STANDARDINDUSTRIPEMBINAAN(CONSTRUCTION INDUSTRY STANDARD)
CIS 27:2019OCCUPATIONAL SAFETY AND HEALTH – SPECIFICATION AND BILL OF QUANTITIES (BQ) FOR CONSTRUCTION WORKS
© CopyrightConstruction Industry Development Board Malaysia
Description: Specification,billofquantities,safetyandhealthplan,OSHpersonnel,HIRARC,performancereport,specialworkingconditionandtrafficmanagement.
Construction Industry Development Board MalaysiaLEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIAIbu Pejabat CIDB, Tingkat 10, No 45, Menara Dato’Onn, Pusat Dagangan Dunia Putra, Jalan Tun Razak, 50480 Kuala Lumpur. Tel: 603-4047 7000 Faks: 603-4047 7070http://www.cidb.gov.my
OCCUPATIONAL SAFETY AND HEALTH – SPECIFICATION AND BILL OF QUANTITIES (BQ) FOR
CONSTRUCTION WORKS
ii
OCCUPATIONAL SAFETYANDHEALTH – SPECIFICATIONANDBILLOFQUANTITIES (BQ) FORCONSTRUCTIONWORKS
©Construction Industry Development BoardMalaysia 2019
All enquiries regarding this book should be forwarded to:
Chief ExecutiveConstruction Industry Development BoardMalaysiaLevel 10,MenaraDato’ Onn,Pusat DaganganDunia Putra,No. 45, JalanTun Ismail,50480 Kuala Lumpur,MALAYSIA.
Tel : 603-4047 7000 / 1300 88 2432Fax : 603-4047 7070Email : [email protected] : www.cidb.gov.my
Nopart of this publicationmaybe reproducedor transmitted in any fromor by anymeans,whethermechanical or electronic including photocopying and recordingwithout thewritten consent of CIDB.
PerpustakaanNegaraMalaysia Cataloguing-in-PublicationData
iii
TABLE OF CONTENTS
Page
Committeerepresentation ivPreface v
SECTION 1: GENERAL 1 1.1 Scope 11.2 NormativeReferences 11.3 TermsandDefinitions 11.4 Abbreviation 2 SECTION 2: OCCUPATIONAL SAFETY AND HEALTH SPECIFICATION FOR CONSTRUCTION WORKS 2
2.1 DutyofContractor 22.2 SafetyAndHealthPlan(S&HPlan) 32.3 OSHPersonnel 52.4 SafetyAndHealthCommittee 52.5 SafetyAndHealthTraining 52.6 HazardIdentificationRiskAssessmentAndRiskControl(HIRARC) 62.7 SafetyAndHealthPerformanceReport 62.8 SafetyAndProtectiveEquipment 62.9 HealthAndWelfareProvision 72.10 SafeWorkingArea 82.11 TrafficManagement 92.12 SpecialWorkingConditions 92.13 AccessAndEgress 92.14 PlantAndMachinery 102.15 TemporaryWorksbyDesigner 10
Annexes A: OCCUPATIONAL SAFETY AND HEALTH BILL OF QUANTITY 11
Acknowledgement 14
iv
COMMITTEE REPRESENTATION
ThisConstruction IndustryStandard(CIS)wasmanagedanddevelopedby theConstruction IndustryDevelopment Board Malaysia with the assistance of the Technical Committee of Safety and Healthin Construction, which comprises representatives from the following organisations:
Association of Consulting EngineersMalaysia (ACEM)
Department of Occupational Safety &Health (DOSH)
Jabatan Kerja Raya (JKR)
Jabatan Pengairan dan Saliran (JPS)
Lembaga LebuhrayaMalaysia (LLM)
Malaysian Institute ofArchitects (PAM)
Master BuildersAssociationMalaysia (MBAM)
Real Estate &HousingDevelopmentAssociation (REHDA)
Royal Institution of SurveyorsMalaysia (RISM)
ToklanOSHServices
Universiti TeknologiMARA (UiTM)
v
PREFACE
This Construction Industry Standard (CIS) hereby referred as CIS 27: 2019 was developed asOccupational Safety and Health : Specification and Bill of Quantities (BQ) for Construction Worksby the Construction Industry Development Board (CIDB)Malaysia which acted as amoderator andfacilitator for the technical committee throughout the development process of this standard.
This CIS 27: 2019 Occupational Safety and Health : Specification and Bill of Quantities (BQ) forConstructionWorksadoptseveral componentswith reference toOccupationalSafetyandHealthActandRegulations(OSHA1994),FactoriesandMachineryActandRegulations(FMA1967),ConstructionIndustryDevelopmentBoardAct520,CIS15:2019GuidelinesofPreventionofFallatConstructionsSite, Guideline for Public Safety and Health at Construction Sites 2007 etc. The Specification andBillQuantities (BQ) proposed in thisCIS 27 : 2019may be adopted in total or in part and addition/omissionmay be effected to suit the project needs.
