Sl No Activity Time Responsible From To Critical
Sampling and Approval
1.1 Issue of Tech Pack Merchandiser Merchandising PDM y
1.2 Verification of Tech Pack PDM PDM / IE Merchandising y
1.3 Confirmation of Tech Pack 1 PDM PDM / IE Merchandising y
1.4 IE / PDM y
2.1 1 pdm y
2.2 PDM/ QA PDM QA y
2.3 Prepare Sample - Proto 1 3 PDM PDM QA / Merchandising y
E.Start
Method Engg / discuss withproduction team
Pattern Receiving frombuyer / Design pattern from
tech. pack
Check pattern for spec. and
seam config. And marking
8/3/2019 Sop for Pattern
2/10
CP_procedures 2
Prepared by vengatramani 02/18/2012 Page 2
Sl No Activity Time Responsible From To CriticalE.Start
2.4 check sample QA/PDM y
2.5 Approval Sample - Proto 1 10 Merchandising Merchandising PDM y
3.1 pdm / QA Merchandising PDM y
3.2 PDM/ QA y
3.3 Prepare Sample - Proto 2 pdm y
3.4 check sample pdm / QA y
3.5 Approval Sample - Proto 10 merchandising Merchandising PDM y
4.1 seal the pattern and lock PDM/ QA y
4.2 Grading pattern pdm y
Incorporate Buyer`s commenton pattern
check pattern afterammenment
8/3/2019 Sop for Pattern
3/10
CP_procedures 2
Prepared by vengatramani 02/18/2012 Page 3
Sl No Activity Time Responsible From To CriticalE.Start
4.3 pdm y
4.4 Record Garment shrinkage PDM y
4.5 PDM stores pdm y
4.6 pdm y
4.7 check the nested pattern PDM/ QA y
4.8 seal the production pattern PDM/ QA y
5.1 pdm
5.2 cut / ratio plan planning planning pdm y
5.3 prepare marker pdm pdm manufacturing
prepare Jump size in nilpattern
Get fabric shrikage fromStores
Amend the pattern comparinggarment and fabric shrinkage
get fabric cuttable width fromStores
8/3/2019 Sop for Pattern
4/10
CP_procedures 2
Prepared by vengatramani 02/18/2012 Page 4
Sl No Activity Time Responsible From To CriticalE.Start
5.4 check the marker / confirm PDM/ QA
5.5 Release the marker pdm pdm manufacturing
6.1 manufacturing Merchandising manufacturing y
6.2 y
Preproduction Sample - SizeSet - In actual
Preproduction Sample-Approval - Size Set
Merchandising/QA
8/3/2019 Sop for Pattern
5/10
CP_procedures 2
Prepared by vengatramani 02/18/2012 Page 5
Sl No Activity Time Responsible From To CriticalE.Start
8/3/2019 Sop for Pattern
6/10
CP_procedures 2
Prepared by vengatramani 02/18/2012 Page 6
E.Fin
ish
L.St
art
L.Fin
ish
8/3/2019 Sop for Pattern
7/10
CP_procedures 2
Prepared by vengatramani 02/18/2012 Page 7
E.Finish
L.Start
L.Finish
8/3/2019 Sop for Pattern
8/10
CP_procedures 2
Prepared by vengatramani 02/18/2012 Page 8
E.Finish
L.Start
L.Finish
8/3/2019 Sop for Pattern
9/10
CP_procedures 2
Prepared by vengatramani 02/18/2012 Page 9
E.Finish
L.Start
L.Finish
8/3/2019 Sop for Pattern
10/10
CP_procedures 2
Prepared by vengatramani 02/18/2012 Page 10
E.Finish
L.Start
L.Finish
Top Related