksbehindthe2ndaxle

Rear:2hydrauliclevelingjacksattherearoftheframe

Freestandingoutriggers:Foldawayfreestandingstabilizingarmsw/manualmechanicaljacks.Designaspermfg’sspecificationandtoAPI4F.

Totalwidthis10mwhenoperation

2.4Highwayequipment

Towhooks:onefrontandonerear,attachedtotherigframe

Plates:frontandrearlicenseplatemounts2.5Cab

Type:singleseatcaboverengine,heatinsulated

Auxiliaries:heater,defroster,enginepreheatingdevice,windshieldwasherandwiper,dualexternalmirrors,airseat,safetyglass,seatbelt

Instrumentsandcontrols:oilgauge,engineelectronicdisplaymoduleEDM,transmissionoiltemperature,oil

Page 5: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

pressure,throttle,ignitionswitch,startbutton,indicator,transmissionshiftetc.3.0DriveUnit(mainpowersystemispurchasedfrom

3.1Engine

Type:DDCMTU926

Rating:322hp@2200rpm

Starter:Electric:12Volt

Batteries:12Volt

Alternator:12Volt

FlywheelHousing:SAE#1

Completewithengineshutdowndevicetoshutdowntheengineatbothsanddrumandcontrolpanel.

3.2Transmission

Type:Allison4700OFS

Speeds:6forward/1reverse

CompletewithdropboxCOTTATRI397

Notcompletewithdownsloperetarder

3.3Airsystem

Compressor:Enginemounted

Displacement:28cfm

TankCapacity:0.155m3

Page 6: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

Dryer:Bendix

3.4Fuelsystem

TankCapacity:2×400L

Drains:Lowpointvalved

Pump:installedonengine

Flow:Completewithsuctionlinecheckvalve

3.5Engineanddrivingsystem

Type:steelframing/Sheetmetalcover/Enginehoodanddriveshaftguard

3.6Toolbox

Overalldimension:1200x1100x200mm

3.7Hydraulictong(XYQ6B)

Model:XYQ6B

Suitablerange:φ60,φ73,φ89,φ114tubing

Ratedtorque:6kN.mØQty.:1set

3.8Elevatorlink

Model:DH75

Ratedload:735kNØQty.:1pair

Page 7: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

3.9Travelingblock

Model:YG70

Max.staticload:700kN

Qty.:1pc

3.10Winchline

Qty.:1set

3.11Drillline

Dia.:φ22mmØLength:200m

3.12Escapingdevice:SALA

3.13PROTECTAfallarrestor

Qty.:1pc

3.14WeightindicatorJZ75

Structure:LevertypeØQty.:1set

Page 8: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

4.0HydraulicSystem

4.1Hydraulicpowerunit

Drive:PTOfromtransmission

Pump:Mainoilpump(formainrighydraulicsystem)

Reservoir:Volumeofhydraulicfueltank:870L

Instrumentation:Temperaturegauge,filter,tanklevel

Auxiliaries:Completewithreturnfilters

Maximumambienttemp:40°C

Maximumpressureopenloop:14Mpa

Overflowvalves:Mountednearthedischargeportofmainoilpump

4.2Standpipeandrotaryhose

4.2.1Standpipe,1pcDiameter2”,workingpressure35MPa,endthread2”NPTmale

4.2.2Rotaryhose,1pc

Diameter2”,workingpressure35MPa,theendthreadconnectedtoswivelis2”NPTmale

5.0Mast

5.1Generaldescription

Derrick,21.6msinglestagemast,free-standingtype,raisedbyhydrauliccylinder.Inclinationanglecanbeadjustedbyscrewrod.

Page 9: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

Mastisplacedintegrallyonthecarriertofacilitatetransportation.Itcanalsobeshippedseparatelywhenitisdifficulttotransportintegrallyorinlong-distancetransport.

AsperAPISpec4Fstandard

Includerackingboard,rodhanger,guyline,raisingcylinder,etc.

C/wemergencyexitdoor

Alldevicesmountedonthemastarefastenedtoavoidlooseness.

C/wescapingdeviceonrackingboard.

