7/28/2019 Standard_Interconnection_Application 100-1000 kW.pdf
http://slidepdf.com/reader/full/standardinterconnectionapplication-100-1000-kwpdf 1/4
Standard Interconnection ApplicationGenerating Facilities with Rated Capacities Greater Than 100 kW and up to 1,000 kW
A Customer-Generator applicant ("Applicant") hereby makes application to EI Paso Electric Company ("EPE") to install
and operate a generating facility with rated capacity greater than 100 kW and up to 1,000 kW interconnected with the
EPE utility system.
Written Applications should be submined by mail, e-mail, or fax, to EI Paso Electric Company, as follows:
EI Paso Electric Company (Loc. 131)lOON. Stanton, EI Paso, Texas 7990 1
Fax Number: (915)521-4418E-Mail Address:[email protected]
EI Paso Electric Contact Name: Rober1o Favela
EI Paso Electric Contact Tille: Project Manager - Corporate Development
An app lication is a Complele Application when it provides a ll applicable infonnation required below. (Additional
infonnation to evaluate a request lor interconnection may be required and will be so requested from the InterconnectionApplicant by EI Paso Electric Company aRer the applicfition is deemed complete).
Application Fee Must Accompany this Appliclltion
o System >100 kW up 10 lind including 1,000 kW; $100 plus $1.00 ror nch kW .bove 100 kW
SECfION 1. APPLICANT INFORMATION
Legal Name of Interconnecting Applicant (OJ, if an Individual, Individuals Name)
Name: ___________________
Mailing Address: ____
City: ________________ State: Zip Code: ______
Facility Location (i f different from above):
Telephone (Day): _ _ __ ____________ _ (Evening)______________ _
Fax Number: ______________ E-Mail Address: ____________________ _________________
EPE AccOWlt Number: - - - ~ ~ c ~ - - . , , _ _ ~ ~ ~ - - ~ ~ ~ - - - - - - ~ _ ~ _ - - ~ ~ , = = ___ -(Existin& Account Number . ifgenerltor to be interoonrtecled on the Customer liide of EPE's revenue metef)
Type oflnterconneci Service Applied for (choose one):
o Network Resource 0 Energy Only 0 Load Response (no export) 0 Net Metering
SECTION 1. GENERATOR QUALIFICATIONS
Data apply only tothe
Generating Facility, not the intercoMection Facilities.
Energy Source: 0 Solar 0 Wind 0 Hydro Hydro Type (e .g., Run-of-River): __________________________
o Diesel 0 Natural Gas 0 Fuel Oil 0 Other (state type): _________________________
Prime Mover: 0 Fuel Ce ll 0 Reciprocating EngiRt: 0 Gas Turbine 0 Steam Turbine 0 Microturbine 0 PV
o Other (descr ibe) _____ ________________ ______ _
Type of Generator: 0 Synchronous 0 Induction 0 Inverter
Page I or4
7/28/2019 Standard_Interconnection_Application 100-1000 kW.pdf
http://slidepdf.com/reader/full/standardinterconnectionapplication-100-1000-kwpdf 2/4
Generator Nameplate Rating: _ kW (Typical); GeneralOr Nameplate kVA:
Interconnection Customer or Customer-Site Load: _ _ _ kW (if none, so state)
Typical Reactive Load (irknown):
Maximum Physical Export Capability Requested:
List components of the Generating Faci lity Equipment Package that are currently certified:Egu ipment Type Certifying Enlity
I.===-=====.
