8/3/2019 Simulation Technique
1/54
1
SIMULATION
8/3/2019 Simulation Technique
2/54
3
SIMULATION vs. OPTIMIZATION
In an optimization model, the values of the decision
variables are outputs.
In a simulation model, the values of the decisionvariables are inputs. The model evaluates theobjective function for a particular set of values.
The result of the model is a set of values for thedecision variables that will maximize (or minimize)
the value of the objective function.
The result of the model is a measure of the qualityof a suggested solution and the variability in variousperformance measures due to randomness in the
inputs.
8/3/2019 Simulation Technique
3/54
4
When should simulation be used?
Simulation is one of the most frequently used tools of
quantitative analysis today because:
1. Analytical models may be difficult or impossible toobtain, depending on complicating factors.
2. Analytical models typically predict only average orsteady-state (long-run) behavior.
3. Simulation can be performed with a variety of
software on a PC or workstation. The level ofcomputing and mathematical skill required todesign and run a simulator has been substantiallyreduced.
8/3/2019 Simulation Technique
4/54
5
8. Experimental Design
9. Model runs and analysis
10. More runs
NoYes
3. Model conceptualization 4. Data Collection
5. Model Translation
6. Verified
7. Validated
Yes
No
No No
Yes
Phase 3
Experimentation
1. Problem formulation
2. Set objectives and overall project plan
Phase 1
Problem Definition
Phase 2
Model Building
11. Documentation, reporting and
implementation
Phase 4
Implementation
Steps in simulation
8/3/2019 Simulation Technique
5/54
6
Verification (efficiency)
Is the model correctly built/programmed? Is it doing what it is intended to do?
Validation (effectiveness) Is the right model built? Does the model adequately describe the reality
you want to model? Does the involved decision makers trust the
model?
Two of the most important and most challenging
issues in performing a simulation study
Model Verification and Validation
8/3/2019 Simulation Technique
6/54
7
Find alternative ways of describing/evaluating the system
and compare the results
Simplification enables testing of special cases with
predictable outcomes
Removing variability to make the model deterministic Removing multiple job types, running the model with one job type
at a time
Reducing labor pool sizes to one worker
Build the model in stages/modules and incrementally test
each module
Uncouple interacting sub-processes and run them separately
Test the model after each new feature that is added
Simple animation is often a good first step to see if things are working
as intended
Model Verification Methods
8/3/2019 Simulation Technique
7/54
9
Simulation and Random Variables
Simulation models are often used to analyze a decisionunder risk. Under risk, the behavior of one or morefactors is not known with certainty. For example:
demand for a product during the next month
the return on an investment
the number of trucks that will arrive to be unloaded
The factor that is not known with certainty is called therandom variable.
The behavior of the random variable can be describedby a probability distribution.
MONTE CARLO METHOD:
8/3/2019 Simulation Technique
8/54
10
Design of Docking Facilities. In the following model,trucks of different sizes carrying different types of loads,arrive at a warehouse to be unloaded.
Exit Entrance
Truck
Truck
Truck
Dock3
Dock2
Dock1
Truck waiting Truck waiting
8/3/2019 Simulation Technique
9/54
11
The uncertainties are:
When will a truck arrive?
What kind and size of load will it be carrying?How long will it take to unload the trucks?
Each uncertain quantity would be a random variable
characterized by a probability distribution.The planners must address a variety of designquestions:
How many docks should be built?What type and quantity of material-handlingequipment are required?
How many workers are required over what
periods of time?
8/3/2019 Simulation Technique
10/54
12
The design of the unloading dock will affect its cost ofconstruction and operation. Management must balancethe cost of acquiring and using the various resourcesagainst the cost of having trucks wait to be unloaded.
8/3/2019 Simulation Technique
11/54
13
Determination of Inventory Control Policies. Simulationcan be used to study inventory control models.
In this model, the factory produces goods that are sentto the warehouses to satisfy customer demand.