Technicalparameter

Max.hook:675kN

Mastheight:21.6m

Heightofrackingboard:7.7m

Capacity:2500m(φ2-7/8”tubing)

Heightofrodhanger:16.76m(55’)

Capacity:2500m(φ1”rod)

Max.windrate:110km/h

5.2Mastfeature

Clearheight:21.6m

Qty.ofdrillline:6

Hookload:675kN

Page 10: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

Standard:API4F

Hydraulicraisingsystem:aspermanufacturer’sdesign(mfg)

Loadguyline:2internal-loadguylines,2rackingboardwindloadguylines

Mastladder:mountedondriller’ssidetomastcrow

Rackingboard:tubingφ2-7/8”,singletubing2500m

Rodhanger:rodφ5/8”~φ1”,doublestand2500m

Rackingboard/rodhanger:stretchedandfoldedsimultaneouslybyhydrauliccylinder.

5.3Safetydevice

C/wfallarresteronmastcrownplatformandrodhanger.Staticload:2270kg(5000lb).Rackingboardisequippedwithescapedoorandescapeway,c/wSALAescapedevice.

5.4Sparepartsofmast

Drillline:22mm(7/8”)

Drilllinereelsupport:suitableforφ28”×21”reel

Crown:Bottomdiameter,crownsheave:φ450Bottomdiameter,fastlinesheave:φ525Bottomdiameter,sandsheave:φ450

Deadlineanchor:mountedonthecarrierframe

Hydraulicwinch:2tondoublewinch

Page 11: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

Drawworkcontrol:drillercontrolled

Hydraulicwinchcontrol:aircontrolled

Standpipe:2”borediameter,35Mpaworkingpressure,completewith2”NPTmalethreadonbothends.

5.5CircuitandlightingsystemBasicdescription

Includetravelingsystemandlightingsystem

Travelingsystemuses12VDC,suppliedfrombatteryandsiliconrectificationalternatordrivenbytheengine,mainlyincludingenginestart-up,lightsignalsofmotoringgaugesonthecarrierandvariouslightsandacousticsignalsduringtravelingetc.

C/wdistributionboxtoprovidemastandcarrierwith110V,60Hzpower

Masttopisequippedwithredlight(withshield),lightingcableareprotectedbysteeltube.

Alllightingequipmentsarevapor-proofandshockproof.TechnicalparametersØPowerforcarrier:12VDCØCarrierandmast:explosion-proof

6.0Drawwork

6.1Generaldescription

Maximumfastlinepull,maindrum:140kN

Page 12: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

Type:dualdrumdrawworks

Grooving:Lebus:22mmwirelines

Drilllinespoolcapacity:240m

Drive:mechanicalrightanglegearbox

Mainbrake:bandbrake

Speeds:5forward/1reverse

Brakecoolingtank:227L(60gal)

Brakecooling:waterspray

Crownsaver:overwindingvalvecrownsaver

Completewithelectroniccrownsaver

6.2Maindrum

BasicdescriptionMaindrumisdesignedwithφ22mmLEBUSgroove.

ATD-224Hthrustdiskclutchisusedonthemaindrum

Mainbrakeisbandbrake

Overwindingvalvecrownsaverissetabovemaindrum.

Waterspraycoolingforbrakerim.

Alllubricationpointsforthedrawworksareoutsidetheguard,centrallubricated.

Chainboxisinstalledoutsidethedrawworkframe,completewithoillevelobservationholeandoilleakageprotectiondevicetoensuredismantlingandmountingforseveral

Page 13: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

times.

Technicalparameters

Maximumfastlinepull:140kN

Dia.×length,maindrum:Ф344×690mmØDia×width,brakedrum:Ф970×260mm

6.3SandlinedrumBasicdescription

ATD-124Hthrustdiskclutchisusedonsandlinedrum.ØWaterspraycoolingforbrakerim.

Technicalparameters

Groovedia.×length,sandlinedrum:φ324mm×812mm

Dia×width,brakedrum:φ970mm×210mm

Maximumfastlinepull:115KN

Sandline:14.5mm×2800m

6.4RightanglegearboxBasicdescription:

DrivenbyGleasonhelicalbevalgear,takingadvantagesinlargetransmissiontorque,stablerunningandlongservicelife.

Technicalparameters:

Gearratio,rightanglegearbox:1:1.8956.5Driveshaft

Driveshaftondeckandunderdeck1set

Page 14: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

7.0WorkPlatform

7.1Workfloor

Heighttoworkfloor:adjustable1.5~3m

Area:duringoperation,theareais3mx2.4mwithhandrails.

7.2Mastsupportbase

FixedtypeA-baseanddesigntoAPI4Fstandards.Thefrontinclinationangleofmastcanbeadjustedthroughscrewrodsatmastleg.

7.3Access

Walkways:foldable(withhandrailsandkickplates)walks,660mmondriller’sside.

