1 Swetha Not yet Indented End of Jan'12
2 Swetha Not yet Indented First week of Jan'12
S.No Material statusContractor Civil Readiness
8/2/2019 Tanks Material Priority List-Civil
2/22
3 Swetha Not yet Indented End of Dec'11
4 Not yet Indented
5 Not yet Indented
V tech
V tech
End of Nov'11
End of Dec11
6 Not yet Indented
V tech
First week of Jan'12
8/2/2019 Tanks Material Priority List-Civil
3/22
7 Not yet IndentedV tech
8 Not yet Indented
9 Not yet Indented
V tech 28.02.2012
10 Not yet Indented
15.01.2012
25.12.2012
V tech
V tech
11 Not yet Indented 28.02.2012V tech
8/2/2019 Tanks Material Priority List-Civil
4/22
17 Yet to be finalised Not yet Indented 10.02.2012
12 Indented 10.01.2012V tech
13 Indented
14 Not yet Indented
28.02.2012V tech
10.01.2012V tech
16 Indented 31.03.2012V tech
15 Indented 15.03.2012V tech
8/2/2019 Tanks Material Priority List-Civil
5/22
18 Yet to be finalised Not yet Indented 31.01.2012
19 Indented 31.12.2011V tech
10.04.2012Not yet IndentedV tech20
21 Indented
22 Not yet Indented
28.02.2012
28.02.2012
Swetha
Swetha
23 Indented 10.02.2012V tech
8/2/2019 Tanks Material Priority List-Civil
6/22
26 V tech Indented NA
28 Not yet Indented 30.03.2012
29 Swetha Not yet Indented 20.11.2011
30 Swetha Not yet Indented 20.11.2011
31 Swetha Not yet Indented 20.11.2011
32 Swetha Not yet Indented 31.12.2011
33 Not yet Indented End of Nov'11
34 Not yet Indented 31.12.2011
35 V tech Not yet Indented 30.03.2012
36 V tech Not yet Indented 30.03.2012
24 Indented NA
V tech
25 Indented
27 Indented
Swetha 30.04.2012
10.02.2012
8/2/2019 Tanks Material Priority List-Civil
7/22
5000 2500 8 0
6000 2500 12 0
6000 2500 16 14
5000 2500 16 2
6000 2500 12 14
5000 2500 12 2
6000 2500 10 7
5000 2500 10 1
6000 2500 8 7
5000 2500 8 1
6000 1250 8 7
5000 1250 8 16000 1250 20 1
6000 1500 8 0
6000 1500 16 0
5000 2500 8 0
6000 2500 12 0
6000 2500 16 145000 2500 16 2
6000 2500 12 14
5000 2500 12 2
6000 2500 10 7
5000 2500 10 1
6000 2500 8 7
5000 2500 8 1
6000 1250 8 7
5000 1250 8 1
6000 1250 20 1
6000 1500 8 0
6000 1500 16 0
5000 2500 8 0
12000 2500 12 7
WBL-1 IS 2062 Gr-B
WBL-2 IS 2062 Gr-B
ECOVERY ISLAND CARBON STEEL TANKS CONSOLIDATE BOQ FOR PLATES
TANK MATERIALSLENGTH
(mm)
WIDTH
(mm)
THK
(mm)
Mech
Tech
8/2/2019 Tanks Material Priority List-Civil
8/22
6000 2500 12 0
6000 2500 16 14
5000 2500 16 2
6000 2500 12 14
5000 2500 12 2
6000 2500 10 7
5000 2500 10 16000 2500 8 7
5000 2500 8 1
6000 1250 8 7
5000 1250 8 1
6000 1500 8 0
6000 1250 20 1
6000 2000 8 6
5000 2000 8 3
6000 2000 8 25000 2000 8 1
6000 2500 10 3
6000 2500 8 0
5000 1250 20 0
5000 2000 8 12
5000 1250 8 4
5000 2000 8 4
5000 1500 8 16000 2500 10 0
6000 2000 10 0
5000 1250 12 1
5000 1250 20 0
6000 2500 10 15
6000 2500 8 5
6000 2000 8 95000 1250 20 1
5000 2500 12 8
5000 1250 16 1
5000 2000 6 3
5000 2000 6 1
5000 2000 6 1
WBL-3 IS 2062 Gr-B
INTERMITENT MIXING TANK IS 2062 Gr.B
CLEAN CONDENSATE TANK IS 2062 Gr-B
SEC.CONDEENSATE TANK IS 2062 Gr-B
8/2/2019 Tanks Material Priority List-Civil
9/22
5000 1250 6 0
5000 2000 8 1
5000 1250 16 1
5000 1250 12 1