The random variables are: daily demand at eachwarehouse and shipping times from factory to
warehouse.
Factory
Warehouse 1 Warehouse 2 Warehouse 3
Demand Demand Demand
8/3/2019 Simulation Technique
12/54
14
Simulation can be used to study inventory controlmodels.
Some of the operational questions are:
The main costs are:
When should a warehouse reorder from thefactory and how much?
How much stock should the factory maintain tosatisfy the orders of the warehouses?
Cost of holding the inventory
Cost of shipping goods from a factory to a
warehouseCost of not being able to satisfy customerdemand at the warehouse
The objective is to find a stocking and ordering policythat keeps the total cost low while meeting demand.
8/3/2019 Simulation Technique
13/54
15
To generate a random variable, draw a random sample
from a given probability distribution.
Generating Random Variables
Two broad categories of random variables:
Can assume only certain specific values(e.g., integers)
Can take on any fractional value (an infinitenumber of values)
Continuous
Discrete
Using a Random Number Generator in a Spreadsheet
8/3/2019 Simulation Technique
14/54
16
To generate a discrete random variable with the RAND()function in a spreadsheet, two things are needed:
A GENERALIZED METHOD:
1. The ability to generate discrete uniform randomvariables
2. The distribution of the discrete random variable
to be generatedTo generate a continuous random variable, two thingsare needed:
1. The ability to generate continuous uniformrandom variables on the interval 0 to 1
2. The distribution (in the form of the cumulativedistribution function) of the random variable to
be generated
8/3/2019 Simulation Technique
15/54
17
Conversion of a Random No. to a Uniform Distribution
8/3/2019 Simulation Technique
16/54
18
200 Random Numbers Generated Between 0 and 100
8/3/2019 Simulation Technique
17/54
19
200 Uniform Discrete Random Numbers GeneratedBetween 20 and 100
Th C l i Di ib i F i (CDF) C id
8/3/2019 Simulation Technique
18/54
20
The Cumulative Distribution Function (CDF). Consider arandom variable, D, the demand. The CDF for D[calledF(x)] is then defined as the probability that Dtakes on avalue < x.
F(x) = Prob{D < x}
Knowing the probability distribution for D, the CDF for
key values of Dis:
X 8 9 10 11 12 13F(x) 0.1 0.3 0.6 0.8 0.9 1.0
H i h f h CDF T di
8/3/2019 Simulation Technique
19/54
21
0
0.2
0.4
0.6
0.8
1
1.2
7 8 9 10 11 12 13 14
Probability
x
F(x)
Here is a graph of the CDF. To generate a discretedemand using the graph:
Step 2: Read theparticular valueof the randomquantity, d, on
this axis
Step 1: Locatethe particularvalue of Uon
this axis
u
d
S t t d l di t if
8/3/2019 Simulation Technique
20/54
22
Suppose you want to model a discrete uniformdistribution of demand where the values of 8 through 12all have the same probability of occurring (uniform,equally likely).
The spreadsheet has a function, =RAND(), that returns arandom number between 0 and 1. However, this willresult in a continuous uniform distribution.
To create a discrete uniform distribution, use the INT()function. For example:
In general, if you want a discrete, uniform distribution ofinteger values between xand y, use the formula:
INT(x+ (yx+ 1)*RAND() )
G ti f th E ti l Di t ib ti
8/3/2019 Simulation Technique
21/54
24
Generating from the Exponential Distribution.The exponential distribution is often used to model thetime between arrivals in a queuing model. Its CDF isgiven by:
F(x) = Prob{t>T} = e-lT
Where 1/l is the mean of the random variable T.Therefore, we want to solve the following equation for w:
u = e-lT
The solution is: T = -1/l ln(u)where we can get u from Random number which
represents cumulative distribution function
G ti f th N l Di t ib ti
8/3/2019 Simulation Technique
22/54
25
Generating from the Normal Distribution.The normal distribution plays an important role in manysimulation and analytic models.