Surface:anti-slip

Stairs:twostairstoaccesswalkwayatdriller’sside,onestairtoaccessdriller’sconsoleandonestairtoaccesstheworkfloor.Allstairsarecompletewithdoublehandrailsandhavesteelmeshatback.Handrailsareremovable,designedwithpinconnection.

8.0Crown

Model:TC70

Max.hookload:675kN

Page 15: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

9.0F18-21BOPstack

9.1AnnualBOP7-1/16",3000Psi(FH18-21)

Boresize:179.4mm(71/16”)

Workingpressure:21MPa(3000Psi)

Hydrauliccontrolpressure:≤10.5MPa

Lockrange:0~179.4mm

Endconnections:Upperend71/16”x3000psi,threadconnectionLowerend71/16”x3000psi,flangedconnection

Canmountballtyperubbercore

Fourpadeyesareprovidedonthetopcap,andeachpadeyeismarkedratedloadandequippedwithfournuttypeshackles.

Hydrauliccontrolconnectiontype:1”NPT

9.2DoubleramBOP7-1/16",3000Psi(2FZ18-21)

Boresize:179.4mm(71/16”)

Workingpressure:21MPa(3000Psi)

Hydrauliccontrolpressure:≤10.5MPa

Lockrange:manually

Endconnections:Upperend71/16”x3000psi,thread

Page 16: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

connectionLowerend71/16”x3000psi,flangedconnection

Hydrauliccontrolconnectiontype:1”NPT

RamBOPisequippedwithmanual-lockingdeviceusedtoshutdownramincasethathydrauliccontrolfails.

TheuppersectionoframBOPisequippedwith31/2”ram,andthelowersectionisequippedwithblindram.

9.3FS18-21drillingspool

Maindiameter:179.4mm(71/16”)

Workingpressure:21MPa(3000Psi)

Endsconnections:71/16”x3000Psi,flangeconnection

Sideoutletconnection:41/16”x3000Psi,flangeconnection

Page 17: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

9.4Configuration

S/N Description Model Qty.

Remark

1 AnnualBOP 7-1/16",3000psi 1

H2S

2 DoubleramBOP 7-1/16",3000psi 1

Upperpart:3-1/2ʹʹ,lowerpart:blindram

3 Drillingspool 7-1/16",3000psi 1 2-1/16"×3000Psisideflange

connection

4 Ramassy.

7-1/16",3000psi31/2" 1

5 Ramassy. 7-1/16",3000psiblindram 1

6

Reducingramassy. 7-1/16",3000psi23/8"-31/2" 2

7 BOPhoistingdevice

Suitablefor7-1/16",3000psiBOPstack

1

10.0HPFireproofhose

S/N

Description Size UnitQty.

Note

1 GNGHPfireproofhose Ф25×35MPa

pc

36

Armored

Page 18: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

2 Universalself-sealingfitting Ф25×35MPa set 20

3 HPunion(self-sealing) Ф25×35MPa set 36

4 Cabletray(meshtype) 10m pc 2

11.0Electronicignitiondevice

Electronicignitiondeviceanditspipelines(length=25m);itcanigniteautomatically.Thediameterofthepipelinesis4”,withflangedconnection.

12.0FKQ320-4GAccumulator

12.1Remoteconsole

1no.remoteconsole,includingthefollowingcomponentswhichareinstalledonthebase

1no.790Loiltank,w/electricheatingdevice

8nos.40L21MPa(3000psi)accumulator,sideplaced

1no.electrictriplexpump,w/pressurecontrollerandoverflowvalve.Theflowrateofthepumpis35L/minunder21MPa(3000psi).Themotoris15kW460V/60Hz

1no.pneumaticoilpump,thedisplacementofthepneumaticoilpumpis60ml/stroke

1no.airsourcemanifolds,includingreliefvalve,atomizedlubricator,waterfilter,bypassvalveandhydraulic&airswitch.

1no.controlmanifolds

Page 19: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

12.2Driller’sconsole

1no.driller’sconsole,usedforBOPcontrol;1no.explosive-proofjunctionbox,usedforthewiringofalarmlightanddisplaylight

12.3Aircable

1no.aircableusedforconnectingremoteconsoleanddriller’sconsole,length=50m

1no.aircableusedforconnectingremoteconsoleandauxiliaryconsole,length=50m

Theaircableiswiththefeaturesofhightemperatureresistantandoilimmersionresistant12.4Airsourcepipelines

W/1no.25mairsourcepipelines,usedforconnectingtheairsourceofremoteconsolepneumaticpump

W/2nos.30mairsourcepipelines,usedforconnectingtheairsourceofauxiliarydriller’sconsole

W/1no.10mairsourcepipelines,usedforconnectingtheairsourceofdriller’sconsole

Eachendoftheairsourcepipelinesisequippedwith1no.crossoverconnectorandquickconnector.