5000 1250 24 1
5000 1250 6 0
6000 2000 8 2
5000 2000 8 4
6000 1500 8 1
5000 1500 8 2
6000 2500 10 2
5000 1250 20 1
5000 2500 8 2
6000 2500 10 20
5000 2500 10 46000 1500 10 0
5000 1500 10 0
6000 1250 10 0
5000 1250 10 0
6000 2500 10 0
6000 1500 10 1
5000 1250 20 1
6000 2500 10 0
6000 2500 10 1
6000 1250 6 1
5000 1250 16 1
5000 1250 8 0
5000 2000 8 9
5000 2000 10 1
5000 2500 10 1
5000 1250 20 1
5000 2000 8 26000 2000 10 9
6000 2500 10 0
5000 1250 8 1
5000 1250 20 1
6000 2000 10 0
SALT CAKE SILO IS 2062 Gr-B
WASH WATER TANK IS 2062 Gr-B
RAW GREEN TANK IS 2062 Gr-B
HOT WATER TANK IS 2062 Gr-B
DREGS TANK IS 2062 Gr-B
8/2/2019 Tanks Material Priority List-Civil
10/22
6000 2000 8 2
6000 1500 8 2
5000 2500 10 0
5000 2000 8 0
5000 1250 6 15000 2000 5 1
5000 2000 5 1
6000 2000 10 30
5000 2000 10 5
6000 1500 10 6
5000 1500 10 1
6000 1500 10 6
5000 1500 10 1
6000 2500 10 0
6000 2500 10 0
6000 1250 10 2
5000 1250 20 1
6000 1250 6 1
5000 1250 16 1
5000 1250 8 0
5000 1250 5 1
5000 1250 6 15000 1250 6 2
5000 2000 6 0
5000 1250 6 1
5000 1500 6 0
6000 2500 10 0
6000 2500 10 0
6000 2500 14 28
6000 2500 14 75000 1250 20 1
5000 1250 6 2
5000 1250 8 0
6000 2500 10 0
WLS II IS 2062 Gr-B
DREGS DILUTION TANK IS 2062 Gr-B
DREGS MIXING TANK IS 2062 Gr-B
GREEN LIQUOR TANK IS 2062 Gr-B
SHIRNK TANK IS 2062 Gr-B
CENTRATE TANK IS 2062 Gr-B
8/2/2019 Tanks Material Priority List-Civil
11/22
6000 2500 10 0
6000 2500 14 28
6000 2500 14 7
5000 1250 20 1
5000 1250 6 2
5000 1250 8 0
6000 2000 8 4
5000 2000 8 2
5000 2500 10 1
5000 2000 10 1
5000 1250 8 3
5000 2000 10 2
6000 2000 12 0
5000 2000 12 1
8000 2000 12 15000 2000 12 0
6000 2000 12 1
5000 2000 12 0
8000 2000 12 1
5000 2000 12 0
6000 2000 12 16
5000 2000 12 4
6000 2500 12 4
5000 2500 12 1
5000 2500 10 66000 1250 20 4
6000 1250 20 3
6000 1250 20 2
5000 1500 10 4
6000 1500 10 2
6000 2500 10 2
6000 2500 10 1
6000 2500 8 6
5000 2500 8 9
6000 1500 8 25000 1500 8 3
5000 2500 10 0
5000 1250 20 1
5000 2000 10 7
5000 2000 6 2
WLS I IS 2062 Gr-B
IS 2062 Gr-BDILUTION WATER TANK
IS 2062 Gr-B
IS 2062 Gr-BBURNT LIME BIN
LIME MUD SLURRY TANK
LIME MUD STORAGE TANK IS 2062 Gr-B
LIME MUD MIXING TANK IS 2062 Gr-B
8/2/2019 Tanks Material Priority List-Civil
12/22
5000 2500 6 1
6000 1500 8 2
5000 2000 8 0
5000 2000 8 4
6000 2500 8 4
6000 2000 6 26000 1250 6 1
5000 1250 12 1
5000 1250 20 1
5000 1250 16 1
STEAM CONDENSATE TANK IS 2062 Gr-B 5000 1250 6 1
6000 2000 8 2
5000 1250 8 1
FOUL CONDENSATE TANK IS2062 Gr-B 5000 1250 20 1
CAUSTICIZER - 01 IS2062 Gr-B 5000 2500 5 2
CAUSTICIZER - 02 IS2062 Gr-B 5000 2500 5 2
CAUSTICIZER - 03 IS2062 Gr-B 5000 2500 5 2
Weak wash storage tank
Acid tank EVP
Acid tank csp
Day oil tank for lime kiln
Day oil tank for Recovery boiler
LIME STONE HOPPER IS 2062 Gr-B
LIME STONE BIN IS 2062 Gr-B
LIME MUD PURGE OUT HOPPER IS 2062 Gr-B
8/2/2019 Tanks Material Priority List-Civil
13/22
168000*2500*8 is non-standard, hence considered
5000*2500*8 Qty 16 nos
1412000*2500*12 is non-standard, hence
considered 6000*2500*12 Qty 14 nos14
2
14
2
7
1
7
1
7
11
