CONNECT TO EXISTING CONDUIT
SC
L-824 AIRFIELD CABLE, 1 CONDUCTOR
L-824 AIRFIELD CABLE, 2 CONDUCTOR
L-824 AIRFIELD CABLE, 3 CONDUCTOR
L-824 AIRFIELD CABLE, 4 CONDUCTOR
EXISTING TAXIWAY LIGHT
EXISTING PULL BOX OR ELECTRICAL MANHOLE
COUNTERPOISE
DTG
XX
DUCT BANK
S
SS
SS
SS
S
S
S
SS
S
S
S
S
S
S
S
S
S
S
S
SS
S
S
S
S
S
S
S
S
SS
S S
SS
SS
S
S
S S S S
SS
S
S
S
S
S
NEW OR SALVAGED ELECTRICAL MANHOLE -
SEE DETAIL DWG E-18
NEW OR SALVAGED ELECTRICAL SPLICE CAN-
SEE DETAIL DWG E-18
W Y
W Y
WY
WY
SSS
S S
W W
W W
S S
S
S
S S S S S
SSSSS
S
S
S
S
S
S
S
S
S
SDSD
SD
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSDSD
TAXIWAY 'C'
TAXIWAY 'G'
TAXI
WAY
'D'
SOU
TH
TAXI
WAY
'A'
SOU
THTA
XIW
AY 'A
'N
OR
TH
TAXI
WAY
'D'
NO
RTH
RUNWAY 11-29 RUNWAY 11-29
TAXI
WAY
'J'
SOU
THTA
XIW
AY 'J
'N
OR
TH
TAXI
WAY
'M'
SOU
THTA
XIW
AY 'M
'N
OR
TH
TAXIWAY 'C'
TAXIWAY 'G'
TAXI
WAY
'F'
TAXI
WAY
'F'
RUNW
AY 5
-23
TAXIWAY 'A' NORTH REALIGNMENTFOR 90° INTERSECTION
TAXIWAY 'A' SOUTH REALIGNMENTFOR 90° INTERSECTION
TAXILANE REALIGNMENTTO MEET GRADE REQUIREMENTS
STORM DRAIN IMPROVEMENTS
STORM DRAIN IMPROVEMENTS
STORM DRAIN IMPROVEMENTS
UPDATE TAXIWAY GEOMETRY
UPDATE TAXIWAY GEOMETRY UPDATE TAXIWAY GEOMETRY
UPDATE TAXIWAYGEOMETRY
UPDATE TAXIWAY GEOMETRY
UPDATE TAXIWAY GEOMETRY
RUNWAY 11-29 RECONSTRUCTION
RUNWAY 11-29 MILL ANDOVERLAY TRANSITION
NEW RUNWAYLIGHTS AND SIGNS
SAFETY AREA GRADING IMPROVEMENTS SAFETY AREA GRADING IMPROVEMENTS
SAFETY AREA GRADING IMPROVEMENTS
STAGING AREA
CONTRACTOR FIELD OFFICE, CONTRACTORPROVIDED ENGINEER'S FIELD OFFICE.EXACT LOCATION TO BE COORDINATED WITHOWNER. SEE SPECIAL PROVISION SECTION 31.
CONTRACTOR PROJECTACCESS NORTH END. INSTALL
TEMPORARY 24' WIDE X 7'HIGH CHAIN LINK FENCE GATE.
SEE NOTE ABOVE.
CONTRACTORPROJECT
ACCESS SOUTHEND.
CONTRACTOREMPLOYEEPARKING
MILLINGSDISPOSAL AREA.
CONTRACTOR STAGING AREA.-ASPHALT PLANT LOCATION IF
REQUIRED FOR PROJECT.
WASTE EXCAVATION DISPOSALAREA.
HAUL ROUTE.NORTH SIDE OF
PROJECT TOSOUTH SIDE OF
PROJECT.
FAA RADAR FACILITY.
CONTRACTOR EMPLOYEEPARKING.
TEMPORARY CHAIN LINK FENCE INSTALLATIONNOTES:
1. SEE DETAIL DRAWING D-6 FOR FENCEINSTALLATION.
2. COORDINATE WITH OWNER FOR PADLOCK ANDKEY FOR TEMPORARY GATE.
3. A GATE GUARD MUST BE PRESENT AT THE GATEDURING INSTALLATION AT ANY TIME THERE ISAN OPENING IN THE FENCE.
2017COPYRIGHT © MORRISON-MAIERLE, INC.,
SHEET NUMBER
PROJECT NUMBER
DRAWING NUMBER
VERIFY SCALE!
THESE PRINTS MAY BEREDUCED. LINE BELOW
MEASURES ONE INCH ONORIGINAL DRAWING.
MODIFY SCALE ACCORDINGLY!
DATEDESCRIPTIONNO. BY
R:\2143\2143 AIP 40\054-RW 11-29 DESIGN\ACAD\SHEETS\2 PROJECT LAYOUT.DWG PLOTTED BY:CORY R. KESLER ON Jun/29/2017
REVISIONS DRAWN BY:
DSGN. BY:
APPR. BY:
DATE:
Q.C. REVIEW
DATE:BY:
1 Engineering PlaceHelena, MT 59602
Phone: 406.442.3050Fax: 406.442.7862
engineers surveyors planners scientists
MorrisonMaierleREDMOND MUNICIPAL AIRPORT-ROBERTS FIELD
RUNWAY 11-29 PAVEMENT REHABILITATIONAIP 3-41-0052-42-2016
2143.054
REDMOND OREGON
PROJECT LAYOUT
2
G-2
AJG
CRK
TFO
6-28-2017
FINAL6-28-2017
TFO6-19-2017
LEGENDASPHALT PAVEMENTRECONSTRUCTION
MILL AND OVERLAY ORREGRADE AND PAVE
SAFETY AREA GRADING
NEW STORM DRAIN - PIPE
SCALE IN
0300 300 600150
FEET
SD SD
NOTES:
1. REFER TO THE CONSTRUCTION SAFETY AND PHASING PLAN AS IT PROVIDES DETAILEDINFORMATION ON THE SITE ACCESS, SECURITY, AND PHASING FOR THE PROJECT.
2. ALL ASPHALT MILLINGS FOR GENERATED FROM THE PROJECT SHALL REMAINPROPERTY OF THE OWNER AS DISPOSED OF AT THE DESIGNATED LOCATION. MILLINGSFROM THE NORTH SIDE OF THE PROJECTS MAY BE TEMPORARILY STOCKPILED THENMOVED TO THE FINAL STOCKPILE LOCATION. SEE TECHNICAL SPECIFICATION FORFURTHER INFORMATION.
3. A LOCATION FOR AN ON-SITE ASPHALT PLANT HAS BEEN DESIGNATED ON THECONSTRUCTION DRAWINGS FOR THE CONTRACTORS USE. THE CONTRACTOR ISREQUIRED TO OBTAIN ALL REQUIRED PERMITTING FOR THE ONSITE ASPHALT PLANT.THE CONTRACTOR SHALL PROVIDE MAXIMUM EQUIPMENT HEIGHTS ANTICIPATEDWITHIN THE DESIGNATED AREA.
4. IF ON SITE CRUSHING OF MATERIAL IS PROPOSED FOR THE PROJECT, THECONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITTING FOR THEIR OPERATIONS.
5. A WASTE EXCAVATION SITE HAS BEEN LOCATED ON THE DRAWINGS. THE WASTEEXCAVATION SITE SHALL BE GRADED SMOOTH AT THE COMPLETION OF CONSTRUCTIONAND GRADED TO DRAIN.
6. THE CONTRACTOR IS ALERTED THAT GATE GUARDS MAY BE REQUIREDSIMULTANEOUSLY AT MULTIPLE GATE LOCATIONS DURING CONSTRUCTION.
7. CONTRACTOR TO PROVIDE FIELD OFFICE FOR ENGINEER. MUST BE SEPARATE FROMCONTRACTOR'S FIELD OFFICE. PROVIDE MINIMUM 8' X 20' FIELD OFFICE WITH POWER,HEAT, AC, DESK, OFFICE CHAIR, TABLE, AND SANITARY FACILITIES. SEE SPECIALPROVISIONS SECTION 31.
SDSD
SD
SDSD
SD
SD
SD
SD
SD
2W
2W
SD
SD
SD
SD
SD
SD
SDSDSD
SDSD
SD
SDSD
SD
SD
SD
SD
SD
2W
2W
SD
SD
SD
SD
SD
SD
SDSDSD
SDSD
SD
SDSD
SD
SD
SD
SD
SD
2W
2W
SD
SD
SD
SD
SD
SD
SDSDSD
PHASE 6
PHASE 5
PHASE 1
FOREST SERVICE AIRTANKER BASE
CONTRACTOR STAGINGAREA 'A'PHASE 1-5.