Consider drawing a random demand from a normaldistribution with a mean (m) of 1000 and a standarddeviation (s) of 100.If Z is a unit normal random variable (normallydistributed with a mean of 0 and a standard deviation of1) then m + Zs is a normal random variable with mean mand standard deviation s.So, we can draw from a unit normal distribution. Excelhas a built-in function that can do this:
= NORMINV( RAND() , 1000, 100)
Excel will automatically return a normally distributedrandom number with mean 1000 and std. dev. 100.
8/3/2019 Simulation Technique
23/54
26
CAPITAL BUDGETING
PROBLEM
A CAPITAL BUDGETING EXAMPLE
8/3/2019 Simulation Technique
24/54
27
A CAPITAL BUDGETING EXAMPLE:ADDING A NEW PRODUCT LINE
Airbus Industry is considering adding a new jet airplane
(model A3XX) to its product line. The following financialinformation is available:
Startup Costs $150,000Sales Price $ 35,000Fixed Costs (per year) $ 15,000Variable Costs (per year) 75% of revenues
Tax depreciation on the new equipment would be
$10,000 per year over the 4 year expected product life.
Salvage value of the equipment at the end of the 4 yearsis estimated to be 0.
Airbus cost of capital is 10% and tax rate is 34%.
If demand is known then a spreadsheet can be used to
8/3/2019 Simulation Technique
25/54
28
If demand is known, then a spreadsheet can be used tocalculate the net present value(NPV). For example,assume that the demand for A3XXs is 10 units for eachof the next 4 years:
=C16 + C13
=-$B$2
=NPV($D$3,C17:F17)+B17
THE MODEL WITH RANDOM DEMAND
http://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xls8/3/2019 Simulation Technique
26/54
29
It is unlikely that demand will be the same every year. Amore realistic model would be one in which demandeach year is a sequence of random variables.
THE MODEL WITH RANDOM DEMAND
This model of demand is appropriate when there is aconstant base level of demand that is subject to randomfluctuations from year to year.
Sampling Demand with a Spreadsheet: Assume initiallythat the demand in a year will be either 8, 9, 10, 11, or 12units with each value being equally likely to occur.
This is an example of a discrete uniform distribution.
Now, use the formula =INT(8+ 5*RAND() ) to samplefrom a discrete uniform distribution on the integers 8, 9,10, 11, 12 .
Multiple trials can be performed by pressing the
recalculation key for the spreadsheet (e.g., F9).
Using this formula results in random demands
http://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xls8/3/2019 Simulation Technique
27/54
30
=INT(8+5*RAND() )
Using this formula results in random demands.
Hitting the F9 key would result in a different sample ofdemands, and possibly a different NPV.
The demands are random variables, therefore, the NPVis also a random variable.
EVALUATING THE PROPOSAL
http://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xls8/3/2019 Simulation Technique
28/54
31
Two questions need to be answered about the NPVdistribution:
EVALUATING THE PROPOSAL
1. What is the meanor expected value of the NPV?
2. What is the probability that the NPV assumes anegative value (making the proposal to add theA3XX less attractive)?
To answer these questions, a simulation model must bebuilt. To run the simulation automatically and capture
the resulting NPV in a separate spreadsheet, use theData Tablecommand.
The resulting analysis gives the estimated mean NPV
8/3/2019 Simulation Technique
29/54
39
The resulting analysis gives the estimated mean NPVand standard deviation.
Downside Risk and Upside Risk: To get a better ideaabout the range of possible NPVs that could occur, look
at the minimum and maximum NPVs.
In the resulting analysis the Frequency (column B)
http://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xls8/3/2019 Simulation Technique
30/54
41
In the resulting analysis, the Frequency(column B)indicates the number of trials that fell into the bins(categories) defined by column A.
The cumulative % column indicates the cumulativepercentage of observations that fall into each categoryor bin.
