3353 Peachtree Road NE
Suite 600, North Tower Atlanta, GA 30326
404-446-2560 | www.nerc.com
Standard Drafting Team Rosters
November 2013
1 NERC Standard Drafting Team Rosters – November 2013
Table of Contents
Project 2012-05 ATC Revisions Standard Drafting Team .................................................... 2
Project 2010-14.1 Balancing Authority Reliability-based Controls, Phase 1: Reserves Standard Drafting Team ...................................................................................................... 3
Project 2010-14.2 Balancing Authority Reliability-based Controls, Phase 2 Standard Drafting Team ..................................................................................................................... 4
Project 2013-01 Cold Weather Preparedness Standard Drafting Team............................. 5
Project 2008-12 Coordinate Interchange Standard Drafting Team.................................... 6 Project 2010-17 Definition of Bulk Electric System Standard Drafting Team .................... 7
Project 2010-04 Demand Data (MOD C) Standard Drafting Team ..................................... 8
Project 2009-01 Disturbance and Sabotage Reporting Standard Drafting Team............... 9
Project 2007-11 Disturbance Monitoring Standard Drafting Team ................................. 10
Project 2010-02 FAC Five-Year Review Team ................................................................... 11
Project 2007-09 Generator Verification Standard Drafting Team .................................... 12
Project 2013-03 Geomagnetic Disturbance Mitigation Standard Drafting Team ............ 13
Project 2010-03 Modeling Data (MOD B) Standard Drafting Team ................................. 14
Project 2007-02 Operating Personnel Communications Protocols Standard Drafting Team ................................................................................................................................. 15
Project 2007-17 Protection System Maintenance and Testing Standard Drafting Team 16
Project 2010-05-1 Protection Systems, Phase 1: Misoperations Standard Drafting Team........................................................................................................................................... 18
Project 2007-03 Real-Time Operations Standard Drafting Team ..................................... 19
Project 2010-13.2 Phase 2 of Relay Loadability: Generation Standard Drafting Team.... 20
Project 2006-06 Reliability Coordination Standard Drafting Team .................................. 21
Project 2007-06 System Protection Coordination Standard Drafting Team .................... 22
Project 2010-01 Training (PER) Standard Drafting Team ................................................. 23
Project 2008-02 Undervoltage Load Shedding Standard Drafting Team ......................... 24
Project 2013-04 Voltage and Reactive Control (VAR) Standard Drafting Team ............... 25
NERC Standard Drafting Team Rosters – November 2013 2
Standard Drafting Team Rosters
Project 2012-05
ATC Revisions (MOD A) Standard Drafting Team
Chair Aaron Staley Orlando Utilities Commission
Vice Chair Michael Lowman Duke Energy
Member David Dockery AECI
Ryan Harrigill SPP
Marilyn Jayachandran PJM
Ross Kovacs Georgia Transmission Corporation
Sunish Mathew Southern Company
Tung Nguyen MISO
Dede Subakti CAISO
James Randall BPA
Phillip Shafeei Colorado Springs Utilities
NERC Staff Ryan Stewart – Standards Developer North American Electric Reliability Corporation
Valerie Agnew – Director of Standards Development
North American Electric Reliability Corporation
3 NERC Standard Drafting Team Rosters – November 2013
Project 2010-14.1 Balancing Authority Reliability-based Controls, Phase 1: Reserves
Standard Drafting Team
Chair Glenn Stephens Santee Cooper
Vice Chair Thomas W. Siegrist Brickfield Burchette Ritts and Stone, PC
Member Gerald D. Beckerle Ameren Services
Howard F. Illian Energy Mark, Inc.
David F. Lemmons Xcel Energy, Inc.
Clyde Loutan California ISO
David McRee Duke Energy Carolina
H. Steven Myers Electric Reliability Council of Texas, Inc.
LeRoy Patterson Patterson Consulting
Michael Potishnak Representing NPCC
Mark Prosperi-Porta British Columbia Transmission Corporation
Jerry Rust Northwest Power Pool
Stephen Swan Midwest ISO, Inc.
