September 11, 2013
Association of California AirportsCONTRACTING FOR
CONSTRUCTION MANAGEMENT SERVICES
Advisory Circular 150/5100-14DDefinitions
• Planning Services• A/E Services• Preliminary• Design Phase• Bidding & Negotiation Phase• Construction Phase
• Special Services
A/E ServicesConstruction Phase
• Considered Basic or Construction Administrative Services
• DO NOT satisfy requirements of AC 150/5300-12A
Advisory Circular 150/5100-12AQuality Control of Construction for Airport Grant
Projects
• Sponsors Responsibilities• Engineering Services (150/5100-14)• Pre-design, Pre-bid, and Preconstruction Conf (150/5300-9)• Supervision and Inspection
150/5370-12A c. Supervision and Inspection
• Mandatory for Airport Improvement Program (AIP) Projects– Design Phase (150/5370-10 Standards for Specifying
Construction of Airports)
– Construction Phase• Beyond the Scope of A/E Services• May be provided by Sponsor/Consulting Engineer/Separate
Agreement
Criteria For Selection
• Qualifications• Prior field experience• Qualified to make interpretations of the design INTENT• Have knowledge of Testing Requirements
Single Consultant vs
Separate Agreement
• Pros• Clearly understands the INTENT of the Drawings• Produces Biddable/Buildable Projects• Reduce Delays in RFI/Submittal process• Reduce Delays in the inevitable Changed Condition/CCO
pursuit• Saves Construction $ by minimizing delay costs
Single Consultant vs
Separate Agreement
• Pros• Clearly understands the INTENT of the Drawings
• D.O.R.
Single Consultant vs
Separate Agreement
• Pros• Produces Biddable/Buildable Projects
• DOR with Construction Experience
Single Consultant vs
Separate Agreement
• Pros• Reduce Delays in RFI/Submittal process
• DOR provides immediate response
Single Consultant vs
Separate Agreement
• Pros• Reduce Delays in the inevitable Changed Condition/CCO
pursuit• Saves Construction $ by minimizing delay costs
Single Consultant vs
Separate Agreement
• Cons• Perception of a Conflict of Interest• Protection from Design Errors/Omissions that cause
additional cost
Top Related