Search Results Recreational Trails Program Project Database
Your search for projects in State: WV, Total Results : 333
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 2014 S338-TEA/CR- S338-TEA/CR- Unspecified/Unidentifi
able
$22,400 $5,600 $28,000
WV 2014 S309-NOR/TH- S309-NOR/TH- Unspecified/Unidentifi
able
$49,653 $12,413 $62,066
WV 2014 U347-TRA/IL- U347-TRA/IL- Unspecified/Unidentifi
able
$11,600 $2,900 $14,500
WV 2014 U306-MIL/TO- U306-MIL/TO- Unspecified/Unidentifi
able
$8,000 $2,000 $10,000
WV 2014 U313-CRE/EK- U313-CRE/EK- Unspecified/Unidentifi
able
$15,290 $4,000 $19,290
WV 2014 U353-SPO/RT- U353-SPO/RT- Unspecified/Unidentifi
able
$25,600 $6,400 $32,000
WV 2014 U330-HAT/FI- U330-HAT/FI- Unspecified/Unidentifi
able
$50,000 $12,500 $62,500
WV 2014 U333-NBR/T-1 U333-NBR/T-1 Unspecified/Unidentifi
able
$50,000 $12,500 $62,500
WV 2014 X384-WVN/RT- X384-WVN/RT- Unspecified/Unidentifi
able
$80,000 $20,000 $100,000
WV 2014 U334-FKM/TN- U334-FKM/TN- Unspecified/Unidentifi
able
$14,100 $3,525 $17,625
WV 2014 U331-DEC/KE- U331-DEC/KE- Unspecified/Unidentifi
able
$23,122 $5,781 $28,903
WV 2014 U313-LEW/IS- U313-LEW/IS- Unspecified/Unidentifi
able
$19,200 $4,800 $24,000
WV 2014 U303-BOO/NE- U303-BOO/NE- Unspecified/Unidentifi
able
$8,000 $2,000 $10,000
WV 2014 U333-NBR/T-1 U333-NBR/T-1 Unspecified/Unidentifi
able
$32,000 $8,000 $40,000
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 2014 U302-YAN/KA- U302-YAN/KA- Unspecified/Unidentifi
able
$50,000 $12,500 $62,500
WV 2014 U313-CRE/EK- U313-CRE/EK- Unspecified/Unidentifi
able
$710 Unknown $710
WV 2017 Tools and Equipment Asphalt Repair Trail
Equipment
Asphalt Repair Trail Equipment $14,400 $2,880 $17,280
WV 2002 Fork Mountain Trail Maintenance Unspecified/Unidentifi
able
$16,000 $4,000 $20,000
WV 2003 Mon River Trail Construct Trail Unspecified/Unidentifi
able
$160,000 $40,000 $200,000
WV 2007 Trail Construction Trail Construction Construct Free Ride Bicycle trail in City Park Unspecified/Unidentifi
able
$16,800 $4,200 $21,000
WV 2007 Rail-Trail Trail Maintenance Maintenance on rail-trail Unspecified/Unidentifi
able
$18,862 $4,715 $23,577
WV 2007 Trail Construction Trail Construction Construct walking trail at school Unspecified/Unidentifi
able
$20,000 $5,000 $25,000
WV 2007 Trail Construction Trail Construction Construct walking trail at elementary school Unspecified/Unidentifi
able
$20,000 $5,000 $25,000
WV 2007 Trail Construction Trail Construction Construct Nature Trail Unspecified/Unidentifi
able
$20,000 $5,000 $25,000
WV 2007 Upper Falls Public Information Facilities Develop Trail Brochure, install Kiosks and
signage and develop portage trail around
Upper Falls
Unspecified/Unidentifi
able
$24,800 $6,200 $31,000
WV 2007 Trail Construction Trail Construction Construct rail-trail Unspecified/Unidentifi
able
$44,000 $11,000 $55,000
WV 2007 Trail Construction Trail Construction and Sign
Installation
Construct trail system, install signage,
develop brochures
Unspecified/Unidentifi
able
$66,650 $16,662 $83,312
WV 2007 Accessible Trail Construction Accessible Trail Construction Construct ADA Trail in State Park Unspecified/Unidentifi
able
$69,696 $17,424 $87,120
WV 2007 Various Trails Trail Maintenance Maintain multi-county motorized trail system. Unspecified/Unidentifi
able
$137,101 $34,275 $171,376
WV 2007 Various Trails Trail Maintenance Maintain multi-county motorized trail system. Unspecified/Unidentifi