Compliance with this Construction Industry Standard does not of itself confer immunity from legalobligations.
1
OCCUPATIONAL SAFETY AND HEALTH - SPECIFICATION AND BILL OF QUANTITIES (BQ) FOR CONSTRUCTION WORKS
SECTION 1: GENERAL
1.1 Scope
TheConditionsofContractfortheWorkswhichisembodiedinanyFormofContractshallbereadinconjunctionwiththisSpecification.AcopyoftheFormofContractisavailableforinspectionontheTenderTableDocumentonanyworkingdaywithin the timestipulated for receiving tenders. If thetenderersconsiderthatanyoftheclausesofthecontractinvolvesexpenses,thetenderersshallallowforthemoneyvalueofsuchclausesinthetender.
TheWorkscoveredinthecontractcomprisetheprovisionbytheContractorathisownriskandcostofallmaterials,scaffolding,tools,plant,labour,transport,water,lightandeverythingelsenecessaryfortheconstructionandcompletionoftheproject.
AlltotheentireapprovaloftheSuperintendingOfficer/ProjectDirectorhereinafterreferredtoastheS.O/P.D.
1.2 Normative references
The followingnormative reference is indispensable for theapplicationof thisconstruction industrystandard.Fordatedreference,onlytheeditioncitedapplies.Forundatedreferences,thelatesteditionsofthenormativereferences(includinganyamendments)apply.
(i.) ConstructionIndustryDevelopmentBoardAct520
(ii.) FactoryandMachineryAct(FMA),1967Rev2006andRegulationsundertheAct
(iii.) OccupationalSafetyandHealthAct(OSHA),1994andRegulationsundertheAct
(iv.) GuidelinesForHazardIdentification,RiskAssessmentAndRiskControl,2008,DOSH
(v.) GuidelinesforPublicSafetyandHealthatConstructionSites,2007,DOSH
(vi.) MS2318:CodeofPracticeforDemolitionofBuildings,2010
(vii.) CIS15:2019GuidelinesofPreventionofFallatConstructionsSite
(viii.) IndustryCodeofPracticeforSafeWorkinginAConfinedSpace,2010,DOSH
1.3 Termsanddefinitions
Forthepurposeofthisstandard,thefollowingdefinitionsshallapply.
(i) Designated person
Competentpersonappointedbyanemployertocarryoutanysupervisionorinspectionandtoperformanytasksordutyprescribedbyemployer.
(ii) Contractor
Apersonwhoundertakestocarryoutorcompleteanyconstructionworks.
(iii) Construction works
AsdefinedinAct520CIDB.
22
(iv) SuperintendentOfficer(S.O)
Asdefinedintheconditionsofcontract.
(v) ProfessionalEngineerwithpractisingcertificate
Apersonregisteredundersubsection10DoftheRegistrationofEngineersAct (Revised2015).
1.4 Abbreviation
1. BOWEC – BuildingOperationsandWorksofEngineeringConstruction2. CIDB – ConstructionIndustryDevelopmentBoardofMalaysia3. CIS – ConstructionIndustryStandard4. CSS – ContractorSiteSupervisor5. DOSH – DepartmentofOccupationalSafetyandHealth6. HIRARC – HazardIdentification,RiskAssessmentandRiskControl7. MOH – MinistryofHealth8. MS – MalaysiaStandard9. OSH – OccupationalSafetyandHealth10. PD – ProjectDirector11. PEPC – ProfessionalEngineerwithPractisingCertificate12. SHC – SafetyandHealthCommittee13. SHO – SafetyandHealthOfficer14. S&H – SafetyandHealth15. SSS – SiteSafetySupervisor16. S.O – SuperitendentOfficer17. TNB – TenagaNasionalBerhad
SECTION 2: OCCUPATIONAL SAFETY AND HEALTH SPECIFICATION FOR CONSTRUCTION WORKS
2.1 Duty of Contractor
TheContractorisresponsibletoregisterabuildingconstructionworkswithcontractperiodofmorethanSix(6)weekstotheDepartmentofOccupationalSafetyandHealth.TheregistrationmustbecompletedwithinSeven(7)daysafterthecommencementofWorksincompliancewithSection35,FactoryAndMachineryAct1967(Revision1974).
Generaldutyofcontractorshallincludebutnotlimitedtothefollowing:
(i) TonotifyconstructionworkswithDOSHwithinseven(7)daysofsiteposessionforprojectwithcontractperiodofsix(6)weeksandmore.
(ii) Toprovideandmaintainasafeplantandsystemofwork.
(iii) Tomakearrangementsforhandling,usage,transporting,andstorageofsubstances.
(iv) Toprovidesafetyandhealthinformation,instruction,trainingandsupervision.
(v) Toprovideandmaintainsafeaccessandegressatworkplace.
(vi) To provide andmaintain a safe and healthyworking environment including adequatewellfarefacilities.
