Download - Signature-8000-8500-SPE201104

Transcript
  • 8/16/2019 Signature-8000-8500-SPE201104

    1/6

    Signature Series 8500 Paired Panels

    Part 1 - General

    1.01 DESCRIPTIONA. General

    1. Furnish and install operable partitions and suspension sste!. Pro"ide all

    labor# !aterials# tools# e$uip!ent# and ser"i%es &or operable 'alls ina%%ordan%e 'ith pro"isions o& %ontra%t do%u!ents.

    1.0( RE)ATED *OR+ ,- OTERS

    A. Preparation o& openin/ 'ill be b General Contra%tor. An de"iation o& site

    %onditions %ontrar to appro"ed shop dra'in/s !ust be %alled to the attention o& the ar%hite%t.

    ,. All header# blo%in/# support stru%tures# a!bs# tra% en%losures# surroundin/

    insulation# and sound ba&&les as re$uired in 1.02 3ualit Assuran%e.

    C. Pre4pun%hin/ o& support stru%ture in a%%ordan%e 'ith appro"ed shop dra'in/s.D. Paint or other'ise &inishin/ all tri! and other !aterials adoinin/ head and a!b

    o& operable partitions.

    1.05 S6,7ITTA)S

    A. Co!plete shop dra'in/s are to be pro"ided prior to &abri%ation indi%atin/%onstru%tion and installation details. Shop dra'in/s !ust be sub!itted 'ithin

    80 das a&ter re%eipt o& si/ned %ontra%t.

    1.02 36A)IT- ASS6RANCE

    A. Preparation o& the openin/ shall %on&or! to the %riteria set &orth per AST7E99: Standard Pra%ti%e &or Ar%hite%tural Appli%ation and Installation o& 

    Operable Partitions.,. The partition STC ;Sound Trans!ission Classi&i%ation< shall be a%hie"ed per the

    standard test !ethod AST7 E=04== and E2154>:. Test run under AST7

     pro%edures prior to E=04== shall not be per!itted. All tests !ust be &ro! an

    independent# %urrentl operatin/# NIST4a%%redited )aborator a"ailable to "eri&results.

    1.09 PROD6CT DE)I?ER-# STORAGE# AND AND)ING

    A. Proper stora/e o& partitions be&ore installation# and %ontinued prote%tion durin/

    and a&ter installation 'ill be the responsibilit o& the General Contra%tor.

    1.08 *ARRANT-

    A. Partition Panels shall be /uaranteed &or a period o& t'o ears 'ith all!e%hani%al parts in%ludin/ tra% and %arriers /uaranteed &or a period o& &i"e

    ears. This /uarantee is a/ainst de&e%ts in !aterial or 'or!anship o& !anu&a%turer@s produ%t.

    (0120(1(1

  • 8/16/2019 Signature-8000-8500-SPE201104

    2/6

    Part 2 - Products

    (.01 7AN6FACT6RERS

    A. 7anu&a%turersB Sube%t to %o!plian%e 'ith re$uire!ents# pro"ide produ%ts b

    the &ollo'in/B

      1. 7oder%o In%.

    (.0( 7ATERIA)S

    A. Produ%t to be top supported Series >900 paired panels as !anu&a%tured b

    7oder%o In%.

      1. Panels shall be no!inall 2 10(!! thi%# in !anu&a%turer@s standard'idths up to 2> 1(50!!# and hin/ed in pairs.

    (. Panel &a%es shall be o& /psu! la!inated to appropriate substrates to !eet

    the STC re$uire!ent. or   Optional 

      Panel &a%es shall be o& steel ba%ed 'ith /psu!.

    Or (if the no vertical trim option is used):  Panel &a%es shall be o& roll &or!ed steel ba%ed 'ith /psu!. Panel &a%es

    shall be !e%hani%all &astened to the &ra!e. or 

    Optional 

    Panel &a%es shall be o& /psu! la!inated to appropriate substrates to !eetthe STC re$uire!ent and la!inated to t'o "erti%al &ull hei/ht steel an/les.

    Panel &a%es shall be !e%hani%all &astened to the &ra!e.

    Panel &a%es shall be re!o"able and repla%eable on site to a%%o!!odate&uture d%or &inish %han/es.

    5. Fra!es shall be a %o!posite o& steel and alu!inu! allos# &or!ed to prote%t

    the ed/es o& the &a%e !aterial. or   Optional (if the no vertical trim option is used):

      Fra!es shall be a %o!posite o& steel and alu!inu! allos# &or!ed to prote%t

    the panel ed/es. No "erti%al &a%e tri! shall be allo'ed.2. Interlo%in/ "erti%al seals bet'een the panels shall %onsist o& ton/ue and

    /roo"e alu!inu! and "inl astra/als %reatin/ a sho%4absorbin/# deep

    nestin/# i!pa%t resistant a%ousti%al interlo% bet'een panels. Ea%h pair o& 

     panels shall be e$uipped 'ith a %on%ealed panel lo%in/ de"i%e# su%h that#'hen en/a/ed 'ill result in a uni&or! interlo%ed unit 'ithout the use o& 

    top /uide rails.