able
$137,101 $34,275 $171,376
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 2007 OHV Trail Construction OHV Trail Construction Construct ATV Trails and Trailhead Unspecified/Unidentifi
able
$160,000 $40,000 $200,000
WV 2008 Various Trails Develop and Publish Map
and Trail Guide
Develop and publish new map and trail guide
for state park
Unspecified/Unidentifi
able
$6,640 $1,660 $8,300
WV 2008 Public Information Develop and Publish
Rail-Trail Guide
Develop and publish rail-trail guide Unspecified/Unidentifi
able
$14,400 $3,600 $18,000
WV 2008 Trail Construction Trail Construction Construct walking trail in community park Unspecified/Unidentifi
able
$18,400 $4,600 $23,000
WV 2008 Trail Construction Trail Construction Construct extension to community trail at
housing project
Unspecified/Unidentifi
able
$18,400 $4,600 $23,000
WV 2008 Rail-Trail Trail Improvements Resurface rail-trail Unspecified/Unidentifi
able
$24,000 $6,000 $30,000
WV 2008 Trail Construction Trail Construction Pave walking trail in community park Unspecified/Unidentifi
able
$24,858 $6,214 $31,072
WV 2008 Rail-Trail Trail Construction Pave Rail-Trail Unspecified/Unidentifi
able
$26,000 $6,500 $32,500
WV 2008 Trail Construction Trail Construction Construct walking trail at elementary school Unspecified/Unidentifi
able
$28,658 $7,164 $35,822
WV 2008 Trail Construction Trail Construction and
Improvements
Improve and extend trail in nature preserve Unspecified/Unidentifi
able
$31,350 $7,837 $39,187
WV 2008 Trail Construction Trail Construction Purchase Equipment Unspecified/Unidentifi
able
$40,000 $10,000 $50,000
WV 2008 Trail Construction Trail Construction Construct extension to community trail in
park.
Unspecified/Unidentifi
able
$40,000 $10,000 $50,000
WV 2008 Water Trail Improvements Water Trail Development Develop water trail on Greenbrier River Unspecified/Unidentifi
able
$48,000 $12,000 $60,000
WV 2008 Trail Construction Trail Construction Construct paved walking trail in community
park
Unspecified/Unidentifi
able
$50,000 $12,500 $62,500
WV 2008 Trail Construction Trail Construction for
Equestrians
Develop equestrian trail system Unspecified/Unidentifi
able
$75,000 $18,750 $93,750
WV 2008 Rail-Trail Rail Bridge Reconstruction
for Trail
Convert railroad trestle to trail bridge Unspecified/Unidentifi
able
$80,000 $20,000 $100,000
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 2009 Unspecified/Unidentifiable Unspecified/Unidentifiable Unspecified/Unidentifi
able
$4,800 $1,200 $6,000
WV 2009 Rail-Trail Maintenance On Rail-Trail Maintenance on rail-trail Unspecified/Unidentifi
able
$12,000 $3,000 $15,000
WV 2009 Construct Bridge and Trail
Maintenance
Construct Bridge and Trail
Maintenance
Construct bridge and maintenance on trail
surface
Unspecified/Unidentifi
able
$27,520 $6,880 $34,400
WV 2009 Construct Trail Construct Trail to Connect
State Park to National
Scenic River
Construct trail to connect state park to
National Scenic River
Unspecified/Unidentifi
able
$29,000 $7,250 $36,250
WV 2009 Construct Construction Construct Connector Trail Construct connector trail. Unspecified/Unidentifi
able
$32,800 $8,200 $41,000
WV 2009 Trail Construction Trail Construction Construct walking trail Unspecified/Unidentifi
able
$40,000 $10,000 $50,000
WV 2009 Construct Nature Trail
Around Pond
Construct Nature Trail
Around Pond
Construct nature trail around pond Unspecified/Unidentifi