(vii) To establish aSafety andHealth committee at thework placewho is responsible toconductaminimumofone(1)meetingforaeverythree(3)months.SuchrequirementisapplicableforWorkswhichemploysmorethan40personnelon-sitefortheWorks.
33
(viii) ToensureallconstructionpersonnelatConstructionworksiteholdingavalidCIDBGreenCard.
(viiii) Toprovideandmaintainsafetyprovisionfortheiremployeesincludingthesubcontractorsandothers.
2.2 Safety And Health Plan (S&H Plan)
TheContractorshallpreparetheSafetyandHealthPlanasfollows:
(i) Fulfilment of all safety and health requirement during the construction works whichincludesplanning,managingandmonitoringplanthatenablestheWorkstobepracticallycommencewithoutanypotentialrisktosafetyandhealth;
(ii) Fulfilment all the requirement, pre-construction information and any other informationprovidedbytheOwner;
(iii) Scheduledplan forprojectupdate, review, reviseand refineof theSafetyandHealthPlaninconsistentwiththeprogressoftheWorksandminimizingthepotentialsafetyandhealthrisk;
(iv) ArrangementforS&HPlantobepracticallyimplementedacrossallpersonnelcarryingouttheconstructionworkandallpersonswhomaybeaffectedbytheWorks;
(v) Reasonablemeasures to identifyall potential safetyandhealth risksarising from theconstructionwork(includingtherisksspecifictotheparticulartypeofconstructionworkconcerned);
(vi) Suitable and sufficientmeasure for riskmitigation that includes provision of any siteSafetyandHealthrules.
TheContractorshallsubmitfive(5)copiesofthepreparedSafetyandHealthPlantotheS.O.ortheclientrepresentative(eachcopyforS.O/P.D,HeadofProjectTeamandSiteOffice)beforetheprojectcommencesandupdateittotheS.O.ortheclientrepresentativethroughouttheconstructionworks.AcopyoftheupdatedSafetyandHealthPlanshallbekeptatsite.
SafetyandHealthPlanshallincludethefollowing:
(i) Project Introduction and Scope of Works (as in Works Programme or Critical PathMethod)associatedwithOccupationalSafetyandHealth(OSH).
(ii) Contractor’s Authorized and Updated OSH Policy, Drug and Alcohol Policy; OSHpromotional activities and campaign that carried out to meet Client’s Objective andTargets.
(iii) Contractor’sOrganizationChartandSafetyandHealthCommittee(SHC)Chartwhichshall describing the staff involved (example: Employer, Project Manager, SafetyAndHealth Practitioner, Foremen, Designated Person / Person In Charge / CompetencePerson,Sub-Contractor,Supplierinvolved,SecurityOfficer,Visitors,etc.)
(iv) Arrangementofcommunication,consultationand involvementofeachmemberof theContractor’s project team as shown in the Item 6.3 (iii), including their relationship,interfacingsandcooperationofworkmenforsuccessful implementationof theproject.TheplanningshalltakeintoaccountcontrolofanyOSHCommunications(ToolboxTalkandSafetyMeeting),OSHrelatedcomplaints,advice,OSHprogrammesandawareness,SHCmeetings’schedule,andsolvingOSHrelatedissues.
(v) Contractor’sAuthorisedUpdatedComplianceListonOSHLegislationandOtherRelatedRequirements.
44
(vi) ListofProhibitedfoodsanddrinksincludingdrugsandmedicine.
(vii) ListofSafetyandPersonalProtectiveEquipmentatrequiredatworkplace.
(viii) ScheduleofOSHTrainingsandProgrammestoallworkmenincludingsub-Contractor:Safety andHealth Induction,CIDBGreenCard, FirstAid,Housekeeping,Working atHeight, Manual Handling, Vector Control, Health & Hygiene Program Site SafetyInspectionandAudit,ProvisionofInformation(poster/pamphlet/noticeboard).
(ix) EmergencyResponsePlan:Emergencyroutesandassemblypoint,emergencycontactlist,evacuationdrill,emergencyrespondteam,facilitiesandwelfares,andemergencyevacuationplan.
(x) SafeWorkSystemonTemporaryElectricity InstallationWorks.Thespecificationmustincludeadesignatedpersonincharge,approvedlistofmaterialsused,referencesandadvisedbyTNBorotherauthoritiesasacasemaybe(ifnecessary)onprohibitionondangerorillegalinstallation.
(xi) SafeOperationalProceduresformethodofstatementsforthefollowingnatureofworks:
a. Stabilityofstructureswhilst carryingoutconstructionwork, including temporarystructuresandexistingunstablestructures,
b. Preventingfalls,
c. Workwithornearfragilematerials,
d. Controlofliftingoperations,
e. Themaintenanceofplantandequipment(asinterpretbyOSHA1994),
f. Workonexcavationsandworkwheretherearepoorgroundconditions,
g. Workonwells,undergroundearthworksandtunnels,
h. Workinvolvingexplosives,
i. Masonryworks,
j. Servicesworks.
