Download - Skyway Public Scoping Meeting Representative Concepts ......Exit 5. Exit 4 Exit 6.-+7 . Title: Skyway Public Scoping Meeting_Representative Concepts_Skyway Removal with new Tifft Street

Transcript
  • CONCEPT UNDER CONSIDERATION: SKYWAY REMOVAL WITH NEW TIFFT STREET ARTERIAL

    • Removes Skyway structure and elevated approaches between Tifft Street and Church Street

    • Extends Tifft Street on a new alignment with four lanes from the intersection at Rittling Boulevard, extending north parallel to Abby Street, and continuing along an old railroad right-of-way over the Buffalo River to I-190

    • Modifies I-190 interchange at Seneca Street (Exit 3)Removal of Skywaystructure and

    elevated approaches

    New arterial alignment

    South Park Ave.Ti�

    t St.

    Church St.

    Abby St.

    Rittling Blvd.

    Exit 3

    Ohio St.

    Seneca St.

    Seneca St.

    Elk St.Elk St.

    Church St.

    Ti�t S

    t.

    Abby St.

    Rittling Blvd.

    South Park Ave.

    190

    City Ship Canal

    City Ship Canal

    Bu�alo River

    Bu�alo River

    Ohio St.

    Clinton St.Clinton St.

    Exit 5

    Exit 4South Park Ave.South Park Ave.

    Exit 6

    Baile

    y A

    ve.

    Baile

    y A

    ve.