able
$40,000 $10,000 $50,000
WV 2009 Construct Equestrian Trail Construct Equestrian Trail Construct equestrian trail. Unspecified/Unidentifi
able
$40,000 $10,000 $50,000
WV 2009 Trail Construction Trail Construction In
Community Park
Develop and construct walking trail in
community park
Unspecified/Unidentifi
able
$40,000 $10,000 $50,000
WV 2009 Rail-Trail Bridges Renovations to Rail-Trail
Bridges
Renovations to rail-trail bridges Unspecified/Unidentifi
able
$40,000 $10,000 $50,000
WV 2009 Trail Construction Trail Construction Develop and construct walking trail in state
park
Unspecified/Unidentifi
able
$59,200 $14,800 $74,000
WV 2009 State Park Trails Trail Rehabilitation Renovate walking trails in State Park Unspecified/Unidentifi
able
$80,000 $20,000 $100,000
WV 2009 Construct ATV Trails and
Trailhead
Construct ATV Trails and
Trailhead
Construct ATV Trails and Trailhead Unspecified/Unidentifi
able
$80,000 $20,000 $100,000
WV 2009 Acquisition Develop
Rail-Trail
Acquire and Develop
Rail-Trail
Acquire/develop-rail trail. Unspecified/Unidentifi
able
$80,000 $20,000 $100,000
WV 2009 US Fish and Wildlife Service
Fish Hatchery Project
Trail Construction Develop and construct trail at US Fish and
Wildlife Service Fish Hatchery
Unspecified/Unidentifi
able
$80,000 $20,000 $100,000
WV 2009 Trail Construction Trail Construction and
Trailhead
Construct trail and trailhead. Unspecified/Unidentifi
able
$220,000 $55,000 $275,000
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 1996 Monongalia County Trails Trail Construction Construct Trails, Restoration of Trails 1 Monongalia $10,518 $10,518 $21,036
WV 1996 Cairo Trails Trailhead Construction Parking and Landscaping 1 Ritchie $10,814 $10,814 $21,628
WV 1996 Marion County Trails Trail Construction Develop Trail 1 Marion $12,500 $12,500 $25,000
WV 1996 Mon River Trail Bridge Improvements Bridge Decking 1 Preston $33,168 $33,168 $66,336
WV 1996 Mon River Trail Install Signs Install Signage and Barricades 1 Monongalia, Preston $10,518 $2,630 $13,148
WV 1997 Paden City Trail Trail Construction Construct Trail 1 Tyler $2,500 $2,500 $5,000
WV 1997 Little Kanawha River Install Signs Signage 1 Ritchie $4,795 $4,795 $9,590
WV 1997 Mon Valley Trails Trail Construction Construct Trail 1 Monongalia $6,304 $6,304 $12,608
WV 1997 Morgantown Trails Trail Construction Construct Trail 1 Monongalia $12,500 $12,500 $25,000
WV 1997 Philippi Trail Trail Construction Construct Connecting Trails Throughout City 1 Barbour $31,550 $31,550 $63,100
WV 1997 Various Equestrian Trails Trailhead Improvements for
Equestrians
Construct Horse Trail 1 Harrison $12,415 $3,104 $15,519
WV 1998 Pleasants County School
Trails
Trail Improvements Improvements to Trail 1 Pleasants $5,130 $5,130 $10,260
WV 1998 Various Trails Trail Construction Construct Trail 1 Hancock $6,250 $1,563 $7,813
WV 1998 Rail-Trail Development Rail-Trail Development Development of Rail-Trail 1 Monongalia, Preston $12,500 $3,125 $15,625
WV 2000 Rockwall Trail Construct Trail 1 Pleasants $2,000 $1,000 $3,000
WV 2000 Gobbler's Knob Club Trail Construction 1 Pleasants $2,000 $1,000 $3,000
WV 2000 Monongah River Trail, Ralph
S. Larue Trail
Trailhead 1 Marion $14,013 $3,504 $17,517
WV 2000 Bridgeport City Park Trail Construct Trail 1 Harrison $17,147 $4,286 $21,433
WV 2000 Paden City Trail Trail Construction Construct Trail 1 Wetzel, Tyler $9,600 $4,800 $14,400