Thomas Washburn Florida Municipal Power Pool
NERC Staff Darrel Richardson – Standards Developer
North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – November 2013 4
Project 2010-14.2 Balancing Authority Reliability-based Controls, Phase 2
Standard Drafting Team
Chair Doug Hils Duke Energy
Vice Chair Thomas W. Siegrist Brickfield Burchette Ritts and Stone, PC
Member Scott Brooks Manitoba Hydro
Ron Carlsen Southern Company
Howard F. Illian Energy Mark, Inc.
Mike Potishnak Representing NPCC
Jerry Rust Northwest Power Pool
Robert Staton Xcel Energy
Glenn Stephens Santee Cooper
Stephen Swan Midwest ISO, Inc.
Mark Trumble Omaha Public Power District
NERC Staff Sean Cavote (Lead Standards Developer)
North American Electric Reliability Corporation
Laura Anderson (Supporting Standards Developer)
North American Electric Reliability Corporation
Stephen Crutchfield (Supporting Standards Developer)
North American Electric Reliability Corporation
Mallory Huggins (Supporting Standards Developer)
North American Electric Reliability Corporation
Laura Hussey (Director of Standards Development)
North American Electric Reliability Corporation
5 NERC Standard Drafting Team Rosters – November 2013
Project 2013-01 Cold Weather Preparedness
Standard Drafting Team
Chair Ed Schnell American Electric Power
Vice Chair Matt Averett Southern Company
Member Jason Fisher Minnesota Power
Mike Gentry Salt River Project
Kevin Lynch PSEG Power Fossil LLC
NERC Staff Barb Nutter – Standards Developer (Primary)
North American Electric Reliability Corporation
Scott Barfield – Standards Developer (Backup)
North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – November 2013 6
Project 2008-12 Coordinate Interchange Standard Drafting Team
Chair Cheryl Mendrala ISO New England
Vice Chair Robert Harshbarger Puget Sound Energy, Inc.
Member Clint Aymond Entergy Services, Inc.
David McRee Duke Energy
Joel Mickey Electric Reliability Council of Texas, Inc.
Christopher Pacella PJM Interconnection
Mary Willey Bonneville Power Administration
NERC Staff Stephen Crutchfield – Standards Developer
North American Electric Reliability Corporation
Laura Hussey – Director of Standards Development
North American Electric Reliability Corporation
Mallory Huggins – Standards Developer
North American Electric Reliability Corporation
Sean Cavote – Standards Developer North American Electric Reliability Corporation
7 NERC Standard Drafting Team Rosters – November 2013
Project 2010-17 Definition of Bulk Electric System
Standard Drafting Team
Chair Peter Heidrich – Manager of Reliability Standards
Florida Reliability Coordinating Council
Vice Chair Barry R. Lawson – Associate Director, Power Delivery & Reliability
National Rural Electric Cooperative Association
Member Jennifer Dering – Manager Operations Planning, Transmission
New York Power Authority
Brian Evans-Mongeon – President and CPO
Utility Services, Inc.
Philip A. Fedora – Assistant Vice President, Reliability Services
NPCC
Ajay Garg – Manager, Policy and Approvals
Hydro One Networks, Inc.
John Hughes – Vice President, Technical Affairs
Electricity Consumers Resource Council (ELCON)
Jeff Mitchell – Director, Engineering RFC
Rich Salgo – Director, Electric System Operations
NV Energy
Jason Snodgrass – Regulatory Compliance Manager
Georgia Transmission Corporation
Jennifer T. Sterling, P.E. – Director, Transmission Strategy and Compliance
Exelon
Jonathan Sykes – Manager, System Protection
Pacific Gas & Electric
NERC Staff Edward J. Dobrowolski – Standards Developer
North American Electric Reliability Corporation
Stacey Tyrewala – Attorney North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – November 2013 8
Project 2010-04 Demand Data (MOD C)
Standard Drafting Team
Chair Mark Kuras PJM
Vice Chair Josh Collins MISO
Member Paul Kure ReliabilityFirst Corporation
Brian Glover Great River Energy
Robert Emmert CAISO
Barbara Doland SERC
Andrey Oks NPCC
NERC Staff Darrel Richardson – Standards Developer
North American Electric Reliability Corporation
9 NERC Standard Drafting Team Rosters – November 2013
Project 2009-01 Disturbance and Sabotage Reporting
Standard Drafting Team
Chair Brian Evans-Mongeon Utility Services, Inc
Vice Chair Joseph G. DePoorter – Reliability Compliance Manager
Madison Gas and Electric Co.