    9. oriHontal top seals shall be %ontinuous %onta%t !ulti4&in/ered "inl. or Optional:

    oriHontal top seals shall be retra%table and operate si!ultaneousl 'ith the

     botto! seals. Top seals 'hi%h %an !ae %onta%t 'ith tra% so&&it or %eilin/durin/ !o"e!ent o& the panels 'ill not be per!itted.

    8. oriHontal botto! seals shall be auto!ati%all settin/ and retra%tin/#

     pro"idin/ ( 90!! no!inal %learan%e# and eert do'n'ard &or%e 'hen

    etended. Or 

    (0120(1((

  • 8/16/2019 Signature-8000-8500-SPE201104

    3/6

    Optional:oriHontal botto! seals shall be !e%hani%all retra%table# pro"idin/ (select 

    one) 1 (9!!# 1 J 5>!!# ( 90!!# ( J 82!! or 2 100!!

    no!inal operatin/ %learan%e# and eert do'n'ard &or%e 'hen etended.

    Cran tpe seals re$uirin/ !ore than one rotation o& the a%tuator to set or release or the use o& a &ied s'eep on an panel shall not be a%%eptable.

    or   oriHontal top botto! seals shall auto!ati%all operate as the panels are

     positioned. Auto!ati% seals re$uirin/ a proe%tion beond the panel ed/e

    shall not be a%%eptable.

    :. The panel hin/es used on the panels shall be o& steel and proe%t no !orethan 12 8!! beond panel &a%es. Panels shall be %onne%ted 'ith a

    !ini!u! o& three hin/es.

      ,. *ei/ht o& the panels shall be bet'een 8 to =#9 lbs.s$. &t. (= to 28 /s$.!(based on STC value selected) plus or !inus 1 lb. based on options sele%ted.

     C. Suspension sste!B

    1. Tra% shall be %lear anodiHed te!pered alu!inu! 'ith so&&it tri! o& %lear 

    anodiHed alu!inu! pro"idin/ a transition to the %eilin/. Tra% shall in%lude

    support bra%ets and rods# spa%ed to !anu&a%turer@s standards. Tra% !odel

    sele%tion based on 'ei/ht o& panels.a. Ea%h panel shall be supported b one 24'heeled %arrier. *heels to be o& 

    hardened steel ball bearin/s. Carrier desi/n shall ensure that all 'heels

    re!ain in %onta%t 'ith the tra% durin/ nor!al !o"e!ent o& the panels.Trolle !odel to be adapted to sele%ted tra%.

    Optional under 16'-3 ceilin! hei!ht onl":

      1. Tra% shall be hea" /a/e steel supported b support bra%ets and han/er rods# spa%ed to !anu&a%turer@s standards &or hei/ht and STC spe%i&ied.

    a. Ea%h panel shall be supported b one 24'heeled %arrier. *heels to be o& 

    hardened steel ball bearin/s 'ith steel tires.D. FinishesB

    1. Fa%e &inish shall be (select as re#uired)B

    a. Fa%tor applied rein&or%ed "inl 'all4%o"erin/ 'ith 'o"en ba%in/#

    'ei/hin/ (0 oH. or !ore per lineal ard 289 /!. Color shall besele%ted &ro! !anu&a%turer@s standard %olor sele%tor. or 

    Optional 

    Standard up4/rade &inishes. Color shall be sele%ted &ro! !anu&a%turer@sstandard %olor sele%tor. (select one)

    4 Fa%tor applied "erti%al ribbed %arpet ;N.R.C. .(0

  • 8/16/2019 Signature-8000-8500-SPE201104

    4/6

    4 C.S.7. Custo!er@s Spe%i&ied 7aterialL Fa%tor supplied &a%torapplied (re#uires factor" approval for manufacturin! compatibilit")% or 

      4 *ood "eneer (specif" species and !rade)% or  

    4 Custo!er sele%ted hi/h pressure la!inate ($ith vertical trim onl")%

    (. Fra!e %olor shall be (select as re#uired)Ba. Clear AnodiHed Alu!inu! (standard) or 

      Optional:4 Dar ,ronHe Painted. or 

    4 Custo! Color Painted (optional up!rade)% or 

    4 Custo! AnodiHed (optional up!rade)%

    5. Tra% &inishBa. Alu!inu! tra% and so&&it shall be %lear anodiHed. or 

    Optional up!rade:

    4 Custo! AnodiHed. or 4 Custo! Color Painted.

    Optional:a. Steel tra% shall be painted 'hite.  E. A%%essoriesOptions (select as re#uired)

    1. ADA4%o!pliant pass door o& the sa!e thi%ness# a%ousti%al %onstru%tion

    and &inish as the basi% panels. )o%ate 'here sho'n on the plans.  Optional (select as re#uired):

    a. Con%ealed Auto!ati% Door Closer.

     b. Dead bolt )o% (not available on e!ress doors)%

      %. Inset Pani% ,ar (loc&able on lever side if re#uired)%d. Inset Sel&4Illu!inated Eit Si/n (above door)%

    (. Inset %haldr !arer boards. )o%ation and hei/ht as indi%ated on

    dra'in/s.5. Inset ta% boards. )o%ation and hei/ht as indi%ated on dra'in/s.

