8/10/2019 Showcase Milan Seegers
1/36
sheet #1, property of ing. Milan Seegers, architectural concept and design
visit: linkedin.com/milanseegers
ing. Milan Seegers
visit me on the web:
milanseegers.blogger.com
facebook.com/milanseegers
linkedin.com/milanseegers
twitter.com/milanseegers
or view documents in my own
creative cloud:
goo.gl/vV6Gy
mail. [email protected]
tel. +31 6 48 07 8353
Booklet version 29th november 2012
complete version
showcase booklet
Specialized in strong expression of architec-
tural designs and ideas.
Combining both conceptal and practical
knowledge about building informationtechnology: my discipline covers the entire
architectural design process from sketch to
final design.
Innovation, creativity, technology, simplicity,
freethinking, knowledge, passion and profes-
sionalism is my device.
drive
Milan Seegers
naar het originele succes verhaal
BIGBIMlittle bim
Een boek van Finith E. Jernigan & Joost Wijnen
depraktischebenaderingvanBouwInformatieManagement
k eten in teg r a t ie op d e ju i s te m a n ier !
Pre-release deel 1aangeboden door
w w w . b i g b i m l i t t l e b i m . n l
oadisopenbim adviseurs
i -
i
.
k
k -
l
i
k k
-
i i
n i m vi u r
Order the book, where I have worked on:
BIG BIM little bimnow online at
www.bigbimlittlebim.nl and read about
integrated practice done right!
BIG BIM little bim:The practical approatch to Building Informa-
tion Management.
8/10/2019 Showcase Milan Seegers
2/36
8/10/2019 Showcase Milan Seegers
3/36
section of a design proposal part of the DEP building design proposal showcase for cepezed projects
8/10/2019 Showcase Milan Seegers
4/36
8/10/2019 Showcase Milan Seegers
5/36
inspiration, imagination and facination
8/10/2019 Showcase Milan Seegers
6/36
sheet #6, property of ing. Milan Seegers, architectural concept and design
visit: milanseegers.blogger.com
renovation pascal collegeDesign assistance at the Pascal college in the city of Zaandam by makingdesign decisions comprehensible.
date
November 2012
addres
Zaandam
client
Pascal College
SummaryThe assignment involved the design assis-
tance at the renovation of the Pascal college
in Zaandam by maintaining a 3D BIM model
to ensure usability, insight and design decisi-ons during the design proces.
ResultThe eventual result was a 3D model, a budget model and 3 artist
impressions ready for presentation.
8/10/2019 Showcase Milan Seegers
7/36
sheet #7, property of ing. Milan Seegers, architectural concept and design
visit: milanseegers.blogger.com
8/10/2019 Showcase Milan Seegers
8/36
sheet #8, property of ing. Milan Seegers, architectural concept and design
visit: milanseegers.blogger.com
touchdown highriseLarge urban programThe assignment involved the analysis of
several existing urban programs on the
basis of a conceptual layers at the location
Zeeburgerpad projecting. A fragment of theurban scheme was the starting point for
the architectural challenge and quest. The
assignment specifically asked for multiple
intensive spatial use.
Floor space indexThe quest for quality was naturally focu-
sed on the quality and consistency of the
different places, but more particularly on
the value and appreciation of all living and
working environment. So it was for us a
challenge to the Floor Space required high
index (FSI = 2.0) combined with the highestpossible Open Space Ratio (OSR).
ConceptThis thematic approach of optimizing land
use has led to solutions who have their
own urban interpretation and matching
architectural appearance. The area, having
the potential to develop its own image and
physical space to hook to the city.
Our architectural appearance is not random
but a result and supports the principles
formulated in urban planning.
The model is not based on existing urban
land development typologies. It is a structure
that repects the desired urbanization of the
place but based on its own spatial pattern. A
structure that literally creates space.
Urban design and architectural development at the zeeburgerpad,Amsterdam. Including dwellings, offices and recreation.
date
june 2011
address
zeeburgerpadAmsterdam
the Netherlands
client
City of Amsterdam &
University of applied
Sciences Amsterdam
gfa
25.000 m2
prizes
nominated for Vitae
bouw award 2011
this graduation project
for my Bachelor of Build
Environment is assessed
a 9 out of 10
made in collabora-
tion with Job van den
Heuvel
a corresponding movie
can be seen at my
website:
tiny.cc/iby36
project touchdown highrise
8/10/2019 Showcase Milan Seegers
9/36
sheet #9, property of ing. Milan Seegers, architectural concept and design
visit: linkedin.com/milanseegers
The special developed spatial concept is
fully integrathed within the placing of the
housing typologies which are directed by a
generic system and zoning within the hull.