12.5ProtectionhouseUsedforprotectingofremoteconsole

Page 20: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

12.6Alarmingdevice

Theunitisequippedwithalarmingdevice,including1on.Cable(50m)usedforconnectingtheremoteconsoleanddriller’sconsole.Thealarmingdevicecanhaveaudibleandvisualalarmunderthefollowingcircumstances:

Thealarmingcanbeclearedatremoteconsole.

Thealarmingdeviceincludesalarmer,liquidometer,explosive-proofpressurecontroller,explosive-proofplugdeviceetc.

1groupofexplosive-proofalarminglightissetontheroofofremoteconsoleprotectionhouse,whichisusedfordisplayingthealarmingitems.

Thealarmingcablesanditsconnectorarewiththefeaturesofhightemperature&oilimmersionresistance,explosive-proofandwaterproof.

13.0Pipehandlingsystem

Thepowercatwalkassy.mainlyconsistsofpowercatwalk,hydraulicpiperackandtubularbox,whichcanrealizethemechanicaltransferringofthetubularbetweentubularboxes/groundpiperackareaandrigfloor.Thecatwalkcanrealizethetubularraisingviahydrauliccylinder;andtheendofthetubularwillbepushedbesidethemousehole.Thepowercatwalkhas2nos.controlmodes:wirelessremotecontrolbyhandbox,emergencycontrollocally.Thehydraulicpiperackhas4pieceswhichareinstalledseparatelyoneachsideofpowercatwalk.Thedistancefrompiperacksurfacetogroundis1200mm.Thetubularcanbeplacedinsinglelayerandcanberolledin/outautomatically

Page 21: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

bycontrollingitsinclinationangle.Thetubularboxcanaccommodate800m3-1/2"tubing.Itcanbebuttjointedwithhydraulicpiperack,realizingtubularrollingout/backautomaticallyfromtubularboxtohydraulicpiperack.

Basicparameters

Maxheight,rigfloor:4m

Max.length,transferringtubular:11m

Max.dia.,transferringtubular:Φ508mm(20")

Max.weight,transferringtubular:30kN

Transportationdimension:9.2m×1.5m×1.6m

14.0Raiseddriller’sconsole14.1Specification

Hydrauliclevelingjackconsolelayout:

Controlatrearofcarrierdeck

DrillersConsoleArrangement:

Singlepersonunitizedcontrolsforallrelatedfunctionsoncarrierandmast.

About1300mmfromthedriller’sconsoletothedeck

DrillersControls:

Drawworksbrake

Drawworksclutch

Enginethrottle

Page 22: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

Engineemergencyshutdown

Hydraulicpumpcontrol

Hydraulicwinch

Gauges

Resetforcrownsaver

Forexplosion-proofpurpose,thecontrolsforelectricaldevices,suchasenginestart-upandtransmissiongear-shiftaresetatthebackofthedrawworksinsteadofonthedriller’sconsole.Forsafety,one(1)alarmingunittoavoidtherigfromtiltingisadded.

15.0Explosion-proofcontrolcabinetandwellsiteelectricsystem

15.1Explosion-proofcontrolcabinet

Theexplosion-proofcontrolcabinetismountedinthegeneratorhouseandsuppliespowertothefollowingequipments:Breaker

No. Description Ratedload Qty. Ratedvoltage

1

Powersupplyofbaiscrig 100A 1 480V

2 Powersupplyofwellcontrolhouse 60A 1 480V

3

Pipehandlingsystem 60A 1 480V

4

Backup 100A 3 480V

Page 23: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

5 Backup 60A

3

480V

Asetof208V/110Villuminatedpanel,three-phasefour-linesystem,currentofmainbreaker:150A.

No. Qty. Description

1 1 25Ailluminationofbasicrig

2 1 16Ailluminationofgeneratorhouse

3 2 Spare25Aillumination

4 2 Spare16Aillumination

5 5 25A,208Vpowersupplyofelectricheater

15.2WellsiteACpowersupplysystem

Lowertemperaturepowerandcontrolcableinclude:1)alllowtemperaturepower,lightingandcontrolcables.2)lowtemperaturepowerandlightingcablesfromexplosion-proofcontrolcabinettoeachareaofwellsite.3)lowtemperaturecablefromexplosion-proofcontrolcabinettogeneratorhouse.Alllowtemperature,lightingandcontrolcableshavegoodperformance.