The histogram gives a visual representation of the
http://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xls8/3/2019 Simulation Technique
31/54
42
The histogram gives a visual representation of thedistribution of NPVs. Note that it is somewhat bellshaped.
How Reliable is the Simulation? Now the two questions
http://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xlshttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xls8/3/2019 Simulation Technique
32/54
43
The next questions to ask are:
How Reliable is the Simulation? Now the two questionsabout the distribution can be answered:
1. What is the meanor expected value of the NPV?
2. What is the probability that the NPV assumes anegative value (making the proposal to add the
A3XX less attractive)?
In this trial, the mean is $12,100.
In this trial, the probability is
8/3/2019 Simulation Technique
33/54
44
For a 95% confidence interval, the formula is:
estimated mean + 1.96(standard deviation)
In this case, the standard deviation is the standard error
(the standard deviation divided by the square root of thenumber of trials).
Based on this trial, the upper and lower confidence
limits are: =$E$4-1.96*$E$8/SQRT($E$16)
=$E$4+1.96*$E$8/SQRT($E$16)
So, we have 95% confidence that the true mean NPV is
somewhere between $9,679 and $14,521.
THE MODEL WITH RANDOM DEMAND
http://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/wilson.xls8/3/2019 Simulation Technique
34/54
45
It is unlikely that demand will be the same every year. Amore realistic model would be one in which demandeach year is a sequence of random variables.
THE MODEL WITH RANDOM DEMAND
This model of demand is appropriate when there is aconstant base level of demand that is subject to randomfluctuations from year to year.
Sampling Demand with a Spreadsheet: Assume initiallythat the demand in a year will be either 8, 9, 10, 11, or 12units with each value being equally likely to occur.
This is an example of a discrete
uniform distribution.
OTHER DISTRIBUTIONS OF DEMAND
http://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/WILSNCB1.XLShttp://d/class%20materials/PGP/Courses%20offered%20by%20rupesh/Operations%20Research/class%20presentation%20OR/post%20mid%20term/OR/simulation/WILSNCB1.XLS8/3/2019 Simulation Technique
35/54
46
Originally, we started with equal mean demands of 10 foreach period (year). Then, we allowed for randomvariation in mean demand (between 8 and 12 units) anddiscrete distribution.
OTHER DISTRIBUTIONS OF DEMAND
Now, assume the mean demand will stay the same over
the next four years, somewhere between 6 and 14 units ayear, with all values being equally likely.
This scenario can be modeled as a continuous, uniformdistribution between 6 and 14.
In addition, we can explore the impact of differentdemand distributions on the NPV.
8/3/2019 Simulation Technique
36/54
47
MAINTAINANCE PROBLEM
Corrective Maintenance versus
8/3/2019 Simulation Technique
37/54
48
Corrective Maintenance versusPreventive Maintenance
The Heavy Duty Company has just purchased a large machine for anew production process.
The machine is powered by a motor that occasionally breaks down and
requires a major overhaul. Therefore, a second standby motor is kept,
and the two motors are rotated in use.
The breakdowns always occur on the fourth, fifth, or sixth day that themotor is in use. Fortunately, it takes fewer than three days to overhaul
a motor, so a replacement is always ready.