(xii) Format of Incident investigation (nearmiss, dangerous occurrence, accident, fatality,occupationalpoisoningandoccupationaldisease).
(xiii) Format ofSafety andHealthPerformanceand IncidentStatistics.DailyReporting onIncidentStatistic.
(xiv) ChemicalSafetyDataSheetsorMaterialSafetyDataSheets.
(xv) HealthPrecautiononworkmen:MedicalReport(HealthSurveillance),noisemonitoring.
(xvi) ProvisionofWelfareFacilities(Sanitationforworkmen).
(xvii) ProvisionofSafetySignageandTrafficControl.
(xviii) ProvisionofProjectHazardIdentification,RiskAssessmentandRiskControl(HIRARC).
S&HPlanshallbepreparedandreviewedbyProjectManagerandapprovedbyProjectDirectorwiththedateandversiononthecoverpage.ItcanbepreparedinBahasaMalaysiaorEnglish
55
2.3 OSH Personnel
TheContractorshallemploysafetypersonnelsuchasSHO/SSS/CSS/DP(asthecasemaybe)asperrequirementoftherelevantAct/RegulationsunderthejurisdictionofDOSH.
a) SafetyandHealthOfficer
(i) ForaprojectvalueofmorethanRM20million,theContractorshallemployafulltimecompetentpersontoactasaSafetyandHealthOfficerattheplaceofworkthroughouttheentirecontractperiod.
(ii) TheSafetyandHealthofficershallbeemployedexclusively for thepurposeofensuringthedueobservanceoftheprovisionsoftheActattheplaceofworkandanyother regulationmade therein including thepromotionof a safeworkplaceconduct.
(iii) The Contractor shall comply with Occupational Safety and Health (Safety andHealthOfficer)Order 1997,Order I and II on any contract value that exceedsRM20millionorwithhighrisk.AsstipulatedinthisOrder,theMainContractor(s)shallensuretheirsub-Contractor(s)employaSafetyandHealthOfficer(SHO).
Notes:ForHighRiskdefinitions,kindlyrefertoCIS25:2018
b) Site Safety Supervisor
SiteSafetySupervisor(SSS)tobestationedminimum15hoursaweekthroughouttheentireperiodoftheconstructionworks.
c) Contractor Safety Supervisor
EverySubcontractor inchargeofworksitewhoemploysmorethan20personsshallappointContractorSafetySupervisor(CSS)tobestationedminimum5hoursaweek.
d) Designated person
ContractorshallappointdesignatedpersoninaccordancetotherequirementofFactoriesandMachinery(BOWEC)(S)1986Regulations.
2.4 Safety And Health Committee
TheContractorshallestablishasafetyandhealthcommitteeattheplaceofworkif-
(i) Therearefortyormorepersonsemployedattheplaceofwork;or
(ii) TheDirectorGeneraloftheDepartmentofOccupationalSafetyandHealthdirectstheestablishmentofsuchacommitteeattheplaceofwork.
Thecompositionofasafetyandhealthcommitteeestablished,theelectionorappointmentofpersonstothecommittee,thefunctionofthecommittee,thepowersofthemembersofthecommitteeandanyothermatterrelatingtotheestablishmentorprocedureofthecommitteeshallbeasprescribedinPARTIIoftheOccupationalSafetyandHealth(SafetyAndHealthCommittee)Regulations1996.
2.5 Safety And Health Training
Programsfortheeducationandtrainingofemployeesintherecognition,avoidanceandpreventionofunsafeconditionsinemploymentscoveredbytheOccupationalSafetyandHealthAct1994(Act514)andFactoriesandMachineryAct1967(Act139)andotherrelevantregulationsshallbeestablishedandimplemented.
66
EveryconstructionpersonnelworkingatsitearerequiredtoobtainCIDBGreenCardbyattendingtheCIDBS&HInductionCourse.
Allconstructionpersonnel,Visitors,Vendors&Suppliersenteringworksiteare:
(i) Required to attend Site Safety Induction courses if required to enter an operationalconstructionzone;
(ii) Shallbeaccompaniedbycompanyappointedsitepersonnelwhileonthesite.
2.6 HazardsIdentificationRiskAssessmentAndRiskControl(HIRARC)
TheContractor shall identify potential hazards to employees or, assess their risk, or likelihood ofhappeningandtheeffectstheywouldhave,andthetakingofnecessarycontrolmeasuresforsuchhazards.
RecordsofHIRARCshallbekept,maintainedandsubmittedtotheS.O/PDpriortocommencementofthework.HIRARCmaybereviewedduringthecourseofworkasrequired
ThemethodologyproposedintheCIS25:2018GuidelinesforConstructionActivityRiskAsessment(CARA-HIRARC)publishedbyCIDBMalaysia.