Member Chris Boucher BC Transmission Corporation
Michelle Draxton Constellation Energy Group
James E. Hartmann, Jr. – Supervisor, System Operations
Electric Reliability Council of Texas, Inc.
Thomas M. Moleski – Senior Analyst PJM Interconnection, L.L.C.
NERC Staff Bob Canada – CIP Cybersecurity Specialist
North American Electric Reliability Corporation
Stephen Crutchfield – Standards Developer
North American Electric Reliability Corporation
Brian Harrell – Associate Director of CIP Programs Division
North American Electric Reliability Corporation
Scott R. Mix – CIP Technical Manager North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – November 2013 10
Project 2007-11 Disturbance Monitoring Standard Drafting Team
Chair Lee Pedowicz NPCC
Member Frank Ashrafi Southern California Edison
Alan D. Baker Florida Power & Light
Daniel J. Hansen NRG
Tim Kucey PSEG Fossil LLC
H. Steven Myers ERCOT
Jack Soehren ITC Holdings
Vladimir Stanisic AESI Inc.
NERC Staff Barb Nutter – Standards Developer (Primary)
North American Electric Reliability Corporation
11 NERC Standard Drafting Team Rosters – November 2013
Project 2010-02 FAC Five-Year Review Team
Chair John Beck Con Edison
Vice Chair Michael Steckelberg Great River Energy
Member Brian Dale Georgia Power Company
Ruth Kloecker ITC Holdings
Stewart Rake Luminant Generation Company LLC
Ganesh Velummylum Northern Indiana Public Service Co.
NERC Staff Mallory Huggins (Lead Standards Developer)
NERC
Sean Cavote (Supporting Standards Developer)
NERC
Ed Dobrowolski (Supporting Standards Developer)
NERC
Laura Hussey (Director of Standards Development)
NERC
NERC Standard Drafting Team Rosters – November 2013 12
Project 2007-09 Generator Verification
Standard Drafting Team
Chair Lee Y. Taylor Southern Company Services, Inc.
Vice Chair Ken Stenroos Florida Power & Light Co.
Member Baj Agrawal Arizona Public Service Co.
Donald G. Davies Western Electricity Coordinating Council
Les Hajagos Kestrel Power Engineering Ltd
Gary Humphries Duke Energy Carolina
Venkat S. Kolluri Entergy Corporation
David Kral Xcel Energy, Inc.
Gary Kruempel MidAmerican Energy Co.
Daniel J. Leonard GE Energy
Jason MacDowell GE Energy
Craig Quist PacifiCorp
Balbir S. Sandhu Manitoba Hydro
William D. Shultz Southern Company
Vladimir Stanisic Ontario Power Generation Inc.
Chifong L. Thomas BrightSource Energy
David Thompson TVA
Edward J. Wingard American Electric Power
David Youngblood Luminant
Hamid Zakery Calpine Corporation
NERC Staff Stephen Crutchfield – Standards Developer
North American Electric Reliability Corporation
13 NERC Standard Drafting Team Rosters – November 2013
Project 2013-03 Geomagnetic Disturbance Mitigation
Standard Drafting Team
Chair Frank Koza PJM Interconnection
Vice Chair Randy Horton Southern Company
Member Donald Atkinson Georgia Transmission Corporation
Emanuel Bernabeu Dominion Resource Services, Inc
Kenneth Fleischer NextEra Energy
Luis Marti Hydro One Networks
Antti Pulkkinen NASA Goddard Space Flight Center
Qun Qiu American Electric Power
NERC Staff Mark Olson – Standards Developer North American Electric Reliability Corportation
NERC Standard Drafting Team Rosters – November 2013 14
Project 2010-03 Modeling Data (MOD B) Standard Drafting Team
Chair Bobby Jones Southern Company Services
Vice Chair Reené Miranda Xcel Energy, Inc.