Cost of Replacement Cycle that Begins with Breakdown
Replace a Motor $2,000
Lost production during replacement 5,000
Overhaul a motor 4,000
Total $11,000
8/3/2019 Simulation Technique
38/54
49
Probability Distribution of Breakdowns
Day
Probability of
a Breakdown
Corresponding
Random Numbers
1, 2, 3 0
4 0.25 0.0000 to 0.2499
5 0.5 0.2500 to 0.7499
6 0.25 0.7500 to 0.99997 or more
Computer Simulation of Corrective
8/3/2019 Simulation Technique
39/54
50
Computer Simulation of CorrectiveMaintenance
Random Time Since Last Cumulative Cumulative Distribution of
Breakdown Number Breakdown Day Cost Cost Time Between Breakdowns
1 0.1343 4 4 $11,000 $11,000 Number
2 0.1523 4 8 $11,000 $22,000 Prob Cumu. Prob. of Days
3 0.9091 6 14 $11,000 $33,000 0.25 0 4
4 0.6161 5 19 $11,000 $44,000 0.5 0.25 5
5 0.6223 5 24 $11,000 $55,000 0.25 0.75 6
6 0.0026 4 28 $11,000 $66,000
7 0.6920 5 33 $11,000 $77,000 $11,000
8 0.6155 5 38 $11,000 $88,000
9 0.7805 6 44 $11,000 $99,000
10 0.9189 6 50 $11,000 $110,000
26 0.6869 5 128 $11,000 $286,00027 0.6415 5 133 $11,000 $297,000
28 0.3599 5 138 $11,000 $308,000
29 0.1493 4 142 $11,000 $319,000 Average Cost per Day
30 0.4700 5 147 $11,000 $330,000 $2,245
Breakd
own
Cost
8/3/2019 Simulation Technique
40/54
51
Preventive Maintenance Options
Preventive maintenance would involve scheduling the motor to beremoved (and replaced) for an overhaul at a certain time, even if a
breakdown has not occurred.
The goal is to provide maintenance early enough to prevent a
breakdown.
Scheduling the overhaul enables removing and replacing themotor at a convenient time when the machine is not in use, so no
production is lost.
Cost of Replacement Cycle that Begins without a BreakdownReplace a motor on overtime $3,000
Lost production during replacement 0
Overhaul a motor before a breakdown 3,000
Total $6,000
R l M t 4 D
8/3/2019 Simulation Technique
41/54
52
Replace Motor on 4 DaysRandom Time Until Scheduled Time Event That umulative Cumulative Distribution of
Cycle Number Breakdown ntil Replacemen Concludes Cycle Day Cost Cost Time Between Breakdowns
1 0.3926 5 4 Replacement 4 $6,000 $6,000 Number
2 0.4904 5 4 Replacement 8 $6,000 $12,000 Probability Cumulative of Days
3 0.8207 6 4 Replacement 12 $6,000 $18,000 0.25 0 44 0.6811 5 4 Replacement 16 $6,000 $24,000 0.5 0.25 5
5 0.1084 4 4 Breakdown 20 $11,000 $35,000 0.25 0.75 6
6 0.1032 4 4 Breakdown 24 $11,000 $46,000
7 0.5737 5 4 Replacement 28 $6,000 $52,000 Breakdown Cost $11,000
8 0.0718 4 4 Breakdown 32 $11,000 $63,000 Replacement Cost $6,000
9 0.5408 5 4 Replacement 36 $6,000 $69,000
10 0.9918 6 4 Replacement 40 $6,000 $75,000 Replace After 4 days
11 0.9948 6 4 Replacement 44 $6,000 $81,000
12 0.1657 4 4 Breakdown 48 $11,000 $92,00013 0.1035 4 4 Breakdown 52 $11,000 $103,000
14 0.3365 5 4 Replacement 56 $6,000 $109,000
15 0.1650 4 4 Breakdown 60 $11,000 $120,000
16 0.4908 5 4 Replacement 64 $6,000 $126,000
17 0.0267 4 4 Breakdown 68 $11,000 $137,000
18 0.1388 4 4 Breakdown 72 $11,000 $148,000
19 0.9297 6 4 Replacement 76 $6,000 $154,000
20 0.5908 5 4 Replacement 80 $6,000 $160,00021 0.1035 4 4 Breakdown 84 $11,000 $171,000