2.7 Safety And Health Performance Report
Five(5)copiesmonthlysafetyandhealthperformancereportshallbepreparedandsubmitedtotheS.O.Thereportshallalsodescribethefollowings:
(i) Related OSH programme (toolbox meeting/ training/ drill/ inspection/ induction/housekeeping/audit/legislationcomplied/etc).
(ii) Incidentstatisticfromdailynotificationofanyaccidents,nearmisses,losttimeinjuries,death and ill-health with actions taken; in accordance with Occupational SafetyAndHealth (Notification ofAccident, DangerousOccurrence,Occupational Poisoning andOccupationalDisease)Regulations2004.
(iii) RelatedOSHissuesoncomplaints/Non-compliance/damagesandactionstaken.
(iv) StatusonS&HPlanandHIRARC.
(v) CIDBGreenCardrecords/Machineriesregisterandmaintainancerecords.
(vi) Trafficandotherrelatedsafetycontrol.
Provisionandmaintenanceofsafetyandhealthstatisticscoreboardshallbeprovidedtoensurethatpersonsatsiteareatleastinformedaboutthesafetyandhealthactivities.Theboardsshallbelocatedattheentranceofsiteoffice/workplaceorpracticablelocations.
2.8 Safety And Protective Equipment
Employeesarerequiredtowearappropriatepersonalprotectiveequipment inalloperationswherethereisriskofexposuretohazardousconditionsasperapprovedHIRARC.
ProvisionandmaintenanceofPersonalProtectiveEquipmenttoemployeesandsitestaffatsiteofadequatequantityandshallmeettherequirementsandspecificationsasapprovedbyS.O/PD.Theequipmentshallincludebutnotbelimitedtothefollowing:
(i) FootProtection
(ii) Safetyhelmets
77
(iii) Harness,lanyards,andlifelines(forworkmenwhoworkatheightsmorethan2mabovegroundlevel)
(iv) Protectivegloves
(v) Safetygoggles
(vi) Safetyjacketsofreflectivetype
(vii) Earplugsandmuffs
(viii) Gasmasks
(ix) Dustmasks
(x) Headlamp
(xi) Lifejacket
(xii) Laserprotection
(xiii) Protectionagainstradiantenergy
Provision and maintenance on the site during the entire contract period, of the adequate safetyequipmentshallmeettherequirementsandspecificationsintheasapprovedbyS.O/PD:
(i) Gasdetectors(ApplyforWorksinconfinedspacesonly)
(ii) Breathingapparatus
(iii) Airventilationpumps
(iv) Adequatelightingandwarninglamps
(v) Fireextinguishers
(vi) Hazardtape
(vii) Safetybarriers
(viii) Safetynet
2.9 Health and Welfare Provision
To conduct Health Measurements (if necessary) by designated / competent person (example:OccupationalHealthDoctor/MedicalPractitioner).MedicalReport(MedicalSurveillance)ofworkmentoberecordedbytheContractor(employer/self-employedperson)fortheWorksexposedtochemicalsand hazardousworking area as listed inOccupational Safety andHealth (Use andStandards ofExposureofChemicalsHazardoustoHealth)Regulations2000.
Firstaidfacilities
(i) TheContractor shall require to provide and properlymaintained a completeFirst aidfacilitiesandprovisionsformedicalcareavailableforeveryemployeeperformingworkatthesitewhichincludeprovisionoffirstaidkitandfirstaiderthroughoutthecontractperiod.
(i) Regulations prescribing specific requirements for first aid inFactories andMachinery(Safety,HealthandWelfare)Regulations1970shallbefollowed.
88
TheContractormustrefrainfromdumpingor/anddepositing(thatcapableofcollectingwater)whichafford breeding places for mosquitoes (including houseflies, rats, insects and other dangerousanimals).Allexcavationandanyportionofthesitewherewaterstagnatesoraccumulatesshallbekeptdrybypumping,bailingorotheroperations(vectorcontrol).ThecontractorshallpayallchargesasmayberequiredbytheMOH/LocalAuthorityandemploywhateverdestructivemeasuresasarenecessaryentirelyathisowncostandexpense
All Work shall be carried out without unreasonable noise and dust suppression. The Contractorshall takingmeasures to ensure that all equipment,machinery and place ofWorks are in properworkingconditionsoastominimizetheamountofnoisegeneratedanddustsuppression.Wheneverhazardoussubstancessuchasdusts,fumes,mists,vapours,orgasesexistorareproducedinthecourseofconstructionwork,theirconcentrationsshallnotexceedthelimitsspecifiedintheAct.TheS.O/P.DmayrequiretheContractortoreplaceanymachineryandequipmentaswellasmethodofstatementsthattohisdiscretion,isemittingexcessivenoiseanddust.
To conduct Health Measurements (if necessary) by designated / competent person (example:OccupationalHealthDoctor/MedicalPractitioner).MedicalReport(MedicalSurveillance)ofworkmentoberecordedbytheContractor(employer/self-employedperson)fortheWorksexposedtochemicalsand hazardousworking area as listed inOccupational Safety andHealth (Use andStandards ofExposureofChemicalsHazardoustoHealth)Regulations2000.