PHASE 3
PHASE 4
PHASE 2
INSTALL TEMPORARY GATEFOR CONSTRUCTION ACCESS
PHASE 1-5 ACCESS
CONTRACTOR STAGINGAREA 'B'
PHASE 6.
EXISTING GATE F-2.PHASE 6 ACCESS
TAXIWAY 'D'
TAXI
WAY
'F'
RUNW
AY 5
-23
TAXIWAY 'C'
RUNWAY 11-29 RUNWAY 11-29
TAXIWAY 'G'TAXIWAY 'G'
TAXIWAY 'C'
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
RSA
EMPLOYEE PARKINGPHASE 1-5.
EMPLOYEE PARKINGPHASE 6
MILLING STOCKPILE AREA.ALL PHASES
WASTE EXCAVATION AREA.ALL PHASES
FOREST SERVICEJUMPER BASE
TW 'J
' NO
RTH
TW 'J
' SO
UTH
TW 'M
' NO
RTH
TW 'M
' SO
UTH
TW 'D
' NO
RTH
TW 'A
' NO
RTH
TW 'A
' SO
UTH
TW 'D
' SO
UTH
TAXIWAY 'N'
HANGAR AREA
FBO AREA
FBO AREA ANDGENERAL AVIATIONAREA.
2017COPYRIGHT © MORRISON-MAIERLE, INC.,
SHEET NUMBER
PROJECT NUMBER
DRAWING NUMBER
VERIFY SCALE!
THESE PRINTS MAY BEREDUCED. LINE BELOW
MEASURES ONE INCH ONORIGINAL DRAWING.
MODIFY SCALE ACCORDINGLY!
DATEDESCRIPTIONNO. BY
R:\2143\2143 AIP 40\054-RW 11-29 DESIGN\ACAD\SHEETS\5 CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) OVERVIEW.DWG PLOTTED BY:CORY R. KESLER ONJun/29/2017
REVISIONS DRAWN BY:
DSGN. BY:
APPR. BY:
DATE:
Q.C. REVIEW
DATE:BY:
1 Engineering PlaceHelena, MT 59602
Phone: 406.442.3050Fax: 406.442.7862
engineers surveyors planners scientists
MorrisonMaierleREDMOND MUNICIPAL AIRPORT-ROBERTS FIELD
RUNWAY 11-29 PAVEMENT REHABILITATIONAIP 3-41-0052-42-2016
2143.054
REDMOND OREGON
CONSTRUCTION SAFETY ANDPHASING PLAN (CSPP) OVERVIEW
5
CP-2
AJG
CRK
TFO
6-28-2017
FINAL6-28-2017
TFO6-19-2017
SCALE IN
0100 100 20050
FEET
LEGEND
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 5
PHASE 6
GENERAL NOTES:
1. THE CONTRACTOR IS ALERTED THAT OTHERCONSTRUCTION PROJECTS AT THE AIRPORT MAY BEONGOING DURING THE CONSTRUCTION OF THERUNWAY 11-29 PROJECT.
2. THE SEQUENCE OF THE CONSTRUCTION PHASES ISBASED THE ANTICIPATED SEQUENCE OFCONSTRUCTION AS IT RELATES TO OTHERCONSTRUCTION ACTIVITIES AT THE AIRPORT.
3. THE SEQUENCE OF THE CONSTRUCTION PHASES FORTHE PROJECT MAY BE ALTERED AT THE OWNER'SDISCRETION TO MINIMIZE IMPACTS TO AIRPORT USERSAND TO MINIMIZE CONSTRUCTION IMPACTS TO THEAIRPORT. THERE SHALL BE NO ADDITIONAL COST TOTHE OWNER FOR CHANGES IN SEQUENCE OF THEPHASES OF CONSTRUCTION.
PHASE 1 NOTES:
1. THE PHASE 1 CONSTRUCTION AREA IS DELINEATED TOMINIMIZE THE CLOSURE TIME OF TAXIWAY 'C' ANDTAXIWAY 'G'.
PHASE 3 NOTES:
1. THE PHASE 3 CONSTRUCTION IS DELINEATED TOPROVIDE FOR CONSTRUCTION AT THE INTERSECTIONOF TAXIWAY 'C' AND TAXIWAY 'D' NORTH.
2. TAXIWAY 'A' SHALL BE COMPLETED TO THE EXTENTTHAT IS IS AVAILABLE FOR TAXI OPERATIONS PRIOR TOSTARTING WORK IN PHASE 3.
3. PHASE 1 PAVING ON TAXIWAY 'D' NORTH MAY BECOMPLETED CONCURRENTLY WITH THE PHASE 3WORK. PHASE 6 NOTES:
1. THE PHASE 6 WORK MAY OCCUR CONCURRENTLY WITHTHE PHASE 1-5 WORK. HOWEVER, WORK ON PHASE 6SHALL NOT IMPACT DURATION OF CONSTRUCTION ONPHASE 1-5.
PHASE 4 NOTES:
1. THE PHASE 4 CONSTRUCTION IS DELINEATED TOPROVIDE FOR CONSTRUCTION AT THE INTERSECTIONOF TAXIWAY 'G' AND TAXIWAY 'D' SOUTH.
2. PHASE 2 SHALL BE COMPLETED PRIOR TO PHASE 4CONSTRUCTION OPERATIONS.
3. TAXIWAY 'A' SHALL BE COMPLETED TO THE EXTENTTHAT IS IS AVAILABLE FOR TAXI OPERATIONS PRIOR TOSTARTING WORK IN PHASE 4.
3. PHASE 1 PAVING ON TAXIWAY 'D' SOUTH MAY BECOMPLETED CONCURRENTLY WITH THE PHASE 4WORK.
PHASE 2 NOTES:
1. THE PHASE 2 CONSTRUCTION IS DELINEATED TOPROVIDE FOR CONSTRUCTION AT THE INTERSECTIONOF THE TAXILANE AND THE ADJACENT HANGAR AREA
2. PHASE 2 WORK WILL ELIMINATE AIRFIELD ACCESS TOSOME HANGAR OWNERS. THE DURATION OF THECLOSURE SHALL BE KEPT TO A MINIMUM.
3. WORK ON PHASE 2 SHALL TAKE PRECEDENT OVERWORK ON ALL OTHER PHASES. PHASE 5 NOTES:
1. THE PHASE 5 CONSTRUCTION IS DELINEATED TOPROVIDE FOR CONSTRUCTION AT THE INTERSECTIONOF THE RUNWAY 11-29 AND TAXIWAY 'F'. THE WORK INTHE PHASE 5 AREA IS MARKING AND SIGN RELOCATIONWORK.
2. THE DURATION OF THE CLOSURE SHALL BE KEPT TO AMINIMUM.
PHASE DURATIONS
PHASE 1 175 DAYS TOTALPHASE 2 30 DAYS TOTAL, CONCURRENT
WITH PHASE 1PHASE 3 14 DAYS TOTAL CONCURRENT
WITH PHASE 1PHASE 4 14 DAYS TOTAL CONCURRENT
WITH PHASE 1PHASE 5 3 DAYS TOTAL, CONCURRENT
WITH PHASE 1PHASE 6 230 DAYS CONCURRENT WITH ALL
OTHER PHASES
ANTICIPATED CONSTRUCTION SEQUENCING
CONSTRUCTION PHASE WORK TO BE PERFORMED
PHASE 3 ASPHALT MILLING AND OTHERREMOVALS WITHIN TAXIWAY 'C'
OBJECT FREE AREAPHASE 4 ASPHALT MILLING AND OTHER
REMOVALS WITHIN TAXIWAY 'G'OBJECT FREE AREA
PHASE 1 REMOVALS AND ALL WORK UP TOTHE TOP OF BASE COURSE
PHASE 2 ALL WORK
PHASE 1 ASPHALT PAVING, MARKING, ANDFINISH GRADING, OPEN TAXIWAY
'A' FOR OTHER PHASESPHASE 3 EARTHWORK, PAVEMENT
SECTION CONSTRUCTION, EDGEDRAIN, ELECTRICAL, MARKING
AND FINISH GRADINGPHASE 4 EARTHWORK, PAVEMENT
SECTION CONSTRUCTION, EDGEDRAIN, ELECTRICAL, MARKING
AND FINISH GRADINGPHASE 5 MARKING AND ELECTRICAL
PHASE 1 COMPLETE REMAINING ITEMS
PHASE 6 SEE PHASE 6 NOTES.