A decentralized installation system for air
treatment is being utilized and can adapt to
any change made in that zoning system is
what makes this building unique.
the decentralized installation system for air treatment called NEXT active facadesis here being utilized in the In the balcony of a dwelling or an office.
project touchdown highrise
8/10/2019 Showcase Milan Seegers
10/36
sheet #10, property of ing. Milan Seegers, architectural concept and design
visit: milanseegers.blogger.com
project touchdown highrise
8/10/2019 Showcase Milan Seegers
11/36
sheet #11, property of ing. Milan Seegers, architectural concept and design
visit: linkedin.com/milanseegers
the decentralized installation system for air treatment called NEXT active facadesis here being utilized in the In the balcony of a dwelling or an office.
project touchdown highrise
1. The concept starts off from the double
layered construction in order to meet
the requiered FSI of 2.0.
2. Next, this huge density needed a pu-
blic space for access, quality, daylighting,
transportation, etc. Conventionally, this
is done by multi-storey buildings to re-
turn some of the volume removed. Herewe have chosen a different approach,
namely literally lifting the top layer of FSI.
This creates a raised surface, and thus a
public space the size of the entire plot.
1
2
3
4
5
6
3. To further define the superstructures volume and quality to the
outdoor space, we narrow the upper volume to the north, creating a
space in the form of a p, on the south side.
4. Then arises the accent, retreived from the RGBG cards, as an incre-
ase in the superstructure. This volume is created by forming the latter
part of superstructure.
5. The connection to the water is reflected by lowering the waterlevel to the plinth.
6. The connection to the green / blue zone east of the Zeeburgerpad
in the form of a green bicycle and pedestrian bridge.
8/10/2019 Showcase Milan Seegers
12/36
sheet #12, property of ing. Milan Seegers, architectural concept and design
visit: milanseegers.blogger.com
regulatory and gaugeThe assignment involved renovating two
remaining structures on the grounds of Am-
sterdams former socalled zuidergasfabriek.
Adopting the structures in a new urban planrecruiered a change of function to fit in pro-
perly. Integrating functions such as a small
medical center and a workshop supplying
the new neighbourhood in it s main needs.
The vision on which the design is based
consists of the following points.
1 the spatial perception that the monuments
from a history point of view own should not
or as little as possible be affected.
2 the quality of the immediate environment
should be adapted to the future context.
The following concept respecting that vision
is then formed
1 box-in-box. The facades of the monuments
act as a hat. Under these hats forms a consis-
tency of the new air conditioned boxes and
functions.
2 below surface. The architecture of the
exterior must be preserved and an it below
street level approach to the construction is
inevitable.
3 public space. The quality of the new
building can only come into its own by
connecting it to the immediate surrounding
area.
renovation and redevelopment into a new context at the Zuidergasfa-briek, Amsterdam. Including offices and workshops.
datemai 2010
addressde OmvalZuidergasfabriek
Amsterdam
the Netherlands
52.338525, 4.914140
clientCity of Amsterdam &
University of applied
Sciences Amsterdam
gfa
2000 m2
made in collabora-
tion with Job van
den Heuvel
project regulatory and gauge
8/10/2019 Showcase Milan Seegers
13/36
sheet #13, property of ing. Milan Seegers, architectural concept and design
visit: linkedin.com/milanseegers
The experience of the monumental space
created gos beyond displaying the architec-
ture to the user, the public. Creating of sight-
lines and transparency is a keyword here.
From level one, there are great sight lines
through space to the monumental facades
(including the roof). These internal sight lines
give the value, next to the monu-
total value, to behold the perception of size
and scale of the composition of the whole
(old and new).
Besides providing the opportunity to expe-
rience the historic value, there are sight lines
that fulfill other goals.
The facilityarea provides through its sight li-
nes for the perception of the entire building.
The public using this area, will experience
the spaces linked by this area as a special
perception.
In order not compromising the spatial
experience of the monument, the air hand-
ling unit is located outside the monuments.
Fresh air is then delivered at floor levels.