Construction areas shall be lighted to not less than the minimum illumination intensities as perregulation29FactoriesandMachineryAct1967.Emphasisshallbegiventostairways,accessesandemergencyescaperoutes.
TheContractorshallprovideandmaintaintemporaryaccommodationinaccordancetoMS2593:2015-Temporaryconstructionsiteworkers’amenitiesandaccommodation–Codeofpractice.
TheContractorshallprovideandmaintaineddesignatedrestarea/areasforworkersandsitestaff.Theareasprovidedshallbesafe,ventilatedandlighted.
The Contractor shall provide adequate temporary toilet and bathing place with necessary water,septictankanddrainageinaccordancetoRegulation37SHWelfareRegulationsunderFMA1967,DepartmentofEnvironment(DOE)or/andLocalAuthorityrequirements. Itshallbemaintained inacleanandsanitaryconditionatalltimestothesatisfactionoftheS.O/P.D/MOH/LocalAuthority.Allwastewatermustbetreatedsuchthatitseffluentmeetstherequirements.
2.10 Safe Working Area
Allow for compliance with Guidelines for Public Safety in Construction published by DOSH. TheContractorshallstoreorstackatalltimes,allmaterials,tools,etcaslistedbelowinasafeandorderlymannersoasnotobstructanypassagewayorplaceofwork.
(i) Shedforstorageofcementwiththefloorraised300mmabovetheground.
(ii) Shedforbar-bendingandsimilarWorks
(iii) Storeforchemical/hazardoussubstance
(iv) Storeforotherbuildingmaterials
TheContractorshallsupply,erect,maintaintheperimeterhoardingtoensurepublicsafety.
Erection,dismantling,alterationandmaintenanceofscaffoldingshallcomply toBS1139MS1462,workingplatformandsafetynettingsshallbeunderthesupervisionofthecompetentperson.
Catchplatformshallbedesignedbyprofessionalengineerwithpractisingcertificate(PEPC)whereitinvolveddemolitionofstructureorotherrelatedexteriorworksatmorethan12mheight.
Contractorshallerectandmaintainoverheadprotection/fencing/guardrails/safetyscreen/wirenetting/toeboard/safetybarricadestoensuresafeworkingenvironment.
99
Contractor shall providepersonal fall arrest systemsasper requiredunder theGuidelines for thePreventionofFalls atworkplaces2007 issuedbyDOSH.Provision,maintenanceand removal ofguardrailsorboard fencesand temporary footwalkswithadequateoverheadprotection forpublicwalkwaysandthoroughfares(pleasedeletewherenotapplicable)duringtheworks.
Cordoningoffworkingareaandprovisionofpubliccontrolandsafetymeasureswhereliftingoperations,moving,shifting,transferringworksarecarriedoutoutsidethehoardedupareaoftheworksite.
2.11 TrafficManagement
Provisionof traficmanagementplan, trafficmanagement safety report andadequate safety trafficwarningsignages,warninglights,flagmenshallcomplytoNotaTeknikJalanJKRNo.23/2003,ArahanTeknikJalan2C/85tobeprovidedandmaintainedbydesignatedpersonatsuitablelocationsforworkplaceincloseproximityofpublicthroughouttheentireperiodofconstructionworks.
2.12 Special Working Conditions
Specialattentionshallbegiventothefollowingworkingconditionbythecontractor:
(i) Working in confined space shall comply with the requirements of Industry Code ofPracticesforSafeWorkinginaConfinedSpace,2010,OccupationalSafetyandHealthrequirementsstatedinlaws,regulationsincludinganyrevisionstothecurrentregulations.
(ii) ForworkingatheightContractorshallcomplytherequirementofCIS15:2019GuidelinesofPreventionofFallatConstructionsSite.
(iii) Allexcavationworksshallcomplywith theprovisionofPARTXIIof theFactoriesandMachinery (Building Operation and Works of Engineering Construction) (Safety)Regulations,1986.
(iv) All demolitionworks shall complywith theprovisionofPARTXI of theFactoriesandMachinery (Building Operation and Works of Engineering Construction)(Safety)Regulations,1986andtheMS2318:2010DemolitionofBuildings-Codeofpractice.
(v) All blasting works shall comply with the provision of PART XV of the Factories andMachinery (Building Operation and Works of Engineering Construction)(Safety)Regulations,1986,Act207ExplosiveAct1957andotherregulatoryrequirements
(vi) WorkingOverorNearWater
a) Employeesworkingoverornearwater,wherethedangerofdrowningexists,shallbeprovidedwithapprovedlifejacketorbuoyantworkvests.
b) Priortoandaftereachuse,thebuoyantworkvestsorlifepreserversshallbeinspectedfordefectswhichwouldaltertheirstrengthorbuoyancy.Defectiveunitsshallnotbeused
c) Ringbuoyswithat least27.5metreof lineshallbeprovidedandreadilyavailable foremergencyrescueoperations.Distancebetweenringbuoysshallnotexceed61metre.
d) Atleastonelifeboatshallbemadeavailableatlocationswhereemployeesareworkingoveroradjacenttowater.