SDSD
SD
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSD
SDSD
SD
SDSD
SD
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSD
SDSD
SD
>> >> >>
>>>>
>> >> >> >> >> >> >>
>>
>> >>
>> >> >> >> >> >> >>
>> >> >>
>>
>>>>
>> >> >>
>>
>>>>
>> >>
TAXIWAY 'D'
TAXI
WAY
'F'
RUNW
AY 5
-23
TAXIWAY 'C'
RUNWAY 11-29
TAXI
WAY
'D'
NO
RTH
TAXI
WAY
'A'
NO
RTH
TAXI
WAY
'A'
SOU
TH
RUNWAY 11-29
TAXIWAY 'G'
TAXI
WAY
'D'
SOU
TH
STAGING AREA PHASE 1
93.0
0'
93.00'
93.0
0'
59.0
0'59
.00'
59.00'
250.00'
250.00'
250.00'
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
TAXIWAY 'C'
TAXIWAY 'G'
DEACTIVATE LIGHTSON TAXIWAY 'C'SOUTH OF RUNWAY5-23.
DEACTIVATE LIGHTSON TAXIWAY 'G'SOUTH OF RUNWAY5-23.
DEACTIVATE LIGHTSON TAXIWAY 'C & A' INCLOSED AREA.
DEACTIVATE LIGHTSON TAXIWAY ''A' INCLOSED AREA. DEACTIVATE LIGHTS
ON TAXIWAY 'D INCLOSED AREA.
SIGN COVER. TYP.
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LIGHTED RUNWAYCLOSURE 'X'
PLACE ON RUNWAY29 NUMBERS.
LIGHTED RUNWAYCLOSURE 'X'
PLACE ON RUNWAY 11NUMBERS.
AIRCRAFT TAXI ROUTE.COORDINGATE WITH AIRPORT TOBLOCK OFF AIRCRAFT PARKINGAREAS WITHIN 93' OF TAXI ROUTE.
PHASE 1A AREA. SEENOTES.
GATE ACCESS PHASE 1
EMPLOYEE PARKING PHASE 1
2017COPYRIGHT © MORRISON-MAIERLE, INC.,
SHEET NUMBER
PROJECT NUMBER
DRAWING NUMBER
VERIFY SCALE!
THESE PRINTS MAY BEREDUCED. LINE BELOW
MEASURES ONE INCH ONORIGINAL DRAWING.
MODIFY SCALE ACCORDINGLY!
DATEDESCRIPTIONNO. BY
R:\2143\2143 AIP 40\054-RW 11-29 DESIGN\ACAD\SHEETS\6 CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) PHASE 1.DWG PLOTTED BY:CORY R. KESLER ON Jun/29/2017
REVISIONS DRAWN BY:
DSGN. BY:
APPR. BY:
DATE:
Q.C. REVIEW
DATE:BY:
1 Engineering PlaceHelena, MT 59602
Phone: 406.442.3050Fax: 406.442.7862
engineers surveyors planners scientists
MorrisonMaierleREDMOND MUNICIPAL AIRPORT-ROBERTS FIELD
RUNWAY 11-29 PAVEMENT REHABILITATIONAIP 3-41-0052-42-2016
2143.054
REDMOND OREGONCONSTRUCTION
SAFETY AND PHASINGPLAN (CSPP) PHASE 1
6
CP-3
AJG
CRK
TFO
6-28-2017
FINAL6-28-2017
TFO6-19-2017
SCALE IN
0200 200 400100
FEET
NOTES FOR COVERING OR DEACTIVATING LIGHTS.1. LIGHTS ON CLOSED PORTIONS OF PAVEMENT SHALL BE COVERED OR
DEACTIVATED DURING CONSTRUCTION. THE CONTRACTOR MAY CHOOSE FROMTHE OPTIONS BELOW TO MEET THIS REQUIREMENT.
1.1. DISCONNECT THE PORTION OF THE ELECTRICAL CIRCUIT THE LIGHTS ARELOCATED ON. REMAINING PORTIONS OF THE AIRFIELD SHALL REMAINOPERATIONAL.
1.2. DISCONNECT THE LIGHT FIXTURE TRANSFORMER FROM THE ELECTRICALCIRCUIT. CONTRACTOR SHALL ALSO FLAG THE LIGHTS TO INDICATE THATTHERE IS AN ACTIVE CIRCUIT IN THE CAN.
1.3. COVER THE LIGHT FIXTURE WITH A SECTION OF PVC PIPE TO PREVENT LIGHTFROM BEING EMITTED FROM THE FIXTURE.
2. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOT REQUIRE LIGHTDEACTIVATION OR COVERS.
NOTES FOR COVERING SIGNS1. SIGNS LEADING TO CLOSED PORTIONS OF PAVEMENT SHALL BE
COVERED. THIS CAN BE ACCOMPLISHED BY ONE OR ACOMBINATION OF THE FOLLOWING METHODS.
1.1. COVER SIGN WITH BLACK CANVAS, WITH STRAPS TO SECURETHE COVER TO THE SIGN.
1.2. REPLACE THE PANELS WITH BLANK SIGN PANELS.
1.3. REMOVE THE SIGN FROM THE CONCRETE FOUNDATION.
2. SIGNS DESIGNATED FOR REMOVAL ON THE PROJECT SHALL BECOVERED UNTIL THEY ARE REMOVED.
3. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOTREQUIRE SIGN COVERS.
LEGEND
PHASE 1 CONSTRUCTION AREA
PHASE 1A CONSTRUCTION AREA
OTHER ALLOWABLE AREAS OF WORK
LOW PROFILE BARRICADES
CONSTRUCTION BOUNDARY FENCE
AIRCRAFT TAXIROUTE
CONSTRUCTION HAUL ROUTE
FULL OR PARTIAL SIGN COVERS
>>
PHASE 1
1. PHASE 1 WORK AREA REQUIRES CLOSURE OF THEFOLLOWING PAVEMENT AREAS: RUNWAY 11-29, PORTIONSOF TAXIWAY'S 'C' AND 'G', TAXIWAY 'A', TAXIWAY 'D'.CLOSURE ACCOMPLISHED WITH NOTAM, BARRICADES, SIGNCOVERS, AND DEACTIVATED LIGHTS TO CLOSED PAVEMENTAREAS AS INDICATED.
2. WITHIN PHASE 1 THERE ARE REQUIRED PORTIONS OF WORKTO BE COMPLETED PRIOR TO STARTING OTHER PHASES OFWORK. SEE PHASE 1A NOTES.
3. THE PHASE 1 AREA MAY BE CONSTRUCTEDSIMULTANEOUSLY WITH THE PHASE 2-5 AREAS , HOWEVERCONSTRUCTION EFFORTS IN PHASE 2-5 WORK AREA SHALLTAKE PRECEDENT TO MINIMIZE THE DURATION OF THECLOSURES REQUIRED FOR TAXIWAYS ADJACENT TO PHASE 1WORK AREA.
4. THE CONTRACTOR IS ALERTED THAT TEMPORARYELECTRICAL CIRCUITS MAY BE REQUIRED FOR PORTIONS OFTHE WORK. THE REQUIRED TEMPORARY CIRCUITS ARE NOTSHOWN. THE CONTRACTOR IS ALERTED TO REVIEW THE THEELECTRICAL CIRCUITS FOR ROUTING OF TEMPORARYCIRCUITS. TEMPORARY CIRCUITS ARE INCIDENTAL TOOTHER BID ITEMS.
5. TEMPORARY SHORT TERM CLOSURE OF TAXIWAY 'C' & 'G'ARE PERMITTED DURING PHASE 1 TO ALLOW FOR THEREQUIRED MILLING OPERATIONS FOR PHASE 3 & 4 .HOWEVER, THE SEQUENCE OF THE MILLING OPERATIONSHALL ALLOW AIRCRAFT ACCESS TO APRON PARKINGAREAS AT ALL TIMES. CLOSURE SHALL NOT BESIMULTANEOUS AND PAVEMENT SHALL BE USABLE ON FORAIRCRAFT ON TAXIWAY 'A' .
PHASE 1A NOTES
1. THE WORK IN THE PHASE 1A AREA IS REQUIRED TO BECOMPLETED TO THE EXTENT THAT IT IS AVAILABLE FORTAXIING AIRCRAFT PRIOR TO STARTING WORK ON THEPHASE 3 AND PHASE 4 WORK. THIS AREA IS REQUIRED FORAIRCRAFT TAXIING DURING PHASE 3 AND PHASE 4.
2. THE LEVEL OF COMPLETION ON THE PHASE 1A WORK ISDEPENDENT ON THE CONTRACTORS PROPOSED CLOSURESFOR THE PHASE 3 & 4 WORK.