3.4. ________ ____ _ _
5. _ _ .__
Is the prime mover compatible with the certified protective relay package? __ _ Yes __
Generator (or solar collector)Manufacturer, Model Name & Number:
Version Number:
Nameplate u t p u t I P ~ o w w ~ e " ~ R ~ . ~ H ; ; n g g T . i n 1 i i k W V i ' = = = (Summer) (Winter)Nameplate Output Power Rating in kVa: _____ Summer) (Winter)
lndividual Generator Power Factor
kW
No
Rated Power Factor: Leading: I.agging: 7 ' - - - ~ ~ ~Total number of Generators to be interconnected pursuant to this Interconnection Application: _________
Elevation: Single Phase: _ _ ____ Thrce Phase: ___ _ _
Inverter Manufacturer. Model Name & Number (i fused): c ~ ; o ; t ; : m - : : = : : : : = = = ; = : : : : = = = = = = : : : ; = = =List of adjustable set points for the protective equipme nt or software:
Note: A completed Power Systcms Load Flow data sheet must be supplied with the Interconnection Application.
Generating Facility Characteristic Data (for jnverter-ba$ed machines)Max design fault contribution current: Instantaneous or RMS?
Harmonics Characteristics:Start-up Requirements:
Generating Facility Characteristic Data (for rotatin, m ~ . £ h i n . WRPM Frequency: Neutral Grounding Resistor (ifapplicabte): ______ _____
Synchronous GeneratorsDirect Axis Synchronous Reactance, Xd:Direct Axis Transient Reactance, X'd:Direct Axis Subtransient Reactance, X"d:
Negative Sequence Reactance, X2:Zero Sequence Reactance, XO:
P.U.
P.U .____ _ P.U.
____ .U.
P.U.--- ---
KVA Base: Field Volts:
Induction Generators•
Field Ampers:
Motoring Power (kW): 12t or K (Heating Time Constant):
Rotor Resistance, Rr: Stator Resistance, Rs:Stator Reactance, Xs: Rotor Reactance. Xr:Magnetizing Reactance, Xm: Short Circuit Reactance, Xd":Exciting Current: Temperature Rise:
Frame Size: Design Letter:Reactive Power Required in Vars (No Load): _ _ _ _ Reactive Power Required in Vars (Full Load): ___ _
Total Rotating Inertia. H: Per Unit on kVA Base
Page 2 of 4
7/28/2019 Standard_Interconnection_Application 100-1000 kW.pdf
http://slidepdf.com/reader/full/standardinterconnectionapplication-100-1000-kwpdf 3/4
• Note: Please contact EI Paso Electric Company prior to submitting the Int erconnection Application to determine if
the specified infonnation above is required
Excitation and Governor System Dato for SynchrrulrulUieneraton Onlv
Provide appropriate IEEE model block diagram of excitation system. governor system and power systemstabilizer (PSS) in accordance with the regional reliability council criteria. A PSS may not be determined to be
required by applicable studies. A copy of the manufacturer 's block diagram may not be substituted.
SECTION J. INTERCONNECION FACILITIES INFORMATION
Will a transformer be used between the generator and thl: Point ofCommon Coupling? Yes No
Iransfonncr Data (((Applicable for Interconnection C"Homer-Owned Transfonnerl
Is the transfonner: single phase three phase? Size: kVA
Transformer Impedencc: _____ percent on kVA Base
Ifllrree Phase:Transfonner Primary: _ ____ Volts____ _ _ Delta Wye Wye Grounded
Transfonner SeGondary: ____ Volts____ Delta Wyc Wye Grounded
Transformer Tertiary: _ ___ Volts_____ Delta Wye Wye Grounded
Transformer Fuse Data UfApplicable for I n t e r c o ~ n Customer-Owned Fuse)
(Anach copy of fuse manufacturer's Minimum Melt IUld Total Clearing Time-Current Curves)Manufacturer: . Type: Size: Speed: ___ _
Inle«:oooecling Circuit Breaker (If Applicable)
Manufacturer: Type:'(l;YOie.j;:-::=====-Load Rating (Amps): Interrupt Rating (Amps): Trip Speed (Cycles):
Jnlercoooecljon Protectjve Relays aCApplicabld
If Microprocessor-CQntrolled:List of Functions and Adjustable Setpoints for the prote(:tive equipment or software:
J.
2.