Page 24: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

Allcablesarewithgoodperformanceofcorrosionprevention,oilresistance,hightemperatureresistanceandagingresistancewhichcouldbesuitableforhumidanddryenvironment.

Controlunitandlowtemperaturecableofelectricequipmentinwellsiteareprotectedbycabletray.Lightingcircuitandlampsofmast,carrierandmudtankareanti-explosive.Lampholderinmudtankareaisadjustableandcanbelaydownhorizontally.Mastlightingcableareprotectedbygalvanizepipe.C/wanti-explosivedistributionbox.Allanti-explosivewirelineportsareequippedwithwater-proofsealingclamp.

15.3Scopeofsupply

No. Qty. Description

1 1 Explosion-proofcontrolcabinet

2 1

Illuminatingpanel

3

1 Lowertemperaturepowerandcontrolcable

4

1 Wellsiteexplosionproofcircuit

5 1 Cabletray

16.0Generatorset

Model:WQ30dieselgeneratorset

Continuousoutput:32kW/41kVA@60Hz

Page 25: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

Standbyoutput:35kW/45kVA@60Hz

17.0Doghouseonthewellsite

Itincludegeneratorhouse,changingroom,washroom,BOPcontrolhouse,allarepoweredbygenerator.Changingroomandwashroomarecompletedwithairconditioning,emergentlightingsystemandheatingsystem.

18.0Ploughtypetool

ItincludesBOPpressuretestboard.

19.0Color

Components

Color

Windshield Darkgrey

Engineshield-inner Dovegrey

Engineshield-outer Dovegrey

Engine

Cablowersection3’ Darkgrey(CLR4573)

Cabuppersection

Dovegrey(CLR10588)

Drawworks Dovegrey(CLR4573)

Toolbox(ondeck)

Dovegrey(CLR10588)

Toolboxinside

White

Page 26: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

Handrailsforladdersandwalkway Dovegrey(CLR10588)

Ladder Darkgrey(CLR4573)

MastfoundationAframeandoutrigger Darkgrey(CLR4573)

Chassishandrail Darkgrey(CLR4573)

Chassisdeck Darkgrey(CLR4573)

XJ450T-18

Frontsafetybelt White

Rim White

Mast White

Crown

Orange(CLR13885)

Suckerrodbasket Orange(CLR13885)

Rackingboard

Orange(CLR13885)

Operationplatform

Orange(CLR13885)

Cab3”tape Orange(CLR13885)

20.0Toolscome-alongwiththerig

S/N Descriptionandsize Qty.

1 Tireboxspanner32X34 1pc

Page 27: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

2 2poundballfacehammer 1pc

3 Hacksaw300mm 1pc

4 Steelchisel150mm 1pc

5

16toiljack 1pc

6 Greasegun400CC 1pc

7

Pressureoilcan0.5kg 1pc

8

Clearancegauge100mm 1set

9 Levelbar600mm 1pc

10 Workinglamp 1pc

11 Tirepressuregauge 1pc

12 Gasfillinghose 1set

13 Straightclampplate 2sets

14

Bentclampplate 2sets

15 Longcrowbar 1pc

16 Shortcrowbar 1pc

Page 28: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

17

Springlocationrod 6pcs

18 Puller 1set

19 Rubberappliance,stabilizerbeam 1set

20 Chainspanner 1set

21 Hookspanner(5in1) 1set

21.0Documentcome-alongwiththerig

S/N Description Language

Qty.

1 Operationandmaintenancemanualfortherig nEnglish 2

2 Operationandmaintenancefortheengine Original 1

3 Operationandmaintenanceforthetransmission Original 1

4 Certificate nEnglish

1

5 Packinglist nEnglish

2

6 CopyofAPIcertificates Original

2

7 CopyofISO9001certificate Original 2

Page 29: Technical specification for XJ250 workover rig and unitized parts · 2018-08-28 · Technical specification for XJ250 Workover rig and unitized parts 1.0 Environmental operating conditions

8 Qualityassurancereportformaincomponents nEnglish

2

9 Operationandmaintenancemanuals,aswellascertificatesof

outsourcingpartsOriginal

1