22 0.6132 5 4 Replacement 88 $6,000 $177,000
23 0.5361 5 4 Replacement 92 $6,000 $183,000
24 0.0726 4 4 Breakdown 96 $11,000 $194,000
25 0.0593 4 4 Breakdown 100 $11,000 $205,000
26 0.7241 5 4 Replacement 104 $6,000 $211,000
27 0.3092 5 4 Replacement 108 $6,000 $217,000
28 0.4092 5 4 Replacement 112 $6,000 $223,000
29 0.2356 4 4 Breakdown 116 $11,000 $234,000 Average Cost per Day
30 0.6483 5 4 Re lacement 120 $6 000 $240 000 $2 000
Replace Motor After 5 Days
8/3/2019 Simulation Technique
42/54
53
Replace Motor After 5 DaysRandom Time Unt il Scheduled Time Event That Cumulat ive Cumulat ive Distribution of
Cycle Number Breakdown Until Replacement Conc ludes Cycle Day Cost Cost Time Between Breakdowns
1 0.3543 5 5 Breakdown 5 $11,000 $11,000 Number
2 0.2204 4 5 Breakdown 9 $11,000 $22,000 Probability Cumulative of Days
3 0.0583 4 5 Breakdown 13 $11,000 $33,000 0.25 0 44 0.8282 6 5 Replacement 18 $6,000 $39,000 0.5 0.25 5
5 0.9815 6 5 Replacement 23 $6,000 $45,000 0.25 0.75 6
6 0.4620 5 5 Breakdown 28 $11,000 $56,000
7 0.7658 6 5 Replacement 33 $6,000 $62,000 Breakdown Cost $11,000
8 0.4318 5 5 Breakdown 38 $11,000 $73,000 Replacement Cost $6,000
9 0.8745 6 5 Replacement 43 $6,000 $79,000
10 0.9448 6 5 Replacement 48 $6,000 $85,000 Replace After 5 days
11 0.0987 4 5 Breakdown 52 $11,000 $96,000
12 0.5796 5 5 Breakdown 57 $11,000 $107,000
13 0.7489 5 5 Breakdown 62 $11,000 $118,000
14 0.2480 4 5 Breakdown 66 $11,000 $129,000
15 0.5809 5 5 Breakdown 71 $11,000 $140,000
16 0.9055 6 5 Replacement 76 $6,000 $146,000
17 0.5844 5 5 Breakdown 81 $11,000 $157,000
18 0.0157 4 5 Breakdown 85 $11,000 $168,00019 0.0949 4 5 Breakdown 89 $11,000 $179,000
20 0.1892 4 5 Breakdown 93 $11,000 $190,000
21 0.9239 6 5 Replacement 98 $6,000 $196,000
22 0.1051 4 5 Breakdown 102 $11,000 $207,000
23 0.8739 6 5 Replacement 107 $6,000 $213,000
24 0.5229 5 5 Breakdown 112 $11,000 $224,000
25 0.6667 5 5 Breakdown 117 $11,000 $235,000
26 0.3945 5 5 Breakdown 122 $11,000 $246,000
27 0.7721 6 5 Replacement 127 $6,000 $252,000
28 0.2253 4 5 Breakdown 131 $11,000 $263,000
29 0.6972 5 5 Breakdown 136 $11,000 $274,000 Average Cost per Day
30 0.5078 5 5 Breakdown 141 $11,000 $285,000 $2,021
Inventory Problem
8/3/2019 Simulation Technique
43/54
54
Inventory Problem
The daily demand of an item has the following distribution:
Demand per day(units)
0 1 2 3 4 5
No. of days on whichdemand occurred
4 10 15 39 22 10
When an order is placed to replenish inventory there is a delivery time
lag, which follows the following distribution:
Lead time (days) 2 3 4
No. of times ofoccurrence 24 12 4
The management is of the opinion that proportion of stockouts should
not exceed 5%.
8/3/2019 Simulation Technique
44/54
55
Queuing Problem
8/3/2019 Simulation Technique
45/54
56
Single server queue
A small grocery store with just one
checkout counter
Interarrival time uniform between 1-8 mins
Service time varies between 1-6 mins.
Probability distribution given.
The problem is to analyze the system bysimulating the arrival and service of 20
customers.