Selpoint FWlctjon Minimmu
3. _ _ _ __ __ _ _ _ _ _ _ __
4. =========.6. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
If Discrete Components:
(Enclose Copy of any Proposed Time-Overcurrent Coordination Curves)
Maximum
Manufacturer: Type: _ _ _ _ Style/Catalog No.: Proposed Setting: ___Manufacturer: Type: _ _ _ _ Style/Catalog No.: ____ Proposed Setting:__Manufacturer: Type:___ Style/Catalog No. : Proposed Setting: ___Manufacturer: _ _ Type:___ Style/Catalog No.: Proposed Setting: _ __Manufacturer: Type: _ __ Style/Catalog No.: Proposed Setting:___
CUmnt Iransfonner Data Of p . Q ~(Enclose Copy of Manufacturer's Excitation and Ratio Correction Curves)
Manufacturer: _ Type: ._ _ _ _ Accuracy Class: Proposed Ratio Connect ion : _ _Manufacturer: Type: _ _ __ Accuracy Class: ___ Proposed Ratio Connection:__Manufacturer: Type:__ ccuracy Class: Proposed Ratio Connection:__
PQleniial Transformer Data (I fApplicable}
(Enclose Copy of Manufacturer's Excitation and Ratio Correction Curves)
Manufacturer: Type: Accuracy C las s: Proposed Ratio COMcction:__Manufacturer: ___ Type: ____ Accuracy Class: ____ Proposed Ratio Connection:__Manufacturer: Type: _ __ _ Accuracy Class: Proposed Ratio Connect ion :__
Page 3 of4
7/28/2019 Standard_Interconnection_Application 100-1000 kW.pdf
http://slidepdf.com/reader/full/standardinterconnectionapplication-100-1000-kwpdf 4/4
SECTION 4. GENERAL INFORMATION
Enclose copy of s ite electrical one-line dillgram showing the configuration of a ll Generating Facil ity equipment, current
and potential circuits, and protedion and C(lntroi schemes.
This one-line diagram must be signed and stamped by a licensed Professional Engineer if the Generating Facility is larger
than 50 kW. Is One·Line Diagram enclosed? ._ _ _ _ _ _ Yes No
Enclose copy of any site documentation that indicates the precise physicallocalion of the proposed Generating Facility
(e.g., USGS topographic map or other diagram or documentation).
Proposed location of protective interface equipment on property (include address if different from the InterconnectionCustomer's address). _____________ _ ____ ___ ______ ________ __
Enclose copy of ally site documentation that describe!; and details the operation of the protection and control schemes. Is
available documentation enclosed? Yes No
Enclose copies of schematic drawings fOf a ll proteetjc,n and control circuits, relay current circuits, relay potential circuits.
and alarm/monitoring circuits ( i f applicable). Are schematic drawings enclosed? Yes No
SECTION 5. APPLICANT SIGNATURE
I hereby certify that, to the best ofmy knowledge, the infonnation provided in the Interconnection Application is true and
correct. I also agree to install II Warning Label provided by EI Paso Electric Company on or near my service meter
location. Generating systems must be compliant with IEEE, NEe, ANSI, and UL standards, where applicable. Bysigning below, the Applicant also certifies that the installed generating equipment meets the appropriate preceding
requirement(s) and can supply documentation that confirms compliance.
Signature of Applicant:
Title:
Date:
SECTION 6. INFORMATION REQUIRED PRIOR TO PHYSICAL INTERCONNECTION
(Not fequired as a part of he applicution, unless available at time of application)
Installing Electrician:____________ ___ _______________ _ _ ___ _ _
Finn:__ _ __ _ _
License Number:___ _
Mailing Address:___ _ _____
City: State: Zip Code:____ _ _
Telephone:
___Installation Date: ___ ______
Interconnection Date:___ _ ___
Signed (Inspector- if required): ________________________ _ _____ _
Date:
(In lieu of signature of Inspec tor, a copy oflne final inspection certificate may be attached.)
Page 4 of4