johnjr
Text Box
Soil Runoff Area Unstablized Banks Under Construction
johnjr
Text Box
Loam and Seed w/Jute Netting
johnjr
Text Box
Stone Swale w/Straw Waddle Check Dams
johnjr
Text Box
Approx Location of CB on DOT ROW fitted with silt bag
johnjr
Text Box
3'x3' trench filled with traprock to Divert Runoff to Basin #2 from the existing roadway