3. IF THE CONTRACTOR ELECTS DAYTIME ONLY CLOSURESFOR THE PHASE 3 & 4 WORK THEN THE FOLLOWING ISREQUIRED TO BE COMPLETED IN THE PHASE 1A AREA:
· All PAVING COMPLETED· CENTERLINE MARKINGS PLACED· ALL SIGNS INSTALLED, BUT NOT LIGHTED.· GRADES WITHIN THE SAFETY AREA CONFORM TO THE
TYPICAL SECTION·· TOP DRESSING NOT REQUIRED PROVIDED THERE
ARE NO LIPS OVER 3 ".· NO TRENCHES OR DROPS OVER 3" WITHIN THE SAFETY
AREA
4. IF THE CONTRACTOR ELECTS DAYTIME AND NIGHTIMECLOSURES PHASE 3 & 4 WORK THEN THE FOLLOWING ISREQUIRED TO BE COMPLETED IN THE PHASE 1A AREA:
· All PAVING COMPLETED· GRADES WITHIN THE SAFETY AREA CONFORM TO THE
TYPICAL SECTION·· TOP DRESSING NOT REQUIRED PROVIDED THERE
ARE NO LIPS OVER 3 ".· NO TRENCHES OR DROPS OVER 3" WITHIN THE SAFETY
AREA· TAXIWAY CENTERLINE MARKING COMPLETED· TAXIWAY EDGE LIGHTS COMPLETED.· AIRFIELD SIGNS COMPLETED.
SDSD
SD
SDSD
SD
SD
SD
2W2W
2W
SD
SD
SD
SD
SD
SD
SDSD
SDSD
SD
SDSD
SD
SDSD
SD
SD
SD
2W2W
2W
SD
SD
SD
SD
SD
SD
SDSD
SDSD
SD
>>
>> >>
>>
>>
CONTRACTOR ACCESS PHASE 2
NEW TAXIWAY 'D'
TAXI
WAY
'F'
RUNW
AY 5
-23
TAXIWAY 'C'
RUNWAY 11-29
TAXI
WAY
'D'
NO
RTH
TAXI
WAY
'A'
NO
RTH
TAXI
WAY
'A'
SOU
TH
RUNWAY 11-29
TAXIWAY 'G'
TAXI
WAY
'D'
SOU
TH
STAGING AREA PHASE 2
93.0
0'
93.00'
93.0
0'
93'
59.0
0'59
.00'
59.00'
250.00'
250.00'
250.00'
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
TAXIWAY 'C'
TAXIWAY 'G'
DEACTIVATE LIGHTSON TAXIWAY 'C'SOUTH OF RUNWAY5-23.
DEACTIVATE LIGHTSON TAXIWAY 'G'SOUTH OF RUNWAY5-23.
DEACTIVATE LIGHTSON TAXIWAY 'C & A' INCLOSED AREA.
DEACTIVATE LIGHTSON TAXIWAY 'G & 'A' &TAXILANE IN CLOSEDAREA.
DEACTIVATE LIGHTSON TAXIWAY 'D INCLOSED AREA.
SIGN COVER. TYP.
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADESLOW PROFILE
LIGHTED BARRICADES
LIGHTED RUNWAYCLOSURE 'X'
PLACE ON RUNWAY29 NUMBERS.
LIGHTED RUNWAYCLOSURE 'X'
PLACE ON RUNWAY 11NUMBERS.
HANGAR AREACLOSED.
>> >> >> >> >> >>
AIRCRAFT TAXI ROUTE.COORDINGATE WITH AIRPORT TOBLOCK OFF AIRCRAFT PARKINGAREAS WITHIN 93' OF TAXI ROUTE.
>> >> >>
>>
>>>>
>> >>
>> >> >> >> >> >>
2017COPYRIGHT © MORRISON-MAIERLE, INC.,
SHEET NUMBER
PROJECT NUMBER
DRAWING NUMBER
VERIFY SCALE!
THESE PRINTS MAY BEREDUCED. LINE BELOW
MEASURES ONE INCH ONORIGINAL DRAWING.
MODIFY SCALE ACCORDINGLY!
DATEDESCRIPTIONNO. BY
R:\2143\2143 AIP 40\054-RW 11-29 DESIGN\ACAD\SHEETS\7 CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) PHASE 2.DWG PLOTTED BY:CORY R. KESLER ON Jun/29/2017
REVISIONS DRAWN BY:
DSGN. BY:
APPR. BY:
DATE:
Q.C. REVIEW
DATE:BY:
1 Engineering PlaceHelena, MT 59602
Phone: 406.442.3050Fax: 406.442.7862
engineers surveyors planners scientists
MorrisonMaierleREDMOND MUNICIPAL AIRPORT-ROBERTS FIELD
RUNWAY 11-29 PAVEMENT REHABILITATIONAIP 3-41-0052-42-2016
2143.054
REDMOND OREGONCONSTRUCTION
SAFETY AND PHASINGPLAN (CSPP) PHASE 2
7
CP-4
AJG
CRK
TFO
6-28-2017
FINAL6-28-2017
TFO6-19-2017
SCALE IN
0200 200 400100
FEET
NOTES FOR COVERING OR DEACTIVATING LIGHTS.1. LIGHTS ON CLOSED PORTIONS OF PAVEMENT SHALL BE COVERED OR
DEACTIVATED DURING CONSTRUCTION. THE CONTRACTOR MAY CHOOSE FROMTHE OPTIONS BELOW TO MEET THIS REQUIREMENT.
1.1. DISCONNECT THE PORTION OF THE ELECTRICAL CIRCUIT THE LIGHTS ARELOCATED ON. REMAINING PORTIONS OF THE AIRFIELD SHALL REMAINOPERATIONAL.
1.2. DISCONNECT THE LIGHT FIXTURE TRANSFORMER FROM THE ELECTRICALCIRCUIT. CONTRACTOR SHALL ALSO FLAG THE LIGHTS TO INDICATE THATTHERE IS AN ACTIVE CIRCUIT IN THE CAN.
1.3. COVER THE LIGHT FIXTURE WITH A SECTION OF PVC PIPE TO PREVENT LIGHTFROM BEING EMITTED FROM THE FIXTURE.
2. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOT REQUIRE LIGHTDEACTIVATION OR COVERS.
NOTES FOR COVERING SIGNS1. SIGNS LEADING TO CLOSED PORTIONS OF PAVEMENT SHALL BE
COVERED. THIS CAN BE ACCOMPLISHED BY ONE OR ACOMBINATION OF THE FOLLOWING METHODS.
1.1. COVER SIGN WITH BLACK CANVAS, WITH STRAPS TO SECURETHE COVER TO THE SIGN.
1.2. REPLACE THE PANELS WITH BLANK SIGN PANELS.
1.3. REMOVE THE SIGN FROM THE CONCRETE FOUNDATION.
2. SIGNS DESIGNATED FOR REMOVAL ON THE PROJECT SHALL BECOVERED UNTIL THEY ARE REMOVED.
3. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOTREQUIRE SIGN COVERS.
LEGEND
PHASE 2 CONSTRUCTION AREA
OTHER ALLOWABLE AREAS OF WORK
LOW PROFILE BARRICADES
CONSTRUCTION BOUNDARY FENCE
AIRCRAFT TAXIROUTE
CONSTRUCTION HAUL ROUTE
FULL OR PARTIAL SIGN COVERS
>>
PHASE 2 REQUIREMENTS.
1. COORDINATE WITH THE AIRPORT TO NOTIFY HANGAR OWNERS OF CLOSURE OF ACCESS 30 DAYS INADVANCE OF CLOSURE.
2. PHASE 2 WORK AREA REQUIRES CLOSURE OF THE FOLLOWING PAVEMENT AREAS: RUNWAY 11/29,PORTIONS OF TAXIWAY 'C', TAXIWAY 'G', TAXIWAY 'D', AND THE TAXILANE TO THE HANGARS. CLOSUREACCOMPLISHED WITH NOTAM, BARRICADES, SIGN COVERS, AND DEACTIVATED LIGHTS TO CLOSEDPAVEMENT AREAS AS INDICATED.
3. THE PHASE 2 AREA MAY BE CONSTRUCTED SIMULTANEOUSLY WITH THE PHASE 1 AREA WITHIN THEINDICATED CONSTRUCTION BOUNDARY, HOWEVER CONSTRUCTION EFFORTS IN PHASE 2 WORK AREASHALL TAKE PRECEDENT TO MINIMIZE THE DURATION OF THE CLOSURES REQUIRED.
4. THE START OF THE PHASE 2 CONSTRUCTION SHALL BE COORDINATED WITH THE PHASE 1CONSTRUCTION TO ALLOW FOR PAVING OPERATIONS ON PHASE 1 AND 2 TO OCCUR SEQUENTIALLY.
5. THE CONTRACTOR IS ALERTED THAT TEMPORARY ELECTRICAL CIRCUITS MAY BE REQUIRED FORPORTIONS OF THE WORK. THE REQUIRED TEMPORARY CIRCUITS ARE NOT SHOWN. THE CONTRACTORIS ALERTED TO REVIEW THE THE ELECTRICAL CIRCUITS FOR ROUTING OF TEMPORARY CIRCUITS.TEMPORARY CIRCUITS ARE INCIDENTAL TO OTHER BID ITEMS.