1 JKPL Considered 1 no plate to meet requirement
1 JKPL Considered 1 no plate to meet requirement
168000*2500*8 is non-standard, hence considered
5000*2500*8 Qty 16 nos
1412000*2500*12 is non-standard, hence
considered 6000*2500*12 Qty 14 nos
142
14
2
7
1
7
1
7
1
1
1 JKPL Considered 1 no plate to meet requirement
1 JKPL Considered 1 no plate to meet requirement
168000*2500*8 is non-standard, hence considered
5000*2500*8 Qty 16 nos
0 12000*2500*12 is non-standard, hence
REMARKSJK
No. of
8/2/2019 Tanks Material Priority List-Civil
14/22
14
14
2
14
2
7
17
1
7
1
1 JKPL Considered 1 no plate to meet requirement
1
6
3
21
3
212000*2500*8 is non-standard, hence considered
6000*2500*8 Qty 2 nos
1 JKPL Considered 1 no plate to meet requirement
12
1 1 no plate is more than sufficient
4
12
1
1 Not shown on drg but included in drg BOQ
1 JKPL Considered 1 no plate to meet requirement
15Plate size on drg to be matched with BOQ on
excel sheet
5Plate size on drg to be matched with BOQ on
excel sheet
91
8
1
3
1
1
In BOQ Instead of 5000*1250*10 7 nos. plate,
considered higher side 6000*2500*10 Qty 2 nos
considered 6000*2500*12 Qty 14 nos
8/2/2019 Tanks Material Priority List-Civil
15/22
1 JKPL Considered 1 no plate to meet requirement
1
1
1
1
2 JKPL Considered 2 nos plate to meet requirement
2
4
1
2
2
1
2
20
45
1
5
1
812000*2500*10 is non-standard, hence
considered 6000*2500*10 Qty 8 nos
1
1
812000*2500*10 is non-standard, hence
considered 6000*2500*10 Qty 8 nos1
1
1
1 JKPL Considered 1 no plate to meet requirement
9
1
1
1
29
28000*2500*10 is non-standard, hence considered
6000*2500*10 Qty 2 nos
1
1
3Instead of 5000*1250*10 plate, considered higher
size 6000*2000*10 Qty 3 nos
Not considered in Mech Tech BOQ
8/2/2019 Tanks Material Priority List-Civil
16/22
2
2
28000*2500*10 is non-standard, hence considered
5000*2500*10 Qty 2 nos
28000*2000*8 is non-standard, hence considered
5000*2000*8 Qty 2 nos
11
1
30
5
6
1
6
1
128000*2500*10 is non-standard, hence considered
6000*2500*10 Qty 12 nos
1012000*2500*10 is non-standard, hence
considered 6000*2500*10 Qty 10 nos
2
1
1
1 MOC - SA 53 Gr B
1 JKPL Considered 1 no plate to meet requirement
1
10
1
0
1
128000*2000*10 is non-standard, hence considered
6000*2500*10 Qty 12 nos
1212000*2500*10 is non-standard, hence
considered 6000*2500*10 Qty 12 nos
28
71
2
1 JKPL Considered 1 no plate to meet requirement
128000*2000*10 is non-standard, hence considered
6000*2500*10 Qty 12 nos
Instead of 5000*1250*6 plate, considered higher
side 5000*2000*6 Qty 1 no
Instead of 5000*1250*6 plate, considered higher
side 5000*1500*6 Qty 1 no
8/2/2019 Tanks Material Priority List-Civil
17/22
1212000*2500*10 is non-standard, hence
considered 6000*2500*10 Qty 12 nos
28
7
1
2
1 JKPL Considered 1 no plate to meet requirementof gusset, insert, etc., plates
4
2
1
1
1 1 qty is more than sufficient
2
1
4
04
0
3
0
1
8
12
2
3
64
3
2 Cone stiffener material not included
4
2
2
1
6
9
23
88000*2500*10 is non-standard, hence considered
5000*2500*10 Qty 8 nos
1
7
2Dev drg needs to be corrected with respect to
BOQ
