WS-A: Bhadla Solar Park
3
1. Solar Parks Concept: Solar Energy in India by:
• Decreasing the costs of development,
• Facilitating the due diligences of Solar projects with
financial institutions,
• Increasing the bankability of Solar projects in India and
• Decreasing the cost of generation targeting grid parity.
2. Bhadla Implementation
1. Phase I implemented 75 MW
2. Phase II 680 MW Under construction,
3. Phase III will develop 1000 MW
WS-A: Bhadla Solar Park
4
1. Preparation DPR – (Feasibility studies):
a) Soil (Analysis)
b) Solar Resource (Estimation)
c) Environmental (Impact, mitigation)
d) Access (Internal roads, SSEE, Management,
maintenance, manufacturing area)
a) Power evacuation (440/220/132/33 KV SSEE,
transmission line, internal network)
a) Water availability.
b) Bussines model
1. Dispatchability
2. Commercial scheme
3. Financial
4. RE policy
Activities %
Land acquistion 14,2%
Green belt and fencing 4,9%
Roads 9,7%
Street lights 0,8%
Electrical 45,8%
Water 5,7%
Land preparation 0,0%
Associated facilities 3,3%
Other costs 15,4%
Sub-total 100,0%
WS-B: RE Integration
5
1. Infrastructure-Transmission Planning
with large amounts of Variable
Renewable Energy
1. Reinforce the structure of the Planning
Department of RVPNL to allow it to
conduct all the network and RES
integration studies which need to be
developed.
a) Diagnostic of the current planning methods and
tools.
b) Recommendations on methods, human resources
and planning tools.
c) Structure of planning department.
WS-B: RE Integration
6
a) Training on POTENTIAL IMPROVEMENTS IN SYSTEM
OPERATION (February 2016, 12 attendants)
WS-B: RE Integration
7
a) Training on Impact of Renewable Energy
Sources in the System Operation.
(November 2016, 30 attendants)
a) Energy Balance.
b) System Security.
c) System Security
d) Renewable Generation
e) ControlEnergy Balance
WS-B: RE Integration
8
Support on Software tools to properly carry
out all its functions: Production models,
Power system analysis tools, IT integrated
databases
a) Transmission Control Centre & Renewables Control
Centre
b) Transmission Control Centre Potential
improvements
c) Transmission Planning with large amounts of
Variable Renewable Energy
WS-B: RE Integration
9
2. Infrastructure - Voltage Control in Western Rajasthan
a) analyze the voltage variability in the
north-western HV network of Rajasthan
b) regulatory mitigation measures
c) Reactive power compensation devices
(SVC or
STATCOMs)
a) Analysis and recommend-
dations
a) Definition of Detail study:
size, location, specification
WS-B: Operation with RE
10
1. Recommendations for Improvement of
Operation.
2. Advice on RE Generation Forecasting
3. Advise on RE Control Centre
4. Provision of Solar Measurement Plant of Bhadla
5. Training:
a) Load Dispatch and RE
Integration
a) RE Forecast
b) Demand forecast
c) PS operation
d) Ancillary services
11
Dif
ficult
y
Priority
Evacuation
Timelines
Land allotment
Solar
Assessment
Data
Clearance
s
Water availability
Site
accessibility
Skilled labour Coordination
among entities
Size of bubble
reflects the
severity of impact
& maps major
challenges
across order of
priority &
difficulty
Critical requirement - Timely arrangement of evacuation network followed by ease in land allotment
WS-C: Institutional Improvement1. Investor Survey
WS-C: InstitutionalImprovement
12
1. ERP Implementation
1. Follow Up, recommendations, guidelines on
implementation
2. Operation improvements.
3. Training
2. Assets Mapping
1. Diagnostic and implementation plan,
2. Institutional adequacy and development
3. Community policy
1. Draft Community Policy
2. Implementation Community policy
Overview
14
Complete System Study of Transmission Network of Rajasthan Rajya Vidyut Prasaran
Nigam Limited (RVPN)Objective of Project
Key Drivers
1. Large amount of RES to
be installed in west of the
State
2. Weak existing
transmission network
3. Invest in the
transmission systems to
facilitate: Integration of
RE; Export of the surplus
400
405
410
415
420
425
430
435
440
445
450
Mar-
15
Ap
r-15
May-1
5
Ju
n-1
5
Ju
l-15
Au
g-1
5
Sep
-15
Oct
-15
Nov-1
5
Dec-
15
Jan
-16
Feb-1
6
Mar-
16
Ap
r-16
May-1
6
Ju
n-1
6
Ju
l-16
400 kV
Jodhpur
400 kV
Akal
400 kV
Barmer
kV
Source: RVPN
400 MW
JODHPUR
3100 MW
JAISALMER
Wind Power 4007 MW
Solar Power 1295 MW
150 MW
BIKANER
1100 MW
JODHPUR
Expected Addition by 2021-22 : 23,000 MW
330 MW
Pratapgarh
200 MW Scattered
(Solar+Wind)
Monthly Max. Voltages
Illu
str
atives
Overview
15
Key Steps
Development appropriate System Model
Review of investments financing by
ADB
Review and Analysis of Transmission Grid
regarding Planning, Expansion
Implementation Program and Optimum/
Efficient Operations
1
2 3
• Step 2 has been carried out on immediate basis since proposed assets have
relatively longer construction periods and immediate procurement decisions
are required in order to facilitate the planned RES integration by 2022
(concluded)
• Step 3 involves detailed analysis of the power system to characterise,
understand and define the diagnostic of the power system, find out
weakness and key operative and equipment (installation of Voltage
regulation devices etc.) needs. These equipments have shorter procurement
and installation periods (on-going)Outcome: Recommendations and guidelines for improvement of operation planning of the system with large RES
Proposed Transmission Network for Evacuation of RES Generation: Analyzed Facilities
16
RVPN Proposed Investments: 765
kV GSS Korna, 400 kV GSS
Pokhran (upgradation), 220 kV GSS
Sheo, 220 kV GSS at Salamgarh/
Ghatol , Augmentation of Akal and
Jaisalmer-2. (and associated
network)
PGCIL Proposed Investments: 765
kV GSS Parewar, 765 kV GSS
Fatehgarh, 765 kV GSS Bhadla,
400 kV GSS at Pugal, 400 kV GSS
at Nokh. (and associated network)
Methodology
17
• Development of an integrated PSSE model of the Power system:
• Integration of RVPN and POSOCO models ;
• Integration of the proposed future facilities and demand 2021-22
• Execution of simulations and Analysis of results:
• Operative scenarios in different operative conditions (generation,
export, demand).
