Software Safety Risk Evaluation (SSRE)
Process
SAŠA ŠPILER
METHOD ENGINEERING
UTRECHT, APRIL 2014
Content
What is SSRE process?PhasesPDD and exampleRelated literature
Software Safety Risk Evaluation process
Represented in 2010 (18th IEEE International Requirements Engineering Conference)
Based on: SEI Software Risk Evaluation (SRE) developed in 1992
It is a process used for identification, analysis, consolidation and mitigation of software safety risks (Hill & Talley, 2010).
Software Safety Risk Evaluation process
SSRE USAGE:
4 projects at 3 NASA Centres
AUTHORS:
JANICE HILL
SCOTT TILLEY
Works at IV&V Facility at NASA
Professor of Software Engineering in a Department of Computer Sciences at Florida Institute of Technology
Phases
DetectionRisk
specification
Assessment Consolidation Mitigation
2 3 4 51
5
PDD
PHASE 1: DETECTION
ProjectProfile
Safety RelatedQuestions Risks
PHASE 2: RISK SPECIFICATION
Performance Support
Cost Schedule
Project Performance
Support Cost Schedule
ATCS 30 77 33 3
PHASE 3: ASSESSMENT
MAGNITUDE
1 7
Catastrophic
*
IMPACT
Critical
Marginal
Negligible
Likely
LIKELIHOOD
Probable
Possible
Unlikely
Improbable
RISKPROFILE
low high
PHASE 3: ASSESSMENT
Project
1 2 3 4 5 6 7
ATCS 20 23 29 33 16 6 1
low high
PHASE 4: CONSOLIDATION
Risk Candidates
Priority Ranking (1-5)
Project 1 2 3 4 5
ATCS 19 40 51 7 11
Safety Air Traffic Control Procedure
Restart Safety-Critical Assurance
System Hazard Analysis
PHASE 5: MITIGATION
IMPORTANCE
1.
2.
3.
RISK AREA
Related Literature
SEI safety requirements evaluation process
Legacy System Risk Database (LSRD) tool
Questions?