The exhaust from the boxes goes through
the ceiling (hot air rises) Then the air moves
into a vertical shaft and is blown out again
(without filtration or purification) from the
basement floor in the raw climate space.
the facilityareawhich is the buildings both route-logical as technical connector
underneath is illustrated the process fresh air goes through. Green means fresh and purple means used.
project regulatory and gauge
8/10/2019 Showcase Milan Seegers
14/36
sheet #14, property of ing. Milan Seegers, architectural concept and design
visit: milanseegers.blogger.com
project regulatory and gauge
8/10/2019 Showcase Milan Seegers
15/36
sheet #15, property of ing. Milan Seegers, architectural concept and design
visit: milanseegers.blogger.com
linear modelThe assignment involved making artistic
conceptual images of a design proposal
for a renovation of a villa in the rural area of
Limburg, a dutch provence.
A series of 3 images were needed to explain
the exterior design of the villa, and were
used to complement the architects own
drawings
Conceptual artistic images made for a design of a villa in the rural area ofLimburg, a dutch provence.
date
april 2011
address
Limburgthe Netherlands
client
Architectenbureau
Van den Heuvel de
Wilde
gfa
450 m2
project lineair model
8/10/2019 Showcase Milan Seegers
16/36
sheet #16, property of ing. Milan Seegers, architectural concept and design
visit: milanseegers.blogger.com
The assignment involved the making of a
series of conceptual artistic images involving
the design of a communityschool in de
Jordaan area in the city of Amsterdam.
Conceptual artistic images made for a design of a community school inthe Jordaan area in Amsterdam.
date
december 2010
address
ElandsstraatAmsterdam
the Netherlands
client
City of Amsterdam
& Delft University of
Technology
gfa
8000 m2
prizes
first prize at the Delft
University of Techno-
logy Architecture,
Urbanism and Buil-
ding sciences master
briging semester.
Ook te zien in:
De transformatie
van het schoolge-
bouw
ISBN:
978 90 6868 581 7
a corresponding
movie can be seen
at my website:
tiny.cc/u9vmh
project community school, de jordaan
Community school
8/10/2019 Showcase Milan Seegers
17/36
sheet #17, property of ing. Milan Seegers, architectural concept and design
visit: linkedin.com/milanseegers
project community school, de jordaan
8/10/2019 Showcase Milan Seegers
18/36
sheet #18, property of ing. Milan Seegers, architectural concept and design
visit: milanseegers.blogger.com
fortified town dwellingThe assignment involved renovating an old
monumental dwelling at the centre of the
pitoresque city of Naarden-vesting.
This private comminioned assignment whichI conducted on my own was my first real re-
novation assignment. The old inhabitant left
the house in a smudgy dark state. The new
inhabitants had the wish to make a light and
spacious dwelling out of it.
I guided them through the whole process
from an inspecion of the old structure, which
was more than 100 years olf, sketchdesign
and a building permit for the semi-monu-
mental building.
The result was a suprising light and spacious
dwelling wich was relativily cheap to build
thanks to good design and preperation.
Underneath are some photographs of the
building not being renovated yet.
A small dwelling in the pitoresque city of Naarden-Vesting needed a re-novation. The new owners wanted a light and spacious dwelling.
design date
november 2010
conducted on
mai 2011
photographs of the
conducted design
are on their way
address
marktstraat
Naarden (vesting)
the Netherlands
client
private commissio-
ning
gfa
150m2
project marktstraat naarden-vesting
8/10/2019 Showcase Milan Seegers
19/36
sheet #19, property of ing. Milan Seegers, architectural concept and design
visit: linkedin.com/milanseegers
The assignment involved renovating the old
neighbourhood of Kattenburg located in
Amsterdam in the eastern docklands.
Starting points were 1. better connectingwith water and surrounding islands 2.
better connection between the sub areas
inside Kattenburg. and 3. better correlation
between public and private realm
We started of creating an adjusted urban
scheme based on the original building pla-
cement as shown at the bottom of this page.
We revitilized the buildings giving them a
new facade system as shown at the right.
Renovating an old decayed neighbourhood on a A+ location and return it its glory.
date
march 2011
address
kattenburgamsterdam
the Netherlands
client
city of Amsterdam
prizes
2nd price on the
IP project at the
University of Applied
Sciences Amsterdam
project 2nd life of kattenburg
8/10/2019 Showcase Milan Seegers
20/36
sheet #20, property of ing. Milan Seegers, architectural concept and design
visit: milanseegers.blogger.com
DEPDEP is located in Science Port Holland.