Member Durgesh Manjure MISO
Kent Bolton WECC
Jeff Gindling Duke Energy
Wayne Haidle Basin Electric Power Cooperative
James Teixeira ERCOT
Catherine Wesley PJM Interconnection
NERC Staff Steven Noess – Associate Director of Standards Development
North American Electric Reliability Corporation
15 NERC Standard Drafting Team Rosters – November 2013
Project 2007-02 Operating Personnel Communications Protocols
Standard Drafting Team
Chair Lloyd S. Snyder – Manager, Transmission Operations
Georgia Systems Operations Corporation
Member Glen Boyle – Engineer/Instructor PJM Interconnection, LLC
Mike Brost – Vice President, Electric Systems
JEA
Michael Cassiadoro – Director of Reliability Coordination
WECC
Tom Irvine – Manager, Grid Operations
Hydro One Networks, Inc.
Robert C. Rhodes, Jr. – Manager, Reliability Standards
SPP
Stephen Solis – Planning and Operating Standards Compliance
Electric Reliability Council of Texas, Inc.
John Stephens – Director, Power System Control
City Utilities of Springfield
Fred Waites – Team Leader, Training Southern Company
NERC Staff Stephen Eldridge – Standards Developer
North American Electric Reliability Corporation
William Edwards – Attorney North American Electric Reliability Corporation
Marisa Hecht – Standards Developer North American Electric Reliability Corporation
Howard Gugel – Director of Standards Development
North American Electric Reliability Corporation
Larry J. Kezele – Manager of Operations
North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – November 2013 16
Project 2007-17 Protection System Maintenance and Testing
Standard Drafting Team
Chair Charles W. Rogers Consumers Energy
Member John Anderson Xcel Energy, Inc.
Rick Ashton Tri-State G & T Association
Bob Bentert Florida Power & Light Co.
Forrest Brock Western Farmers Electric Cooperative
Aaron Feathers Pacific Gas and Electric Company
Samuel Francis Oncor Electric Delivery
Carol Gerou, P.E. Midwest Reliability Organization
Russell Hardison, P.E. Tennessee Valley Authority
Ervin D. Harper NRG Texas Maintenance Services
James M. Kinney FirstEnergy Corporation
Mark Lukas Commonwealth Edison Co.
Kristina Marriott ENOSERV
Michael Palusso Southern California Edison
Mark Peterson Great River Energy
John Schechter American Electric Power
William D. Shultz Southern Company
Eric Udren Quanta Technology
Scott Vaughan City of Roseville
Matthew Westrich American Transmission Company
Philip B. Winston Southern Company
David Youngblood Luminant Power
John Zipp ITC Holdings
17 NERC Standard Drafting Team Rosters – November 2013
NERC Staff Al McMeekin – Standards Developer North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – November 2013 18
Project 2010-05-1 Protection Systems, Phase 1: Misoperations
Standard Drafting Team
Chair Mark J. Kuras PJM Interconnection, LLC
Member Martin Bauer, P.E. U.S. Bureau of Reclamation
Paul DiFilippo HydroOne Networks, Inc.
Mark Gutzmann Xcel Energy, Inc.
Ted Kramer Duke Energy
Bill Middaugh Tri-State G & T Association, Inc.
John W. Miller Georgia Transmission Corporation
Steve Paglow American Electric Power
Richard A. Purdy, PE Dominion Virginia Power
Tim Seeber ComEd/Exelon
Patrick Sorrells Sacramento Municipal Utility District
NERC Staff Scott Barfield-McGinnis – Standards Developer
North American Electric Reliability Corporation
19 NERC Standard Drafting Team Rosters – November 2013
Project 2007-03 Real-Time Operations
Standard Drafting Team
Chair James S. Case – Director, Weekly Operations
Entergy Services, Inc.
Vice Chair Karl Tammar – Transmission Operations Manager
Sharyland Utilities, L.P.
Member Albert DiCaprio – Strategist PJM Interconnection, L.L.C.
Jason L. Marshall, P.E. – Director, Reliability Compliance
ACES Power Marketing
H. Steven Myers – Principal, Operating and Planning Standards
Electric Reliability Council of Texas, Inc.