2.13 Access and Egress
TheContractorshallprovideallnecessarypersonnelandlightingforthesecurityofthesiteatalltimesuntilcompletionofthewholeWorks.
Ineverybuildingorstructureentranceandexitsshallbesoarrangedandmaintainedastoprovidefreeandunobstructedaccessandegressfromallpartsofthebuildingorstructureatalltimeswhenit isoccupied.No lockor fastening toprevent freeescapefromthe insideofanybuildingshallbe
1010
installedexceptinmental,penal,orcorrectiveinstitutionswheresupervisorypersonneliscontinuallyondutyandeffectiveprovisionsaremadetoremoveoccupantsincaseoffireorotheremergency.
Exits shall be marked by a readily visible sign.Access and egress to entrances and exits shallbemarkedbyreadilyvisiblesigns inallcaseswheretheentranceorexitorwaytoreach it isnotimmediatelyvisibletotheoccupants.
Meansofaccessandegressshallbecontinuallymaintainedfreeofallobstructionsorimpedimentstofullinstantuseinthecaseoffireorotheremergency.
2.14 Plant and Machinery
TheContractorshallensurethefollowingplantsobtainavalidcertificationwhicharedeemedtobeincompliancewiththerequirementsbytheDepartmentofOccupationalSafetyandHealthMalaysiabeforetheyarebeingputintooperation:
(i) Compressor
(ii) TowerCrane
(iii) Derrick
(iv) MobileCrane
(v) MaterialHoist
(vi) PassengerHoist
(vii) Gondola
2.15 Temporary Works by Designer
ThefollowingtemporaryworksshallbedesignedandendorsebyProfessionalEngineerwithpractisingcertificateappointedbythecontractortoensurethesetemporarystructuresaresafeandwithoutriskandaspertherequirementofFactoriesandMachinery(BOWEC)(S)1986Regulations.
(i) Formworkandreshores
(ii) Scaffolding
(iii) Catchplatform
(iv) Constructionrubbish/debrisdisposalchuteexceeding12metresinheight
(v) Runwaysandrampsusedbyvehicles
(vi) Supportforstabilityofstructurewhereadjoiningareatobeexcavatedorpiled
(vii) Loadingplatform
(viii) MaterialandPassengerhoist
(ix) Gondola
(x) Towercranefoundation
1111
ANNEX A
OCCUPATIONAL SAFETY AND HEALTH BILL OF QUANTITY
ITEM DESCRIPTION UNIT QTY RATE (RM)
AMOUNT (RM)
OCCUPATIONAL SAFETY & HEALTH
A Preparationof5copiessitesafetyandhealthplan(S&HPlan)asperitem2.2ofthespecificationforOSHConstructionWorksinCIS27:2019
Nos 5
B Employment of safety personnel as per item 2.3ofthespecificationforOSHConstructionWorksinCIS27:2019
i) SafetyandHealthOfficer Man/month
ii) SiteSafetySupervisor Man/month
iii)ContractorSafetySupervisor Man/month
iv)DesignatedPerson Man/month
C EstablishmentofaSafetyandHealthCommitteeatplaceworkasperitem2.4ofthespecificationforOSHConstructionWorksinCIS27:2019
Month
D Provisionofsafetyandhealthtrainingasperitem2.5ofthespecificationforOSHConstructionWorksinCIS27:2019
Nos
E
Preparation of Hazard Identification RiskAssessment and Risk Control (HIRARC) for theactivitiescarriedoutatsiteasper item2.6of thespecificationforOSHConstructionWorksinCIS27:2019
Item
F Preparationof5copiesSafety&HealthPerformanceReportasperitem2.7ofthespecificationforOSHConstructionWorksinCIS27:2019
Monthly 5
G Provisionforsafetyandprotectiveequipmentasperitem2.8ofthespecificationforOSHConstructionWorksinCIS27:2019andasapprovedbyS.O
▪ Safetyfootware Pairs
▪ Safetyhelmets Pcs
▪ Full Body Harness c/w Hook and Lankyard forworkmen who work at heights more than 2mabovegroundlevel
Pcs
▪ Safety/lifelinesforworkmenwhoworkatheightsmorethan2mabovegroundlevel
Meter
▪ Protectivegloves Pairs
▪ Safetygoggles Pairs
TO COLLECTION (RM)
1212
ITEM DESCRIPTION UNIT QTY RATE (RM)
AMOUNT (RM)
▪ Safetyjacketsofreflectivetype Pcs▪ Earplugsandmuffs Pairs▪ Gasmasks Set▪ Dustmasks Pcs▪ Headlamp Pcs▪ Lifejacket Pcs▪ Laserprotection Pcs▪ Protectionagainstradiantenergy Pcs▪ (anyadditionalanddeletewherenotapplicable…etc.)