CONTRACTOR ACCESS PHASE 1
SDSD
SD
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSD
SDSD
SD
SDSD
SD
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSD
SDSD
SD
STAGING AREA PHASE 3
93.0
0'
93.00'
93.0
0'
59.0
0'59
.00'
59.00'
250.00'
250.00'
250.00'
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
DEACTIVATE LIGHTSON TAXIWAY 'C'SOUTH OF RUNWAY5-23.
DEACTIVATE LIGHTSON TAXIWAY 'G'SOUTH OF RUNWAY5-23.
DEACTIVATE LIGHTSON TAXIWAY 'D INCLOSED AREA.
SIGN COVER. TYP.
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LIGHTED RUNWAYCLOSURE 'X'
PLACE ON RUNWAY29 NUMBERS.
LIGHTED RUNWAYCLOSURE 'X'PLACE ON RUNWAY 11NUMBERS.
LOW PROFILELIGHTED BARRICADES
>>>>>>>>>>>>>>>>
>>>>
>>>>
>>
>> >> >> >>
LOW PROFILELIGHTED BARRICADES
CONSTRUCTION TRAFFIC CROSSESACTIVE PAVEMENT AREA.CONTRACTOR TO PROVIDE RADIOGUARD TO CLEAR CONSTRUCTIONTRAFFIC ACROSS PAVEMENT.
CONSTRUCTION TRAFFIC TO HOLDSHORT AT CONSTRUCTION BOUNDARYON EACH SIDE FOR CLEARANCE FROMRADIO GUARD.
CONTRACTOR TO HAVE POWEREDBROOM TO CLEAN FOD OFF OFPAVEMENT ON A CONTINUOUS BASIS.
>>
>>>>
>>
TAXIWAY 'D'
TAXI
WAY
'F'
RUNW
AY 5
-23
TAXIWAY 'C'
RUNWAY 11-29
TAXI
WAY
'D'
NO
RTH
TAXI
WAY
'A'
NO
RTH
TAXI
WAY
'A'
SOU
TH
RUNWAY 11-29
TAXIWAY 'G'
TAXI
WAY
'D'
SOU
TH
TAXIWAY 'C'TAXIWAY 'C'
TAXIWAY 'G'
GATE ACCESS PHASE 1
EMPLOYEE PARKING PHASE 1
2017COPYRIGHT © MORRISON-MAIERLE, INC.,
SHEET NUMBER
PROJECT NUMBER
DRAWING NUMBER
VERIFY SCALE!
THESE PRINTS MAY BEREDUCED. LINE BELOW
MEASURES ONE INCH ONORIGINAL DRAWING.
MODIFY SCALE ACCORDINGLY!
DATEDESCRIPTIONNO. BY
R:\2143\2143 AIP 40\054-RW 11-29 DESIGN\ACAD\SHEETS\8 CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) PHASE 3.DWG PLOTTED BY:CORY R. KESLER ON Jun/29/2017
REVISIONS DRAWN BY:
DSGN. BY:
APPR. BY:
DATE:
Q.C. REVIEW
DATE:BY:
1 Engineering PlaceHelena, MT 59602
Phone: 406.442.3050Fax: 406.442.7862
engineers surveyors planners scientists
MorrisonMaierleREDMOND MUNICIPAL AIRPORT-ROBERTS FIELD
RUNWAY 11-29 PAVEMENT REHABILITATIONAIP 3-41-0052-42-2016
2143.054
REDMOND OREGONCONSTRUCTION
SAFETY AND PHASINGPLAN (CSPP) PHASE 3
8
CP-5
AJG
CRK
TFO
6-28-2017
FINAL6-28-2017
TFO6-19-2017
SCALE IN
0200 200 400100
FEET
NOTES FOR COVERING OR DEACTIVATING LIGHTS.1. LIGHTS ON CLOSED PORTIONS OF PAVEMENT SHALL BE COVERED OR
DEACTIVATED DURING CONSTRUCTION. THE CONTRACTOR MAY CHOOSE FROMTHE OPTIONS BELOW TO MEET THIS REQUIREMENT.
1.1. DISCONNECT THE PORTION OF THE ELECTRICAL CIRCUIT THE LIGHTS ARELOCATED ON. REMAINING PORTIONS OF THE AIRFIELD SHALL REMAINOPERATIONAL.
1.2. DISCONNECT THE LIGHT FIXTURE TRANSFORMER FROM THE ELECTRICALCIRCUIT. CONTRACTOR SHALL ALSO FLAG THE LIGHTS TO INDICATE THATTHERE IS AN ACTIVE CIRCUIT IN THE CAN.
1.3. COVER THE LIGHT FIXTURE WITH A SECTION OF PVC PIPE TO PREVENT LIGHTFROM BEING EMITTED FROM THE FIXTURE.
2. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOT REQUIRE LIGHTDEACTIVATION OR COVERS.
NOTES FOR COVERING SIGNS1. SIGNS LEADING TO CLOSED PORTIONS OF PAVEMENT SHALL BE
COVERED. THIS CAN BE ACCOMPLISHED BY ONE OR ACOMBINATION OF THE FOLLOWING METHODS.
1.1. COVER SIGN WITH BLACK CANVAS, WITH STRAPS TO SECURETHE COVER TO THE SIGN.
1.2. REPLACE THE PANELS WITH BLANK SIGN PANELS.
1.3. REMOVE THE SIGN FROM THE CONCRETE FOUNDATION.
2. SIGNS DESIGNATED FOR REMOVAL ON THE PROJECT SHALL BECOVERED UNTIL THEY ARE REMOVED.
3. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOTREQUIRE SIGN COVERS.
LEGEND
PHASE 3 CONSTRUCTION AREA
OTHER ALLOWABLE AREAS OF WORK
LOW PROFILE BARRICADES
CONSTRUCTION BOUNDARY FENCE
AIRCRAFT TAXIROUTE
CONSTRUCTION HAUL ROUTE
FULL OR PARTIAL SIGN COVERS
>>
PHASE 3 ADDITIONAL REQUIREMENTS
1. PHASE 3 CLOSURE SHALL BE LIMITED TO DAYTIME ONLY TO COMPLETE THE WORK ADJACENT TOTAXIWAY 'C'.
2. TAXIWAY 'A' AND TAXIWAY 'G' SHALL BE AVAILABLE FOR TAXI OPERATIONS PRIOR TO CLOSING THEPHASE 3 AREA.
3. PHASE 2 SHALL BE COMPLETED PRIOR TO STARTING PHASE 3 CONSTRUCTION, WITH EXCEPTION OFTHE ALLOWABLE REMOVALS THAT MAY BE PERFORMED DURING THE PHASE 1 WORK.
4. PHASE 3 WORK AREA REQUIRES CLOSURE OF THE FOLLOWING PAVEMENT AREAS: RUNWAY 11-29,PORTIONS OF TAXIWAY 'C', AND TAXIWAY 'D' . CLOSURE ACCOMPLISHED WITH NOTAM, BARRICADES,SIGN COVERS, AND DEACTIVATED LIGHTS TO CLOSED PAVEMENT AREAS AS INDICATED.
5. THE PHASE 3 AREA MAY BE CONSTRUCTED SIMULTANEOUSLY WITH THE PHASE 1 AREA WITHIN THEINDICATED CONSTRUCTION BOUNDARY, HOWEVER CONSTRUCTION EFFORTS IN PHASE 3 WORK AREASHALL TAKE PRECEDENT TO MINIMIZE THE DURATION OF THE CLOSURES REQUIRED.
6. THE CONTRACTOR IS ALERTED THAT TEMPORARY ELECTRICAL CIRCUITS MAY BE REQUIRED FORPORTIONS OF THE WORK. THE REQUIRED TEMPORARY CIRCUITS ARE NOT SHOWN. THE CONTRACTORIS ALERTED TO REVIEW THE THE ELECTRICAL CIRCUITS FOR ROUTING OF TEMPORARY CIRCUITS.TEMPORARY CIRCUITS ARE INCIDENTAL TO OTHER BID ITEMS.
SDSD
SD
SDSD
SD
SD
SD
2W2W
2W
SD
SD
SD
SD
SD
SD
SDSD
SDSD
SD
SDSD
SD
SDSD
SD
SD
SD
2W2W
2W
SD
SD
SD
SD
SD
SD
SDSD
SDSD
SD
>>
>>>>
>>>>
>>
>> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >>
CONTRACTOR ACCESS PHASE 1
NEW TAXIWAY 'D'
TAXI
WAY
'F'
RUNW
AY 5
-23
TAXIWAY 'C'
RUNWAY 11-29
TAXI
WAY
'D'
NO
RTH
TAXI
WAY
'A'
NO
RTH
TAXI
WAY
'A'
SOU
TH
RUNWAY 11-29
TAXIWAY 'G'
TAXI
WAY
'D'
SOU
TH
TAXIWAY 'C'
STAGING AREA PHASE 1
93.0
0'
93.00'
93.0
0'
59.0
0'59
.00'
59.00'
250.00'
250.00'
250.00'
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
TAXIWAY 'C'
TAXIWAY 'G'
DEACTIVATE LIGHTSON TAXIWAY 'C'SOUTH OF RUNWAY5-23.