Science Port Holland is the location and
habitat of companies, knowledge and public
institutions, which strive to achieve one
common goal: open innovation networksin leading technologies, with the aim to
turn technology innovations into business.
Bringing together knowledge institutions
and businesses, which clearly contribute to
addressing the key challenges in our society,
with spearheads in climate and health.
With DEP they offer a multi-tenant building
for high- tech companies.
This assignment wanted me to show diffe-
rent possibilities of a building adapting itself
to several different high tech users.
Showing a manufacturing facility, a labora-
tory and a modern office.
DEP stands for Delft Engineering and Production. Realistic computerimages made for a design of a officebuilding designed by architectenbu-
date
january 2011
address
Technopolis / sci-ence port holland
Delft
the Netherlands
client
architectenbureau
CEPEZED
gfa
-
prizes
first prize at minor
Visualisation 2010
at the University of
Applied scriences
Amsterdam
a corresponding
movie can be seen
at my website:
tiny.cc/u9vmh
more info at
cepezedprojects.nl/
projects-dep.htm
project delft engineering and production
8/10/2019 Showcase Milan Seegers
21/36
sheet #21, property of ing. Milan Seegers, architectural concept and design
visit: milanseegers.blogger.comproject delft engineering and production
This project is a modern office building with an open, light, and pavilion-like atmosphere.
The office floors allow a flexible layout and can be mutually connected by large vides and representative staircases.
Each floor can equip 810 square meters of laboratory. The laboratory module is the key unit in any lab facility. The lab module will fully coordinate all the archi-
tectural and engineering systems.
Flexibility in production planning and control, plus the ability to switch f rom one production model to a replacement, can often mean the difference between
success and failure.
8/10/2019 Showcase Milan Seegers
22/36
8/10/2019 Showcase Milan Seegers
23/36
sheet #23, property of ing. Milan Seegers, architectural concept and design
visit: linkedin.com/milanseegers
HM architectenDuring my internship at HM architecten in
Amsterdam the emphasis lay on the widest
possible formation throughout the entire
field.
Because of that I worked on a variety of pro-
jects from sketch phase to definitive design
phase.
The Vogelbuurt is a new development in
Baarn. The project consists exclusively of so-
cial housing. The illustrations for this project
on the photorealistic renders from my hand.
I have also worked on technical drawings of
faade drawings to detailed drawings
In the picturesque village of Leimuiden, half-
way in the Dorpstraat was a modern house
being built in the same style as the surroun-
ding buildings. The surrounding buildings
were characterized by many typical early
20th century Dutch architectural styles. We
chose a house with 2 floors. The depth of the
plot to accentuate the shape of the stone
construction volume in this direction and
stretched on the ground floor on two sides
by a building that both the barn and the
living houses.
Hoboken is a study of sustainable urban
development and architectural re-evaluation
of a garden village for social housing Woon-haven in Antwerp. I Accompanied architect
Jeroen Gerads to support his efforts making
this design sustainable, by using for example
the BREAM scoring.
My first professional internship was at HM architecten in Amsterdam. Mysupervisor was Maarten van Noord.
date
august 2009 until
february 2010
addressgrasweg 49
1031HX
Amsterdam
The Netherlands
Projects
participated
- Vogelbuurt Baarn
- factor IJ
- Dorpstraat Leimui-
den
- Hoboken Antwer-
pen
- Achtstaten
- HAVAS almere
- vakantiewoningen
Marken
- Rietvelden
- Rijsenhout
here I organised a
classes computer de-
sign for architects
this internship for
my Bachelor of Build
Environment is as-sessed a 9 out of 10
internship at HM architecten
8/10/2019 Showcase Milan Seegers
24/36
sheet #24, property of ing. Milan Seegers, architectural concept and design
visit: milanseegers.blogger.com
BIMbuzz design contestAs for the 2012 BIMbuzz competition in
Singapore the connexxion design Team was
born: Students and teaching professionals
passionate about BIM united.
Their aim: To win the 2011 international BIM-
buzz Singapore design competition.
The Rules were simple: to design a hotel in
48 hours using BIM according to a provided
functional program. The competition was
tense: teams from universities al over the
world were competing each other.