WV 2000 East Wetzel Trail Construct Trail 1 Wetzel $26,770 $6,800 $33,570
WV 2000 Sisterville River Trail Construct Trail 1 Tyler $42,710 $10,677 $53,387
WV 2000 Thomas Loop Trail Trail Construction Construct Trail 1 Tucker $9,845 $14,330 $24,175
WV 2000 Yankee Trail Construct Trail, Restrooms, Fountain,
Parking, Pavilion
1 Brooke $79,800 $19,995 $99,795
WV 2000 Mon River Trail Trail Construction Construct Trail 1 Monongalia $80,000 $40,000 $120,000
WV 2000 Little Kanawha Connector
Trail
Trail Construction Construct Trail 1 Wood $80,000 $40,000 $120,000
WV 2000 Marion County Project Develop Off-Road Vehicle Trail 1 Marion $25,000 $6,250 $31,250
WV 2001 Gentle Trail Trail Renovations 1 Tucker $16,067 $4,017 $20,084
WV 2001 Pioneer Trail Bridge Renovation 1 Brooke $18,240 $4,560 $22,800
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 2001 Mannington Rail-Trail Construct Trail 1 Marion $30,000 $7,500 $37,500
WV 2001 Little Kanoba Connector Construct Trail 1 Wood $30,000 $7,500 $37,500
WV 2001 West Fork River Trail Trailhead, Restroom 1 Marion $16,000 $8,000 $24,000
WV 2001 Caperton Trail Trailhead 1 Monongalia $80,000 $20,000 $100,000
WV 2002 Cooper's Rock Roadside
Trail
Construct Trail 1 Monongalia, Preston $10,983 $2,745 $13,728
WV 2002 Lubeck Volunteer Fire
Department Community Park
Trail
Improvements 1 Wood $16,000 $4,000 $20,000
WV 2002 Valley Falls State Park Maintenance 1 Marion $17,246 $4,312 $21,558
WV 2002 Westover Trail Construct Trail 1 Monongalia $20,905 $5,227 $26,132
WV 2002 Swisher Nature Area Trail Construct Trail 1 Mineral $34,819 $8,704 $43,523
WV 2002 Yankee Connector Trail Construct Trail 1 Brooke $40,000 $10,000 $50,000
WV 2002 Lost Creek Trail Construct Trail 1 Harrison $40,000 $10,000 $50,000
WV 2002 Marion County Parks and
Recreation Commission Trail
Maintenance 1 Marion $40,000 $10,000 $50,000
WV 2002 West Virginia Botanic
Gardens
Construct Trail 1 Monongalia $55,480 $13,870 $69,350
WV 2002 North Marion Rail-Trail Construct Trail 1 Marion $40,000 $50,000 $90,000
WV 2003 Bethany Trails Maintenance 1 Brooke $21,322 $5,331 $26,653
WV 2003 North Bend Lake Trail Construct Trail 1 Doddridge $80,000 $20,000 $100,000
WV 2003 Clarksburg-McWhorter Trail Construct Trail 1 Harrison $80,000 $20,000 $100,000
WV 2004 West Milford City Building Trailhead Construction Construct comfort station. 1 Harrison $8,094 $2,024 $10,118
WV 2004 Gobblers Knob Trail Bridge Installation and Trail
Renovation
Phase II Further development and swinging
bridge.
1 Pleasants $11,390 $2,848 $14,238
WV 2004 Mon River Trail, Caperton
Trail
Install Signs Signage and Kiosks for rail-trail. 1 Monongalia $15,200 $3,800 $19,000
WV 2004 Grantsville Trails Trail Construction Paved walking trail. 1 Calhoun $28,000 $7,000 $35,000
WV 2004 Marion County Trail
(MCTrail)
Trail Construction Pave Rail-Trail 1 Marion $40,000 $10,000 $50,000
WV 2004 Mon River Trail, Caperton
Trail, Deckers Creek Trail
Purchase Trail Maintenance
Equipment
Truck, trailer, attachments for mower. 1 Monongalia, Marion,
Preston
$41,600 $10,400 $52,000
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 2004 North Bend Rail-Trail State
Park
Purchase Trail Maintenance
Equipment
Purchase backhoe and attachments. 1 Ritchie $46,928 $11,732 $58,660
WV 2004 Mon River Trail, Caperton
Trail, Deckers Creek Trail
Rail-Trail Development Develop rail-trail. (Combined with earlier
development project.)