DEACTIVATE LIGHTSON TAXIWAY 'G'SOUTH OF RUNWAY5-23.
DEACTIVATE LIGHTSON TAXIWAY 'D INCLOSED AREA.
SIGN COVER. TYP.
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LIGHTED RUNWAYCLOSURE 'X'
PLACE ON RUNWAY29 NUMBERS.
LIGHTED RUNWAYCLOSURE 'X'PLACE ON RUNWAY 11NUMBERS.
LOW PROFILELIGHTED BARRICADES
CONSTRUCTION TRAFFIC CROSSESACTIVE PAVEMENT AREA.
CONTRACTOR TO PROVIDE RADIOGUARD TO CLEAR CONSTRUCTION
TRAFFIC ACROSS PAVEMENT.
CONSTRUCTION TRAFFIC TO HOLDSHORT AT CONSTRUCTION BOUNDARYON EACH SIDE FOR CLEARANCE FROM
RADIO GUARD.
CONTRACTOR TO HAVE POWEREDBROOM TO CLEAN FOD OFF OF
PAVEMENT ON A CONTINUOUS BASIS.
LOW PROFILELIGHTED BARRICADES
>>>>
>>
2017COPYRIGHT © MORRISON-MAIERLE, INC.,
SHEET NUMBER
PROJECT NUMBER
DRAWING NUMBER
VERIFY SCALE!
THESE PRINTS MAY BEREDUCED. LINE BELOW
MEASURES ONE INCH ONORIGINAL DRAWING.
MODIFY SCALE ACCORDINGLY!
DATEDESCRIPTIONNO. BY
R:\2143\2143 AIP 40\054-RW 11-29 DESIGN\ACAD\SHEETS\9 CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) PHASE 4.DWG PLOTTED BY:CORY R. KESLER ON Jun/29/2017
REVISIONS DRAWN BY:
DSGN. BY:
APPR. BY:
DATE:
Q.C. REVIEW
DATE:BY:
1 Engineering PlaceHelena, MT 59602
Phone: 406.442.3050Fax: 406.442.7862
engineers surveyors planners scientists
MorrisonMaierleREDMOND MUNICIPAL AIRPORT-ROBERTS FIELD
RUNWAY 11-29 PAVEMENT REHABILITATIONAIP 3-41-0052-42-2016
2143.054
REDMOND OREGONCONSTRUCTION
SAFETY AND PHASINGPLAN (CSPP) PHASE 4
9
CP-6
AJG
CRK
TFO
6-28-2017
FINAL6-28-2017
TFO6-19-2017
SCALE IN
0200 200 400100
FEET
NOTES FOR COVERING OR DEACTIVATING LIGHTS.1. LIGHTS ON CLOSED PORTIONS OF PAVEMENT SHALL BE COVERED OR
DEACTIVATED DURING CONSTRUCTION. THE CONTRACTOR MAY CHOOSE FROMTHE OPTIONS BELOW TO MEET THIS REQUIREMENT.
1.1. DISCONNECT THE PORTION OF THE ELECTRICAL CIRCUIT THE LIGHTS ARELOCATED ON. REMAINING PORTIONS OF THE AIRFIELD SHALL REMAINOPERATIONAL.
1.2. DISCONNECT THE LIGHT FIXTURE TRANSFORMER FROM THE ELECTRICALCIRCUIT. CONTRACTOR SHALL ALSO FLAG THE LIGHTS TO INDICATE THATTHERE IS AN ACTIVE CIRCUIT IN THE CAN.
1.3. COVER THE LIGHT FIXTURE WITH A SECTION OF PVC PIPE TO PREVENT LIGHTFROM BEING EMITTED FROM THE FIXTURE.
2. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOT REQUIRE LIGHTDEACTIVATION OR COVERS.
NOTES FOR COVERING SIGNS1. SIGNS LEADING TO CLOSED PORTIONS OF PAVEMENT SHALL BE
COVERED. THIS CAN BE ACCOMPLISHED BY ONE OR ACOMBINATION OF THE FOLLOWING METHODS.
1.1. COVER SIGN WITH BLACK CANVAS, WITH STRAPS TO SECURETHE COVER TO THE SIGN.
1.2. REPLACE THE PANELS WITH BLANK SIGN PANELS.
1.3. REMOVE THE SIGN FROM THE CONCRETE FOUNDATION.
2. SIGNS DESIGNATED FOR REMOVAL ON THE PROJECT SHALL BECOVERED UNTIL THEY ARE REMOVED.
3. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOTREQUIRE SIGN COVERS.
LEGEND
PHASE 4 CONSTRUCTION AREA
OTHER ALLOWABLE PHASES OF WORK
LOW PROFILE BARRICADES
CONSTRUCTION BOUNDARY FENCE
AIRCRAFT TAXIROUTE
CONSTRUCTION HAUL ROUTE
FULL OR PARTIAL SIGN COVERS
>>
PHASE 4 ADDITIONAL REQUIREMENTS
1. PHASE 4 CLOSURE SHALL BE LIMITED TO DAYTIME ONLY TO COMPLETE THE WORK ADJACENT TOTAXIWAY 'G'.
2. TAXIWAY 'A' AND TAXIWAY 'C' SHALL BE AVAILABLE FOR TAXI OPERATIONS PRIOR TO CLOSING THEPHASE 4 AREA.
3. PHASE 2 SHALL BE COMPLETED PRIOR TO PHASE 4 CONSTRUCTION OPERATIONS, WITH EXCEPTION OFTHE ALLOWABLE REMOVALS THAT MAY BE PERFORMED DURING THE PHASE 1 WORK.
4. PHASE 4 WORK AREA REQUIRES CLOSURE OF THE FOLLOWING PAVEMENT AREAS: RUNWAY 11/29,PORTIONS OF TAXIWAY 'G', TAXIWAY 'D', CLOSURE ACCOMPLISHED WITH NOTAM, BARRICADES, SIGNCOVERS, AND DEACTIVATED LIGHTS TO CLOSED PAVEMENT AREAS AS INDICATED.
5. THE PHASE 4 AREA MAY BE CONSTRUCTED SIMULTANEOUSLY WITH THE PHASE 1 AREA WITHIN THEINDICATED CONSTRUCTION BOUNDARY, HOWEVER CONSTRUCTION EFFORTS IN PHASE 4 WORK AREASHALL TAKE PRECEDENT TO MINIMIZE THE DURATION OF THE CLOSURES REQUIRED.
6. THE CONTRACTOR IS ALERTED THAT TEMPORARY ELECTRICAL CIRCUITS MAY BE REQUIRED FORPORTIONS OF THE WORK. THE REQUIRED TEMPORARY CIRCUITS ARE NOT SHOWN. THE CONTRACTORIS ALERTED TO REVIEW THE THE ELECTRICAL CIRCUITS FOR ROUTING OF TEMPORARY CIRCUITS.TEMPORARY CIRCUITS ARE INCIDENTAL TO OTHER BID ITEMS.
CONTRACTOR ACCESS PHASE 1
SDSD
SD
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSD
SDSD
SD
SDSD
SD
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSD
SDSD
SD
TAXIWAY 'D'
TAXI
WAY
'F'
RUNW
AY 5
-23
TAXIWAY 'C'
RUNWAY 11-29
TAXI
WAY
'D'
NO
RTH
TAXI
WAY
'A'
NO
RTH
TAXI
WAY
'A'
SOU
TH
RUNWAY 11-29
TAXIWAY 'G'
TAXI
WAY
'D'
SOU
TH
TAXIWAY 'C'
93.0
0'
93.0
0'
59.0
0'59
.00'
250.00'
250.00'
250.00'
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
TAXIWAY 'C'
TAXIWAY 'G'
DEACTIVATE LIGHTSON TAXIWAY 'C'SOUTH OF RUNWAY5-23.
DEACTIVATE LIGHTSON TAXIWAY 'G'SOUTH OF RUNWAY5-23.
DEACTIVATE LIGHTSON TAXIWAY 'D INCLOSED AREA.
SIGN COVER. TYP.
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LIGHTED RUNWAYCLOSURE 'X'
PLACE ON RUNWAY29 NUMBERS.
LIGHTED RUNWAYCLOSURE 'X'
PLACE ON RUNWAY 11NUMBERS.
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
250.00'MIN.
59.0
0'
>>>>
>>
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
>>>>
>>>>
>>
>> >> >> >> >> >> >> >> >> >> >> >>
>>>>
>>
>>>>
>>>>
>>
SPECIAL OPERATIONS AREAS.SEE NOTES.