Gregory Van Pelt California ISO
NERC Staff Edward J. Dobrowolski – Standards Developer
North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – November 2013 20
Project 2010-13.2 Phase 2 of Relay Loadability: Generation
Standard Drafting Team
Chair Charles W. Rogers Consumers Energy
Member Jeff Billo ERCOT
S. Bryan Burch, P.E. Southern Company
Steven Hataway Florida Power & Light Co.
Jonathan E Hayes Southwest Power Pool, Inc.
Mike Jensen Pacific Gas and Electric Company
Sudhir Thakur, P.E. Exelon Nuclear
Joe T. Uchiyama U.S. Bureau of Reclamation
Benson Vuong Salt River Project
David Youngblood Luminant Energy
NERC Staff Scott Barfield-McGinnis – Standards Developer
North American Electric Reliability Corporation
21 NERC Standard Drafting Team Rosters – November 2013
Project 2006-06 Reliability Coordination Standard Drafting Team
Chair William Hardy Southern Company Services, Inc.
Member Earl A. Barber National Grid
James S. Case – Director, Weekly Operations
Entergy Services, Inc.
Albert DiCaprio – Strategist PJM Interconnection, L.L.C.
Anthony Jankowski – Manager, Electric System Operations
We Energies
H. Steven Myers – Manager of Operating Standards
Electric Reliability Council of Texas, Inc.
Robert C. Rhodes, Jr. – Manager, Reliability Coordination
Southwest Power Pool
Eric Senkowicz – Manager of Operations
Florida Reliability Coordinating Council
NERC Staff Scott Barfield-McGinnis – Standards Developer
North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – November 2013 22
Project 2007-06 System Protection Coordination
Standard Drafting Team
Chair Philip Winston Georgia Power Company
Vice Chair Bill Middaugh Tri-State G & T Association, Inc.
Member Forrest Brock Western Farmers Electric Cooperative
David Cirka National Grid
Samuel Francis Oncor Electric Delivery
Jeffrey Iler American Electric Power
William Waudby Consumers Energy
Kevin Wempe Kansas City Power & Light Co.
NERC Staff Al McMeekin – Standards Developer North American Electric Reliability Corporation
23 NERC Standard Drafting Team Rosters – November 2013
Project 2010-01 Training (PER)
Standard Drafting Team
Chair Patti Metro NRECA
Vice Chair Lauri Jones PG&E
Member Charles Abell Ameren
Sam Austin Tennessee Valley Authority
Jim Bowles ERCOT
Jeff Gooding Florida Power & Light Co.
Mark Grear Constellation
Venona Greaff OXY
John M. Rymer MISO
Stanley Winbush American Electric Power
NERC Staff Jordan Mallory – Standards Developer Specialist
North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – November 2013 24
Project 2008-02 Undervoltage Load Shedding
Standard Drafting Team
Chair Greg Vassallo Bonneville Power Administration
Member José Conto ERCOT
Bill Harm PJM
Sharma Kolluri Entergy
Charles-Eric Langlois Hydro-Quebec TransEnergie
Manish Patel Southern Company
Fabio Rodriguez Duke Energy
Hari Singh Xcel Energy
Matthew Tackett MISO
NERC Staff Erika Chanzes – Standards Developer North American Electric Reliability Corporation
Phil Tatro – Technical Advisor North American Electric Reliability Corporation
25 NERC Standard Drafting Team Rosters – November 2013
Project 2013-04 Voltage and Reactive Control (VAR)
Standard Drafting Team
Chair Bill Harm PJM Interconnection, L.L.C.
Vice Chair Martin Kaufman Exxon Mobil Research and Engineering
Member Joshua Pierce Southern Company Transmission Planning
Sharma Kolluri Entergy Services Inc.
Scott Berry Indiana Municipal Power Agency
Hari Singh Xcel Energy
Hamid Zakery Calpine Corporation
Steve Hitchens Bonneville Power Administration
Joe Seabrook Puget Sound Energy, Inc.
Brian Buckley TECO Energy
Mike Swearingen Tri-County Electric
NERC Staff Soo Jin Kim – Standards Developer North American Electric Reliability Corporation
Top Related