The verdict of the singapore jury was clear: It
was the most comprehensive and com-
plete Building Information Model they had
received. While meeting al the functional re-
quirements, the design was, with no doubt,
the overall winner of the 2011 Singapore
BIMbuzz design contest.
Designing a sustainable hotel in the city of Singapore revolving BIM prin-ciples in an international design contest
date
September 2011
client
BIMbuzz singapore
gfa
10.000+
prizes
1st prize (overall
winner)
Singapore design contest
a final render of the project, as designed in the
8/10/2019 Showcase Milan Seegers
25/36
sheet #25, property of ing. Milan Seegers, architectural concept and design
visit: linkedin.com/milanseegers
BIM experience at OadisAt Oadis OpenBIM consultants the top-notch
in BIM knowledge in Holland is available.
Delivering open and independant consul-
tancy Oadis secured its own region in the
dutch BIM-market.
We develop and implement management
information systems in organizations, prima-
rily for construction. These systems provide
real-time insight into all phases of construc-
tion, from feasibility studies to demolition.
Information is centralized and tested before
reuse. Thus the right decisions based on the
correct data can be made.
Our state-of-the-art knowledge enables
us to link and merge system information
already available, including external parties.
This gives Oadis a unique position; to offer
professionals within the industry a significant
advantage.
BIM-consultant and account manager at an innovative & young com-pany.
date
October 2011 until
now
addressH.J.E. Wenckenbach-
weg 49 Amsterdam
Burg. Buskensstraat,
Uden
Clients
- Erasmus MC Rot-
terdam
- UMC Utrecht
- Rijkswaterstaat
- University of
applied sciences
Amsterdam
-
BIM experience at Oadis
naar het originele succes verhaal
BIG
BIMlittle bim
Een boek van Finith E. Jernigan & Joost Wijnen
de praktische benadering van Bouw Informatie Management
k e t e n i n t e g r a t i e o p d e j u i s t e m a n i e r !
Pre-release deel 1aangeboden door
w w w . b i g b i m l i t t l e b i m . n l
oadisopenbim adviseurs
BIG BIM little bim leert je:
Vernieuwende manieren om vooruitstre-
vend te worden in de technologie van
morgen.
Hoe je op een duurzame manier waarde
toevoegt aan je projecten.
Hoe je Bouw informatie Management
kunt toepassen in je werk. Vandaag nog.
De kennis die nodig is om je te kunnen
focussen op je krachten, je werk en pro-
bleem oplossing.
Manieren om meer en beter te leveren
met minder, terwijl je zekerheid creert
over de resultaten.
De geheimen die leiden naar meer winst
en tevredenere klanten, gebruikmakend
van BIM.
En, een door de praktijk geteste benade-
ring die kan worden toegepast in ieder
project.
ISBN 978-94-6190-946-6
oadisopenbim adviseurs
bestel het complete boek nu op www.bigbimlittlebim.nl
building lifecycle managementCadvisual
Bezoek de BIG
BIM little bim
website, bestel
het boek en
ervaar de vele
extras die BIG
BIM little bim te
bieden heeft!
Pre-release deel 1aangeboden door
cadvisual@
bigbimlittlebim.nl
tel. 0413-216300
Order the book, where I have worked on: BIG BIM little bimnow online at www.bigbimlittlebim.nl and read about
integrated practice done right! BIG BIM little bim: The practical approatch to Building Information Management.
8/10/2019 Showcase Milan Seegers
26/36
sheet #26, property of ing. Milan Seegers, architectural concept and design
visit: milanseegers.blogger.com
OpenBIMlabThe Open BIM Lab is aimed at offering a le-
arning- and research environment to come,
via chain collaboration, to a more sustainable
built environment.
Because society is becoming increasingly
complex while demands and expectations of
our living environment rise, solutions must
be found and realised. Here, information and
knowledge management will be playing a
crucial role, because only if the sourceinfor-
mation of stakeholders can be unlocked can
insight be offered into the consequences of
desisions. This calls for a change in culture
in the building sector, which can be realised
significantly by proving that new coopera-
tion is technically feasible and returns are
sufficient.