CONSTRUCTION TRAFFIC CROSSESACTIVE PAVEMENT AREA.
CONTRACTOR TO PROVIDE RADIOGUARD TO CLEAR CONSTRUCTION
TRAFFIC ACROSS PAVEMENT.
CONSTRUCTION TRAFFIC TO HOLDSHORT AT CONSTRUCTION BOUNDARYON EACH SIDE FOR CLEARANCE FROM
RADIO GUARD.
CONTRACTOR TO HAVE POWEREDBROOM TO CLEAN FOD OFF OF
PAVEMENT ON A CONTINUOUS BASIS.
SPECIALOPERATIONS AREAS.SEE NOTES.
SPECIALOPERATIONS AREAS.
SEE NOTES.
2017COPYRIGHT © MORRISON-MAIERLE, INC.,
SHEET NUMBER
PROJECT NUMBER
DRAWING NUMBER
VERIFY SCALE!
THESE PRINTS MAY BEREDUCED. LINE BELOW
MEASURES ONE INCH ONORIGINAL DRAWING.
MODIFY SCALE ACCORDINGLY!
DATEDESCRIPTIONNO. BY
R:\2143\2143 AIP 40\054-RW 11-29 DESIGN\ACAD\SHEETS\10 CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) PHASE 5.DWG PLOTTED BY:CORY R. KESLER ON Jun/29/2017
REVISIONS DRAWN BY:
DSGN. BY:
APPR. BY:
DATE:
Q.C. REVIEW
DATE:BY:
1 Engineering PlaceHelena, MT 59602
Phone: 406.442.3050Fax: 406.442.7862
engineers surveyors planners scientists
MorrisonMaierleREDMOND MUNICIPAL AIRPORT-ROBERTS FIELD
RUNWAY 11-29 PAVEMENT REHABILITATIONAIP 3-41-0052-42-2016
2143.054
REDMOND OREGON
CONSTRUCTION SAFETY AND PHASING PLAN (CSPP)PHASE 5
10
CP-7
AJG
CRK
TFO
6-28-2017
FINAL6-28-2017
TFO6-19-2017
SCALE IN
0200 200 400100
FEET
NOTES FOR COVERING OR DEACTIVATING LIGHTS.1. LIGHTS ON CLOSED PORTIONS OF PAVEMENT SHALL BE COVERED OR
DEACTIVATED DURING CONSTRUCTION. THE CONTRACTOR MAY CHOOSE FROMTHE OPTIONS BELOW TO MEET THIS REQUIREMENT.
1.1. DISCONNECT THE PORTION OF THE ELECTRICAL CIRCUIT THE LIGHTS ARELOCATED ON. REMAINING PORTIONS OF THE AIRFIELD SHALL REMAINOPERATIONAL.
1.2. DISCONNECT THE LIGHT FIXTURE TRANSFORMER FROM THE ELECTRICALCIRCUIT. CONTRACTOR SHALL ALSO FLAG THE LIGHTS TO INDICATE THATTHERE IS AN ACTIVE CIRCUIT IN THE CAN.
1.3. COVER THE LIGHT FIXTURE WITH A SECTION OF PVC PIPE TO PREVENT LIGHTFROM BEING EMITTED FROM THE FIXTURE.
2. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOT REQUIRE LIGHTDEACTIVATION OR COVERS.
NOTES FOR COVERING SIGNS1. SIGNS LEADING TO CLOSED PORTIONS OF PAVEMENT SHALL BE
COVERED. THIS CAN BE ACCOMPLISHED BY ONE OR ACOMBINATION OF THE FOLLOWING METHODS.
1.1. COVER SIGN WITH BLACK CANVAS, WITH STRAPS TO SECURETHE COVER TO THE SIGN.
1.2. REPLACE THE PANELS WITH BLANK SIGN PANELS.
1.3. REMOVE THE SIGN FROM THE CONCRETE FOUNDATION.
2. SIGNS DESIGNATED FOR REMOVAL ON THE PROJECT SHALL BECOVERED UNTIL THEY ARE REMOVED.
3. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOTREQUIRE SIGN COVERS.
LEGEND
PHASE 5 CONSTRUCTION AREA
PHASE 5 SPECIAL OPERATIONS AREA
LOW PROFILE BARRICADES
CONSTRUCTION BOUNDARY FENCE
AIRCRAFT TAXIROUTE
CONSTRUCTION HAUL ROUTE
FULL OR PARTIAL SIGN COVERS
>>
PHASE 5 ADDITIONAL REQUIREMENTS
1. PHASE 5 CLOSURE SHALL BE LIMITED TO DAYTIME ONLY TO COMPLETE THE WORK ADJACENT TOTAXIWAY 'F'. THE WORK IN THIS AREA IS LIMITED TO TAXIWAY SIGN AND MARKING MODIFICATIONS.
2. TAXIWAY 'G' AND TAXIWAY 'C' SHALL BE AVAILABLE FOR TAXI OPERATIONS PRIOR TO CLOSING THEPHASE 5 AREA.
3. PHASE 5 WORK AREA REQUIRES CLOSURE OF THE FOLLOWING PAVEMENT AREAS: RUNWAY 11/29,PORTIONS OF TAXIWAY 'C', TAXIWAY 'G', TAXIWAY 'D', TAXIWAY 'F'. CLOSURE ACCOMPLISHED WITHNOTAM, BARRICADES, SIGN COVERS, AND DEACTIVATED LIGHTS TO CLOSED PAVEMENT AREAS ASINDICATED.
4. THE PHASE 5 AREA MAY BE CONSTRUCTED SIMULTANEOUSLY WITH THE PHASE 1 AREA WITHIN THEINDICATED CONSTRUCTION BOUNDARY, HOWEVER CONSTRUCTION EFFORTS IN PHASE 5 WORK AREASHALL TAKE PRECEDENT TO MINIMIZE THE DURATION OF THE CLOSURES REQUIRED.
5. THE CONTRACTOR IS ALERTED THAT TEMPORARY ELECTRICAL CIRCUITS MAY BE REQUIRED FORPORTIONS OF THE WORK. THE REQUIRED TEMPORARY CIRCUITS ARE NOT SHOWN. THE CONTRACTORIS ALERTED TO REVIEW THE THE ELECTRICAL CIRCUITS FOR ROUTING OF TEMPORARY CIRCUITS.TEMPORARY CIRCUITS ARE INCIDENTAL TO OTHER BID ITEMS.
6. PHASE 5 REQUIRES LIMITED PORTIONS OF WORK OUTSIDE OF THE DESIGNATED CONSTRUCTIONBOUNDARY. SEE NOTES FOR SPECIAL WORK AREAS.
PHASE 5 SPECIAL OPERATIONS AREA NOTES
1. THE PHASE 5 SPECIAL WORK AREAS ARE OUTSIDE OF THE DELINEATED CONSTRUCTION BOUNDARYFOR PHASE 5 AND REQUIRE OWNER ESCORT. THE REQUIRED WORK IN THESE AREAS AREMODIFICATIONS OR RE-STRIPING OF EXISTING PAINT MARKINGS.
2. THE PROPOSED WORK WILL REQUIRE CONSTRUCTION OPERATIONS WITHIN ACTIVE TAXIWAY OBJECTFREE AREAS. THE CONTRACTOR SHALL MOVE OUTSIDE OF THE TAXIWAY OBJECT FREE AREA WHENDIRECTED BY THE OWNER OR ENGINEER.
3. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER FOR A SCHEDULED TIME FORCONSTRUCTION IN THESE AREAS.
4. THE OWNER MAY REQUIRE ADDITIONAL BARRICADE PLACEMENT OVER WHAT IS SHOWN FOR WORK IN
THESE AREAS.
SDSD
SDSD
SDSD
SD
SD
SD
SD
SD
SD SD
SD
SDSD
SDSD
SDSD
SD
SD
SD
SD
SD
SD SD
SD
TAXIWAY 'D'
TAXI
WAY
'F'
RUNW
AY 5
-23
TAXIWAY 'C'
RUNWAY 11-29 RUNWAY 11-29
TAXIWAY 'G' TAXIWAY 'G'
TAXIWAY 'C'
STAGING AREA PHASE 6ASPHALT PLANT YARD
(OPTIONAL TOCONTRACTOR) - ALL
PHASES
59.00'
250.00'
250.00'
250.00'
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
LOW PROFILELIGHTED BARRICADES
DEACTIVATE LIGHTSON TAXIWAY 'C'SOUTH OF RUNWAY5-23.
DEACTIVATE LIGHTSON TAXIWAY 'G'SOUTH OF RUNWAY5-23.
SIGN COVER. TYP.
