Standohyd Basecoat Guide.
1. Prepare the surface in the usual manner.
Preparation
· a light coat.· a covering coat.
2. Clean with Standohyd cleaner.
Mixing
Application
Overcoating
· Apply a final coat to control the effect.· Dry with a air blower system.
1. Mix the required amount of colour. 2. Add 5-10-15% StandohydDemineralized water.
1. With a one visit application spray a
If needed
1. Mix the clear according tothe (TDS).
2. Apply the clear according tothe (TDS).
Top Related