    2. A%ousti%al Po%et doors o& sa!e %onstru%tion as panels. or 

      Optional:4 Non4A%ousti%al Po%et doors.

    Optional:

    a. Dead bolt )o%.

    (.05 OPERATIONA. Panels shall be !anuall operated# top supported# !o"ed in pairs &ro! the

    stora/e area# positioned in the openin/# and seals set.

    ,. Retra%table ,otto! Seals

    1. ,otto! seals shall auto!ati%all a%ti"ate as panels are deploed positioned'ithout the use o& an handle or a%tion b the operator and shall

    auto!ati%all retra%t 'hen panels are !o"ed to be stored. or 

    Optional:1. Retra%table 7e%hani%al ,otto! seals shall be a%ti"ated b a re!o"able

    operatin/ handle lo%ated approi!atel 20 1090!! &ro! the &loor in the

     panel ed/e.

    (0120(1(2

  • 8/16/2019 Signature-8000-8500-SPE201104

    5/6

    (. Seal a%ti"ation shall not re$uire !ore than one rotation o& the re!o"ablehandle.

    or 

    ,. Retra%table Top and ,otto! Seals1. Retra%table 7e%hani%al Top and ,otto! seals shall be a%ti"ated b a

    re!o"able operatin/ handle lo%ated approi!atel 20 1090!! &ro! the&loor in the panel ed/e.

    (. Seal a%ti"ation shall not re$uire !ore than one rotation o& the re!o"able

    handle. or 

      Optional:

      1. Top ,otto! seals shall auto!ati%all a%ti"ate as panels are deploed

     positioned 'ithout the use o& an handle or a%tion b the operator and shallauto!ati%all retra%t 'hen panels are !o"ed to be stored.

      (. Auto!ati% seal a%tuator shall not proe%t beond the no!inal ed/e o& the

     panel nor re$uire additional po%et %learan%e.C. Final partition %losure to be b B

    1. Teles%opi% %losure panel in%orporatin/ an epandin/ a!b !e!ber operated

    &ro! either side o& the panel 'ith a re!o"able handle. Panel shall be

    %apable o& %o!pensatin/ &or !inor out4o&4plu!b 'all %onditions and pro"ide a positi"e "erti%al seal bet'een partition and buildin/ stru%ture. or 

      Optional:

     1.  vailable under 1-3* +3,3mm.: in/ed Closure Panel per!anentlatta%hed to the stru%tural 'all. Panel per!its a%%ess bet'een ada%ent

    roo!s and shall be o& the sa!e &inish as basi% panels. Top and botto! seals

    shall be %ontinuous %onta%t !ulti4pl "inl. ard'are shall be re%essed.

    (.02 ACO6STICA) PERFOR7ANCEA. A%ousti%al per&or!an%e shall ha"e been tested at an NIST4a%%redited#

    independent laborator in a%%ordan%e 'ith AST7 E=04== or !ore re%ent Test

    Standards. Standard panel %onstru%tion shall ha"e obtained an STC ratin/ o& (select one) 25# 2:# 2=# 9(# 95 or 99.

    1. Copies o& the 'ritten test report are to be !ade a"ailable upon re$uest. Tests

    !ust ha"e been %ondu%ted at a laborator a"ailable &or "eri&i%ation o& results.

    Part 3 - Execution

    A. Installation.1. The %o!plete installation o& the operable 'all sste! shall be b an

    authoriHed &a%tor4trained installer and be in stri%t a%%ordan%e 'ith theappro"ed shop dra'in/s and !anu&a%turer@s standard printed spe%i&i%ations#

    instru%tions# and re%o!!endations.

    ,. Cleanin/1. All tra% and panel sur&a%es shall be 'iped %lean and &ree o& handprints#

    /rease# and soil.

    (0120(1(9

  • 8/16/2019 Signature-8000-8500-SPE201104

    6/6

    (. Pa%in/ and other installation debris shall be re!o"ed &ro! the ob site.

    C. Trainin/

    1. Installer shall de!onstrate proper operation and !aintenan%e pro%edures too'ner@s representati"e.

    (. Operatin/ handle and o'ner@s !anuals shall be pro"ided to o'ner@srepresentati"e.

    (0120(1(8