8/3/2019 Simulation Technique
46/54
57
Given distributions
Minimum 1Maximum 8
Interarrival Times
(minutes) 1 0.10 0.102 0.20 0.30
3 0.30 0.60
4 0.25 0.85
5 0.10 0.95
6 0.05 1.00
Service
Times
(Minutes)
ProbabilityCumulative
Probability
Uniform
Simulating of a M/M/1 Queue
8/3/2019 Simulation Technique
47/54
58
Assume a small branch office of a local bank with only
one teller. Empirical data gathering indicates that inter-arrival
and service times are exponentially distributed.
The average arrival rate = l = 5 customers per hour The average service rate = m = 6 customers per hour
Using our knowledge of queuing theory we obtain
= the server utilization = 5/6 0.83 Lq = the average number of people waiting in line
Wq = the average time spent waiting in line
Lq = 0.832/(1-0.83) 4.2 Wq = Lq/l 4.2/5 0.83 How do we go about simulating this system?
How do the simulation results match the analytical ones?
Simulating of a M/M/1 Queue
8/3/2019 Simulation Technique
48/54
59
NEWSPAPER BOY PROBLEM
bl
8/3/2019 Simulation Technique
49/54
60
Newspaper Boy Problem
Newsvendor sells newspapers on the street Buys forc = $0.55 each, sells forr = $1.00 each
Each morning, buys q copies
q is a fixed number, same every day
Demand during a day: D = max (X, 0) X~ normal (m = 135.7, s = 27.1), from historical data X roundsX to nearest integer
IfDq, satisfy all demand, and qD 0 left over, sell forscrap ats = $0.03 each
IfD > q, sells out (sells all q copies), no scrap
But missed out onDq > 0 sales
What should q be?
N B P bl F l i
8/3/2019 Simulation Technique
50/54
61
Newspaper Boy Problem Formulation
Choose q to maximize expected profit per day
q too smallsell out, miss $0.45 profit per paper
q too bighave left over, scrap at a loss of $0.52 per paper
Classic operations-research problem
Many versions, variants, extensions, applications
Much research on exact solution in certain cases
But easy to simulate, even in a spreadsheet
Profit in a day, as a function ofq:
W(q) =r min (D, q) +s max (q
D, 0)
cq
W(q) is a random variableprofit varies from day to day
Maximize E(W(q)) over nonnegative integers q
Sales revenue Scrap revenue Cost
Steps: Newspaper boy Problem
8/3/2019 Simulation Technique
51/54
62
Steps: Newspaper boy Problem
Simulation
Set trial value ofq, generate demandD, compute profit for
that day
Then repeat this for many days independently, average
to estimate E(W(q))
Also get confidence interval, estimate of P(loss),
histogram ofW(q)
Try for a range of values ofq
Need to generate demandD = max (X, 0) So need to generateX~ normal (m = 135.7, s = 27.1)
Demands = MAX(ROUND(NORMINV(RAND(),, ), 0)
Advantage of Simulation
8/3/2019 Simulation Technique
52/54
63
1. It is particularly well-suited for problems that are difficult or
impossible to solve mathematically.
2. It allows an analyst or decision maker to experiment with
system behavior in a controlled environment instead of in a
real-life setting that has inherent risks.
3. It enables a decision maker to compress time in order to
evaluate the long-term effects of various alternatives.
4. It can serve as a mode for training decision makers by
enabling them to observe the behavior of a system under
different conditions.
Advantage of Simulation
Limitations of Simulation
8/3/2019 Simulation Technique
53/54
64
1. Probabilistic simulation results are approximations, rather
than optimal solutions.
2. Good simulations can be costly and time-consuming to
develop properly; they also can be time-consuming to run,
especially in cases in which a large number of trials are
indicated.
3. A certain amount of expertise is required in order to design a
good simulation, and this may not be readily available.
4. Analytical techniques may be available that can provide better
answers to problems.
Limitations of Simulation