OPEN
Open uitwisselstandaarden for files and
information play an important role in the
chain. The software tools, object libraries
and protocols that will examine OpenBIM-
lab bets, will therefore be minimal based
on open standards and / or open source
software can be selected. OpenBIM enables
supply chain partners to enrich each other s
information and portability. This unam-
biguous and faster communication. The
disclosure of project information is brought
together again possible for information tovalidate and analyze. This leads to a better
quality of information, greater transparency
and better understanding of the possibilities
or consequences of decisions for all supply
chain partners at every level: from client
to contractor. The OpenBIMlab will play
BIMlab, an inspiring laboritory for Building Information Management.The design and implementation of systems, software and workflows.
clients
University of applied
Sciences Amsterdam
Hogeschool Utrecht
Hogeschool Zeeland
Avans hogeschool
gfa
approx. 40m2
prizes
contributed iin
the 2011 BIMbuzz
Singapore contest
(1st prize)
BIMlab
8/10/2019 Showcase Milan Seegers
27/36
sheet #27, property of ing. Milan Seegers, architectural concept and design
visit: linkedin.com/milanseegers
a variety of research objectives focus, ranging from logistics, cost,
durability, etc. Another advantage is that the open standards relevant
project information in a sustainable way to archive, because the
information is as independent of (the version) software products. The
digital information just as long as the property!
BIM
BIM stands for Building Information Model, where the Dutch trans-
lation has several variants such as building information model, buil-
ding information management etc. Partly because there are different
interpretations in the market about what BIM is and what it can do
for clients and the production chain. and while the goal of BIM is to
promote clear communication in the chain ... There is therefore a
clear need in the market to know what BIM can be expected.
LAB
A lab experiment represents a sterile environment, with high quality
resources to do research to open BIM. The OpenBIMlab of HvA con-
ducted by practice-oriented research to improve the employability
and profitability of ketendigitalisatie to show. The studies may be due
to internal training programs, research projects or issues from the
market. This will not only students of the University can access the
OpenBIMlab, the Academy will also project-based cooperation with
other government agencies and industry.
Some specs: 5 work-spaces, 1 administrator-space, 48 processor
cores, 96GB ram, 1440GB ssd drives in RAID-0 configuration, 4TB
storage, Gigabit Ethernet, 50 presentation display, 12 22inch Full HD
displays.
BIMlab
8/10/2019 Showcase Milan Seegers
28/36
sheet #28, property of ing. Milan Seegers, architectural concept and design
visit: milanseegers.blogger.com
School dwellingsThe need for a school and the need for
dwellings in the neighbourhood of Zee-
burg, Amsterdam, is changing throughout
the years. As inhabitant structures change
through time, the need for a transformingbuilding arose.
Thus designed was a building that first could
serve for several years as a combination of
a medium sized school and dwellings. Later
A transforming building in a transforming neighbourhood: The need fora school and the need for dwellings.
date
june 2010
address
Zeeburg, Amster-dam
client
University of Applied
Sciences Amsterdam
partner
Anne Smulders
School dwellings
1111098
H
I
J
71
16x0,200
=3,200m
19x0
,168=
3,200m
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
WW
WW
WW
DS-02
DS-02
-
-
-
-
woning 114m2
woning 76m2
woning 70m2
woning 74m2
woning 84m2
o n in g 1 mn i o
woning 74m2
woning 94m2
woning 94m2
woning 69m2
woning 116m2
uitb
op
oudenooduitgangschool nu normaal
toegankelijktbvontsluiting
T
1098
I
J
K
7
16x0,200
=3,200m
19x0
,168=
3,200
m
W
W
W
W
W
W
W
W
W
W
W
DS-02
DS-0
r l
l
l
-
-
-
woning 114m2
woning 76m2
woning 70m2
woning 74m2
woning
woning 1n i o
woning 74m2
g lij rui tklaslokaal
klaslokaal l lo l
l l o l
personeelsruimte
zelfst. werkruimte
managementruimte
pantry
opslag
flexwerkplek
opslag
T
7
x,
=,
x,
=,
-
-
l
l
woning
woning
woning 1
woning 11
woning
woning
-
8/10/2019 Showcase Milan Seegers
29/36
sheet #29, property of ing. Milan Seegers, architectural concept and design
visit: linkedin.com/milanseegers
School dwellings
the school would transform to more dwel-
lings.
The architectural concept is based on the
shape of the lot and has a 2 meter clearanceof the western road, as being asked in the ur-
ban masterplan. Added is a 6 story building
in the shape a wedge placed in the north-
west side of the lot, creating a solid barrier
against the noise generated by the freeway.