• Analysis of the performance of the facilities under the alternative
scenarios
Analysis: Scenario X
18
Loading of the Relevant Lines in the Steady-State Regime under Scenario 1 of operation
Loading of the Relevant Transformers in the Steady-State Regime under Scenario 1 of operation
Analysis: Scenario 1 ”Day time Operation”
19
COMMENTS ON THE PERFORMANCE OF THE INFRASTRUCTURES
400 KV GSS AT POKHRAN:Direction of Flows and loading through Pokhran GSS
28
.8
9.5
S1
15
.0
1.5
131350
POKRAN1
1.0
127.5
I
60
.0
63
% I
19
.7H
10
%SS1
5%
15
%
132181
UNDOO2
W1
16
2.5
17
1%
53
.4H
I
S1
63
% I
R1
0.0
23.2
60
.0
19
.7H
-16
.2
-11
.3
-16
.2
-11
.3
-15
.0
-1.3
-99
.3
-10
.5
-99
.3
-10
.5
132159
RAMGARH_GSS
S1W2 W3
W4 W1
10
2.0
2.2
10
2.0
2.2
51
2.7
16
8.5
H
87.8
28.8
H8
7.8
28
.8H
87
.8
28
.8H
8.4
2.8
H
1.0
220.0
78%
S
78%
S
58
% I
9%
I
58
% I
W1
132092
DECHU
10
3%
I
10
1%
I
S2
96
.0
31
.6H
97
.5
32
.0H
84
.0
27.6
H8
8%
I
S1
1.0
220.0-2
6.1
-11
.2
-26
.1
-11
.2
1.0
213.2
26
.1
4.9
26
.1
4.9
22
% S
22
% S
134048
POKRAN4
0.0
11
2.2
R1
132183
POKRAN42
50
% S
50
% S
55%
I
55
% I-2
59
.4
-39
.5
-25
9.4
-39
.5
25
9.4
-16
.6
25
9.4
-16
.6
26
0.3
58
.6
26
0.3
58
.61.0
380.2
-25
8.6
-0.6
-0.6
R1
134047
KORNA74
137008
KORNA7
0.0
30
1.1
134037
JODHPUR_NEW
-59
8.6
10
1.1
-59
8.6
10
1.1
-59
8.6
10
1.1
60
0.3
-67.5
60
0.3
-67.5
14
6.7
99.7
14
6.7
99.7 -2
58
.6
60
0.3
-67.5
-35
3.9
-36
.7
-35
3.9
-36
.7
35
8.7
37.8
35
8.7
37.8
1.0
730.8
1.0
388.0
34%
S
34
% S
42
% I
42
% I
42
% I
70%
S
70%
S
0.0
70
.3
0.9
375.0
0.9
379.0
-54
3.1
-43
.6
-54
3.1
-43
.6
1.0
386.0
69
.1
54
7.2
54
7.2
69
.1
16
.2
2.3
16
.2
2.3
10
7%
S
134036
JAISALMER_2
R1
R1
-94
.3
-45
.7
-44
2.7
-62
.7
-62
.7
-44
2.7
0.0
11
6.4
1.0
381.7
94
.7-2
.8 134009
RAJWEST
31
1.3
97
.6 0.0
11
2.9
-31
0.1
-71
.0
0.9
373.9-35
3.9
-20.5
0.0
42
.74
43
.6
58
.9
44
3.6
58
.9
36
0.0
55
.4
B1
-15
4.5
-33.9
134015
JODHPU-4
-14
6.4
-79
.9
-14
6.4
-79
.9
1
67
.5
48
% I
36
.5H
3
67
.5
48
% I
36
.5H
5
67
.5
48
% I
36
.5H
2
67
.5
48
% I
36
.5H
6
67
.5
48
% I
36
.5H
67
.5
48
% I
36
.5H
4
15
5.6
18
.6
87%
S
87%
S
70%
S
31%
N/A
134001
AKAL-4
63%
S
20
% S
10
7%
S
33
9%
I
58
% I
1.0
213.3
R1
N/A
N/A
N/A
N/A
Reliability Analysis: Contribution of the Proposed Investments to the Reliability of the System
20
SIMULATION RESULTS
Differential patterns of contribution between Lines and substations
Thank you!