8000*2000*12 is non-standard, hence considered
5000*2000*12 Qty 1 no(Balance plate can taken
MechTech BOQ needs to be revised as per drg
12000*2000*12 is non-standard, hence
considered 6000*2000*12 Qty 1 no &
12000*2000*12 & 8000*2000*12 are non-standard, hence considered 5000*2000*12 Qty 4
Instead of 8000*2000*12 (is non-standard) &
6000*2000*12, considered 5000*2000*12 Qty 3
8/2/2019 Tanks Material Priority List-Civil
18/22
1
2
28000*2000*8 is non-standard, hence considered
5000*2000*8 Qty 2 nos
4
4
21
1
1
1
1
2
1
1
2MOC of top & bottom plates of roof is shown
incorrect in drg. Correct MOC is to be shown
2MOC of top & bottom plates of roof is shown
incorrect in drg. Correct MOC is to be shown
2MOC of top & bottom plates of roof is shown
incorrect in drg. Correct MOC is to be shown
Drawing is available in documan. But, BOQ is to
be considered by MechTech & JKPL
8/2/2019 Tanks Material Priority List-Civil
19/22
6000
6000
6000
6000
5000
5000
5000
6000
5000
5000
5000
6000
6000
5000
5000
5000
6000
6000
6000
6000
5000
5000
6000
6000
6000
6000
5000
5000
IS 2062 Gr B
1/20/2012
FIBRELINE CARBON STEEL TANKS CONSOLI
S No TANK MOC LengthCivil
Readiness
2/15/20122H2SO4 STORAGE
TANK
3 BS FILTRATETANK
IS 2062 Gr B
4WARM WATER
TANKIS 2062 Gr B11/17/2012
Material
status
Indented
1 NAOH TANK IS 2062 Gr B
Contractor
Swetha
Swetha
Swetha
Swetha
8/2/2019 Tanks Material Priority List-Civil
20/22
6000
6000
6000
6000
50005000
5000
6000
5000
5000
6000
6000
50005000
5000
5000
5000
5000
5000
5000
6000
6000
60006000
6000
6000
6000
6000
TOTAL
6H2SO4 SUPPLY
TANKIS 2062 Gr B2/15/2012
7 BLOW TANK IS 2062 Gr B
Indented5HOT WATER
TANKIS 2062 Gr BSwetha
Swetha
Swetha
8/2/2019 Tanks Material Priority List-Civil
21/22
1250 6 2
1500 10 1I qty added for gusset plate for all tanks by
mech tech, also by JKPL
2000 6 5I qty added for common reinforcement
opening plate by mech tech, also by JKPL
2000 8 3
1250 6 1
1500 6 3
2000 6 2
2000 16 1I qty added for common reinforcement
opening plate by mech tech, also by JKPL
2000 8 1
2000 6 28000*2000*6 non-standard hence,
considered 5000*2000*6 qty 2 nos
2500 8 1
1250 6 2
2000 6 4
1250 6 1
2000 6 3
Plate size considered by Mechtech in BOQ
is 8000*2000*6, in drg 5000*2000*6 qty 3
nos. BOQ is to be corrected
2000 6 3
1250 6 2
2000 6 9
2500 6 2
2500 8 2
1250 8 1
2000 6 8
2000 8 3
8000*2000*8 non-standard, hence
considered 6000*2000*8 qty 3 nos and
6000*1500*8 qty 1 no1500 8 1
2000 6 8
2500 6 3
1250 8 1
2000 6 8
ATE BOQ FOR PLATES
REMARKSQtyWidth Thk
8/2/2019 Tanks Material Priority List-Civil
22/22
2000 8 3
8000*2000*8 non-standard, hence
considered 6000*2000*8 qty 3 nos and
6000*1500*8 qty 1 no
1500 8 1
2000 6 8
2500 6 3
1250 6 21500 6 1
2000 8 1
1250 6 1
1500 25 4
1500 40 2
1500 40 4
1250 40 1
Bottom ring plate devlopment not
available in drg but plate considered in
BOQ.
2000 20 12000 18 1
2000 16 1
2000 14 1
2000 12 1
2000 10 1
2000 32 3
2000 40 1
2000 20 9
2000 18 9
2000 16 92000 14 12
2000 12 9
2000 10 6
2000 40 3
Bottom ring plate devlopment not
available in drg but plate considered in
BOQ.
2000 30 3
184