The shape is then cut on the south to create
room for a arban sightline. A green passage
is being added to comply with the green-
zone north of the building. On the east an
indoor sports arena is created and ontop
there is room for a playground. A green slope
creates a playfull run-up towards the above
surface indoor sports arena.
The facades are equipped with a modular
facade system. Making it easy to create a
flexible transparent / solid appearance.
The project as entirely designed in BIM using
ArchiCAD. Also the transformational capabi-
litys were carefully designed and analysed
making use of the information in the BIM.
8/10/2019 Showcase Milan Seegers
30/36
8/10/2019 Showcase Milan Seegers
31/36
sheet #31, property of ing. Milan Seegers, architectural concept and design
visit: linkedin.com/milanseegers
levels. This way reducing the risk of errors each time the information
is passed on.
The UMC Utrecht BIM platform brought a solution, connecting both
existing systems and new systems; forming an efficient and ade-
cuate combination of technologies whereupon, in the near future,
can be build upon. In other words, is future proof.
The UMC Utrecht BIM platform was build revolving openBIM princi-
ples and complies with the RGD BIM norm: creating a comprehen-
sive information workflow while maintaining flexibility for future
development, reducing system legacy and adding sustanability.
Facility management using BIM
The UMC Utrecht BIM
platform was build revolvingopenBIM principles and com-
plies with the RGD BIM norm
A system that could both comprehend and
sustain on a policy level, a strategic level, and
on an operational level.
8/10/2019 Showcase Milan Seegers
32/36
sheet #32, property of ing. Milan Seegers, architectural concept and design
visit: milanseegers.blogger.com
Intervention HamburgThe design proposes an intervention that
acts on both urban scale and architectural.
The site is located on the south side of the
main trainstation of Hamburg (GER) and has
the opportunity to enhance the con- necti-vity and accessibility for pedestrians.
What we propose is conflict free connec-
tions:
- between the city centre and the outer city
on the east side of the station;
- with the station (and thereby making an
extension of the station);
-to the office district to generate a better
accessibility towards this area.
The urban space is strongly defined by the
contrast between the empty space and
the four big surrounding public buildingand auto ways. The intervention tries to act
without interfering with the existing, well
functioning, car traffic and train traffic.
This results in a design on three levels:
- the train level which is seven meters below
street level; - the second level is the same as
the exis- ting street level; -the third level is
a new introduced level which is six meters
higher.
This last level, the so called fly-over is
designed, detailed and materialised on a
contemporary way, while the street slab
makes by his materialization a connection to
the existing urban surrounding.
the intermediate level between architecture and urbanism. Completelydesigned in a BIM environment..
date
june 2012
address
HauptbahnhoffHamburg
client
TU Delft
gfa
10.000m2+
special
Visit, for a 360 view
of the project;
http://www.jvdhar-
chitecture.nl/ham-
burg.html
Intervention Hamburg
8/10/2019 Showcase Milan Seegers
33/36
sheet #33, property of ing. Milan Seegers, architectural concept and design
visit: linkedin.com/milanseegers
Intervention Hamburg
Where the fly-over touches the ground surf-
ace it continues for a while in the pavement
by which it attracts visitors and attaches
more strongly to the city.
To enhance the vitality of the area we
introduce a hotel, which is located just a bit
below the busy traffic lines near the station
and offers 17 levels of hotel rooms of about
30m2. The connection with the two slabs is
transformed into a cafe, while the upper two
levels contain a restaurant and a conference
centre.
On the fly-over near the station, a little shop is designed where small
functions related to the station can be. By doing so the interaction
with the station itself is enhanced.
We see that our design aims on an attrac- tive and conflict free rou-
ting for the pe- destrian and acts on both urban (making connecti-
ons between areas and districts) and architectural scale (generation
func- tions, making connection on smaller scale and introducing a
recognizable object next to the second most large trainstation of
Germany.
Completely designed in a BIM environmentusing the BIM-information not only as an
3d model but also extracting analysis data
about traffic and routing. A truely remarka-ble piece of implenting and actually using
advanced information in an engineering
8/10/2019 Showcase Milan Seegers
34/36
a view through the redeveloped part of the Pascal College, Zaandam
8/10/2019 Showcase Milan Seegers
35/36
8/10/2019 Showcase Milan Seegers
36/36
Top Related