LOW PROFILELIGHTED BARRICADES
LIGHTED RUNWAYCLOSURE 'X'
PLACE ON RUNWAY29 NUMBERS.
LIGHTED RUNWAYCLOSURE 'X'
PLACE ON RUNWAY 11NUMBERS.
TAXI
WAY
'J'
NO
RTH
TAXI
WAY
'J'
SOU
TH
TAXI
WAY
'M'
NO
RTH
TAXI
WAY
'M'
SOU
TH
ACCESS AT GATE F-2
WASTE AREA FOR EXCESS EXCAVATION
MILLINGS WASTE AREA ALL PHASES.
PHASE 6A- SPECIALOPERATIONS AREAFOR STORM DRAINCONNECTION. SEENOTE.
PHASE 6B- SPECIAL OPERATIONSAREA FOR SIGNWORK. SEE NOTE.
PHASE 6B- SPECIAL OPERATIONSAREA FOR SIGNWORK. SEE NOTE.
2017COPYRIGHT © MORRISON-MAIERLE, INC.,
SHEET NUMBER
PROJECT NUMBER
DRAWING NUMBER
VERIFY SCALE!
THESE PRINTS MAY BEREDUCED. LINE BELOW
MEASURES ONE INCH ONORIGINAL DRAWING.
MODIFY SCALE ACCORDINGLY!
DATEDESCRIPTIONNO. BY
R:\2143\2143 AIP 40\054-RW 11-29 DESIGN\ACAD\SHEETS\11 CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) PHASE 6.DWG PLOTTED BY:CORY R. KESLER ON Jun/29/2017
REVISIONS DRAWN BY:
DSGN. BY:
APPR. BY:
DATE:
Q.C. REVIEW
DATE:BY:
1 Engineering PlaceHelena, MT 59602
Phone: 406.442.3050Fax: 406.442.7862
engineers surveyors planners scientists
MorrisonMaierleREDMOND MUNICIPAL AIRPORT-ROBERTS FIELD
RUNWAY 11-29 PAVEMENT REHABILITATIONAIP 3-41-0052-42-2016
2143.054
REDMOND OREGONCONSTRUCTION
SAFETY AND PHASINGPLAN (CSPP) PHASE 6
11
CP-8
AJG
CRK
TFO
6-28-2017
FINAL6-28-2017
TFO6-19-2017
SCALE IN
0200 200 400100
FEET
NOTES FOR COVERING OR DEACTIVATING LIGHTS.1. LIGHTS ON CLOSED PORTIONS OF PAVEMENT SHALL BE COVERED OR
DEACTIVATED DURING CONSTRUCTION. THE CONTRACTOR MAY CHOOSE FROMTHE OPTIONS BELOW TO MEET THIS REQUIREMENT.
1.1. DISCONNECT THE PORTION OF THE ELECTRICAL CIRCUIT THE LIGHTS ARELOCATED ON. REMAINING PORTIONS OF THE AIRFIELD SHALL REMAINOPERATIONAL.
1.2. DISCONNECT THE LIGHT FIXTURE TRANSFORMER FROM THE ELECTRICALCIRCUIT. CONTRACTOR SHALL ALSO FLAG THE LIGHTS TO INDICATE THATTHERE IS AN ACTIVE CIRCUIT IN THE CAN.
1.3. COVER THE LIGHT FIXTURE WITH A SECTION OF PVC PIPE TO PREVENT LIGHTFROM BEING EMITTED FROM THE FIXTURE.
2. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOT REQUIRE LIGHTDEACTIVATION OR COVERS.
NOTES FOR COVERING SIGNS1. SIGNS LEADING TO CLOSED PORTIONS OF PAVEMENT SHALL BE
COVERED. THIS CAN BE ACCOMPLISHED BY ONE OR ACOMBINATION OF THE FOLLOWING METHODS.
1.1. COVER SIGN WITH BLACK CANVAS, WITH STRAPS TO SECURETHE COVER TO THE SIGN.
1.2. REPLACE THE PANELS WITH BLANK SIGN PANELS.
1.3. REMOVE THE SIGN FROM THE CONCRETE FOUNDATION.
2. SIGNS DESIGNATED FOR REMOVAL ON THE PROJECT SHALL BECOVERED UNTIL THEY ARE REMOVED.
3. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOTREQUIRE SIGN COVERS.
LEGEND
PHASE 6 CONSTRUCTION AREA
PHASE 6A SPECIAL OPERATIONS AREA
PHASE 6B SPECIAL OPERATIONS AREA
LOW PROFILE BARRICADES
CONSTRUCTION BOUNDARY FENCE
AIRCRAFT TAXIROUTE
CONSTRUCTION HAUL ROUTE
FULL OR PARTIAL SIGN COVERS
>>
PHASE 6 REQUIREMENTS.
1. PHASE 6 WORK AREA REQUIRES CLOSURE OF THE FOLLOWING PAVEMENT AREAS: RUNWAY 11-29,PORTIONS OF TAXIWAY 'C' & 'G', TAXIWAY 'J', AND TAXIWAY 'M'. CLOSURE ACCOMPLISHED WITH NOTAM,BARRICADES, SIGN COVERS, AND DEACTIVATED LIGHTS TO CLOSED PAVEMENT AREAS AS INDICATED.
2. PHASE 6 WORK MAY BE CONSTRUCTED CONCURRENTLY WITH THE PHASE 1-5 WORK. HOWEVER, THESEQUENCE OF CONSTRUCTION SHALL MINIMIZE THE PHASE 1-5 CLOSURE DURATIONS.
3. CONTRACTOR IS NOT PERMITTED TO CROSS RUNWAY 5-23 WITH CONSTRUCTION EQUIPMENT ORVEHICLES.
4. THE CONTRACTOR IS ALERTED THAT TEMPORARY ELECTRICAL CIRCUITS MAY BE REQUIRED FORPORTIONS OF THE WORK. THE REQUIRED TEMPORARY CIRCUITS ARE NOT SHOWN. THE CONTRACTOR ISALERTED TO REVIEW THE THE ELECTRICAL CIRCUITS FOR ROUTING OF TEMPORARY CIRCUITS.TEMPORARY CIRCUITS ARE INCIDENTAL TO OTHER BID ITEMS.
NOTES FOR TEMPORARY PAVED ACCESS FOR AIRCRAFT
1. THE AIRPORT HAS COORDINATED WITH THE LOCAL FIXED BASE OPERATOR (FBO)TO PROVIDED AIRCRAFT TOWING SERVICES DURING THE CLOSURE OF TAXILANETO THE HANGARS FOR THE PHASE 1-5 WORK.
2. THE CONTRACTOR SHALL SCHEDULE THIER WORK TO MINIMIZE THE DURATION OFTHE CLOSURE OF THE TAXILANE.
PHASE 6B SPECIAL OPERATIONS AREA -SIGN WORK
1. PHASE 6B WORK AREA CONSISTS OF RELOCATION OF AN EXISTING SIGN WITH IN THE SAFETY AREA OFRUNWAY 5-23 AND WILL REQUIRE RUNWAY 5-23 TO BE CLOSED.
2. THIS WORK SHALL BE COMPLETED WHILE RUNWAY 11-29 IS OPERATIONAL. CLOSURE PERIOD IS LIMITEDTO DAYTIME ONLY.
PHASE 6A SPECIAL OPERATIONS AREA -STORM DRAIN CONNECTION.
1. PHASE 6A WORK AREA CONSISTS OF CONNECTION OF NEW STORM DRAINAGE OR MODIFICATION OFEXISTING STORM DRAIN INLETS OR CONNECTIONS ON THE EDGE OF THE SAFETY AREA FOR RUNWAY5-23. THE WORK MAY REQUIRE EXCAVATION WITHIN 250' OF THE RUNWAY 5-23 CENTERLINE.
2. IF THE CONTRACTOR DETERMINES THAT THE REQUIRED WORK WILL RESULT IN EXCAVATIONS WITHINTHE RUNWAY 5-23 SAFETY AREA (250' FROM RUNWAY CENTERLINE), THE CONTRACTOR SHALLCOORDINATE WITH THE AIRPORT TO SCHEDULE AN AVAILABLE TIME TO RESTRICT THE RUNWAY USAGETO SPECIFIC AIRCRAFT TYPES TO ALLOW FOR A REDUCED SAFETY AREA WIDTH. THE ALLOWABLEREDUCTION IN SAFETY AREA WIDTH IS 200' FROM CENTERLINE OF RUNWAY 5-23. THIS WILL ALLOW ADGC-II OR LESS AND ADG B-III OR LESS. THE ALLOWABLE SCHEDULE OF SAFETY AREA REDUCTION SHALLBE COORDINATED WITH THE AIRPORT 14 DAYS IN ADVANCE, AND SHALL ONLY BE AUTHORIZED DURINGTIMES OF VISUAL FIGHT RULE (VFR) CONDITIONS.