- 1. Standard NIKE Work Plans Region 3 FUDSPhiladelphia,
PAOctober 22, 2009
2. Objective
- Develop generic scope of work for all NIKE Missile Sites
- Standard Work Statements for former Launch and Control
areas
- Developed in February 2000 by Headquarters, Army Reserve
Command (99 thRRC)
- Developed in conjunction with Pennsylvanias CMSA for
consistency
3. Generic Scope of Work
- NIKE Launch Sites Site Investigations
- NIKE Control Sites Site Investigations
- NIKE Launch Sites RemedialInvestigations
- NIKE Control Sites RemedialInvestigations
4. Former Control Area Former Launch Area Youve Seen One, Youve
Seen Them All! 5. Contaminants of Concern
- POL - Diesel/gasoline/No. 2 fuel oil/motor oil
6. Nike Launch Area Impacts 7. NIKE Launch Site SI
-
- Potential AOCs for launch Sites
8. NIKE Launch Site SI (cont.)
-
- Task 1 - Project management
-
- Task 3 Preparation of project plans
-
- Task 4 Site Sampling and Contingent Removal Activities
-
- Task 5 Decommissioning of Silos
-
- Task 6 Site Investigation Report
9. Attachment A
- Decision Rules for Removal Actions
-
- Time and costs reduced significantly by focusing on
similarities
-
- Constructing a pre-determined set of responses based on those
similarities
-
- EPA's presumptive remedy policy
-
- Knowledge gained from previous experience at waste sites
10. Site Diagram 11. Launch Doors Today 12. Possible Contaminant
Areas 13. Nike Launch Areas 14. Missile Storage 15. Main Personnel
Access 16. 17. 18. Main Entrance Area 19. Magazine 20. Missile
Elevator 21. 22. Main Hydraulic Tank/Pumps 23. Pumping of Perched
Water through Launcher Door 24. 25. Draining of Elevator Sump 26.
Nike Control Area 27. 28. Former Control Area Admin parking
lot/radar trailer area Former control area Former mess hall area
Old radar pad area 29. Control Area Impacts 30. Habitation Areas
31. 32.