H Provisionforhealthandwelfareasperitem2.9ofthespecificationforOSHConstructionWorksinCIS27:2019▪ WorkersAccomodation Item▪ FirstAidFacilities Item▪ RestArea Item▪ Toilet Item▪ otherhealthandwellfarefacilitiestobespecified Item...........................................................................................................................................................................
I Allow for compliance to safeworking area as peritem2.10ofthespecificationforOSHConstructionWorksinCIS27:2019i) Supply erection, maintenance and removal on
completionoftheworks,protectiveandsecurityhoarding as stipulated in Specification ForOccupational Safety And Health For BuildingConstructionWorks.
Item
ii) Supply,erectionanddismantlingofscaffolding,working platform with safety nettings bycompetent person(s) under the directsupervisionofadesignatedpersonasstipulatedin Specification For Occupational Safety AndHealthForBuildingConstructionWorks.
Item
iii)Submission of scaffolding design and workingplatform for works above 15m height certifiedby aProfessional Engineer for the approval oftheS.O./P.D.asstipulatedinSpecificationForOccupational Safety And Health For BuildingConstructionWorks.
Item
iv)Supply, erection, maintains and dismantling ofcatchplatformduringdemolitionofstructureorother related exterior works atmore than 12mheight. Such platform shall be designed by aProfessional Engineer and certified for safetyprior to erection as stipulated in SpecificationForOccupationalSafetyAndHealthForBuildingConstructionWorks.
Item
TO COLLECTION (RM)
1313
ITEM DESCRIPTION UNIT QTY RATE (RM)
AMOUNT (RM)
v) Supply erection, maintenance and removalof safety barricades / fencing / railing / screen/ wire netting / toe board for maintaining safeworking environment (please delete where notapplicable)duringtheworks.
Item
vi)Provision,maintenanceandremovalofguardrailsorboard fencesand temporary footwalkswithadequate temporary overhead protection forpublic walkways and thoroughfares (pleasedeletewherenotapplicable)duringtheworks.
Item
vii)Cordoning off working area and provision ofpubliccontrolandsafetymeasureswhereliftingoperations,moving, shifting, transferring worksarecarriedoutoutside thehoardedupareaofthe worksite as stipulated in Specification ForOccupational Safety And Health For BuildingConstructionWorks.
Item
J Provisionoftrafficmanagementplan/schemeasperitem2.11ofthespecificationforOSHConstructionWorksinCIS27:2019
Item
K Allow for compliance to special working conditionas per item 2.12 of the specification for OSHConstructionWorksinCIS27:2019
Item
L Provisionforaccessandegressasperitem2.13ofthespecificationforOSHConstructionWorksinCIS27:2019
Item
M Provisionforplantandmachineryasperitem2.14ofthespecificationforOSHConstructionWorksinCIS27:2019
Item
N Provision for temporaryworks by designer as peritem2.15ofthespecificationforOSHConstructionWorksinCIS27:2019
Item
TOTAL CARRIED TO SUMMARY TENDER (RM)
1414
Acknowledgement
Construction Industry Development Board, Malaysia would like to extend our sincere appreciationto all those involved in the development of this Standard.
Advisor of Construction Industry StandardDato’ Ir.Ahmad ‘AsriAbdul Hamid Chief ExecutiveCIDBMalaysia
Chairman of Construction Industry Standard Main CommitteeDatuk Ir. Elias Ismail SeniorGeneralManager CIDBMalaysia
Technical Committee
Ir.MRamuseren (Chairman)
MuhammadSyaifulAhdat(Secretary)
Construction Industry Development BoardMalaysia
NorZamzuriBinMdNor
AzmanBinHussain
Department of Occupational Safety &HealthMalaysia
MaizaliHalilBinGhazali JabatanKerjaRaya(JKR)
EngkuMuhammadAzlanBinCheEngkuHusin JabatanPengairandanSaliran(JPS)
NurFarahahBintiCheNu LembagaLebuhrayaMalaysia(LLM)
SrSyedAbdulHarisBinSyedMustapa RoyalInstitutionofSurveyorsMalaysia(RISM)
Ir.KuahKeeHong
MohdAzharBinMdHadzari
AssociatonofConsultingEngineersMalaysia(ACEM)
DatukSSivanyanam RealEstate&HousingDevelopmentAssociation(REHDA)
JafriMerican MalaysianInstituteofArchitects(PAM)
MohdYusofBinKasiron MasterBuilderAssociationMalaysia(MBAM)
MazlanBinIsmail ToklanOSHServices
Assoc.ProfSrDrFaridahBintiIsmail UniversitiTeknologiMARA(UiTM)
15
iii
iv
ISBN:978-967-0997-74-2
Top Related