1 Monongalia $60,000 $15,000 $75,000
WV 2004 Kingwood-Tunnelton
Rail-Trail
Rail-Trail Development and
Acquisition
Acquisition of right of way and development
of rail-trail.
1 Preston $80,000 $20,000 $100,000
WV 2005 Sistersville Trail Sistersville Trail Bridge Project merged into earlier project 1 Tyler $0 Unknown $0
WV 2005 Gilmer County Trail 1 Gilmer $4,158 $1,040 $5,198
WV 2005 Cheat Ranger District Trails Cheat Ranger District
Maintenance
Repair trails in Dolly Sods vicinity 1 Multiple Counties $5,000 $1,250 $6,250
WV 2005 Blackwater Falls State Park Blackwater Falls Equipment Acquire equipment to patrol trails. 1 Tucker $10,000 $2,500 $12,500
WV 2005 Edison Arboretum Trail Construction Construct non-motorized trail and trailside
class room.
1 Wood $12,000 $3,000 $15,000
WV 2005 Canaan Valley Trails Trail Renovation Repair and maintain trail system in Tucker
County
1 Tucker $23,900 $5,975 $29,875
WV 2005 Homecrest Manor Trail Trail Construction Construct walking trail in housing project 1 Wood $32,000 $8,000 $40,000
WV 2005 Clarksburg City Park Trail Trail Construction Construct walking trail through city park. 1 Harrison $33,321 $8,330 $41,651
WV 2005 Deckers Creek Deckers Creek
Maintenance/Upgrade
Repair trail surface and drainage where
needed.
1 Monongalia, Preston $47,160 $11,790 $58,950
WV 2005 Bethlehem Community Park
Trail
1 Ohio $50,000 $12,500 $62,500
WV 2005 Philippi Trail Trail Construction Develop and construct extension to existing
trail
1 Barbour $55,200 $13,800 $69,000
WV 2005 Barnum Rail-Trail Barnum Rail-Trail Extension Acquire property and develop extension to
existing rail-trail.
1 Mineral $58,380 $14,595 $72,975
WV 2005 Barbour County Park Trail Trail Construction Design and construct walking trail in county
park.
1 Barbour $72,800 $18,200 $91,000
WV 2006 Mannington Rail-Trail Mannington Trail
Improvements
1 Marion $4,000 $1,000 $5,000
WV 2006 Follansbee Connector Trail Trail Construction Construct trail to connect Follansbee Nature
Trail to nearby street and install trailside
amenities.
1 Brooke $18,840 $4,710 $23,550
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 2006 Terra Alta Community Park
Trail
Trail Construction Construct non-motorized trail connecting park
and school.
1 Preston $40,000 $10,000 $50,000
WV 2006 Veteran's Memorial Park
Trail
Trail Improvements Pave fitness trail 1 Harrison $52,000 $13,000 $65,000
WV 2006 Kingwood-Tunnelton
Rail-Trail
Rail-Trail Development Project merged with 2004 project 1 Preston $80,000 $20,000 $100,000
WV 2007 Jody Hulka Memorial
Handicap Trail
Trail Renovation Repair and maintain Jody Hulka Memorial
Handicap Trail
1 Hancock $12,600 $3,150 $15,750
WV 2007 Williamston Trail Construction Construct trail around wetland in
Williamstown
1 Wood $40,000 $10,000 $50,000
WV 2008 South Wheeling Rail-Trail Rail-Trail Construction Construct rail-trail in South Wheeling 1 Ohio $32,000 $8,000 $40,000
WV 2009 Davis to Canaan Valley
Wildlife Refuge
Trail Construction Construct trail to connect Davis to Canaan
Valley Wildlife Refuge
1 Tucker $62,623 $15,655 $78,278
WV 2010 Rail-Trail Improvements Rail-Trail Improvements Improve surface of rail-trail 1 Wetzel $10,716 $536 $11,252
WV 2010 Monongah Trailhead Monongah Trailhead Shelter Construct shelter at trailhead. 1 Marion $8,000 $742 $8,742
WV 2010 Canaan Valley Wildlife
Refuge
Canaan Valley Wildlife
Refuge
Construct Pedestrian Trail 1 Tucker $36,767 $1,212 $37,979
WV 2010 West Fork River Trail Coons Run Bridge Repair bridge and West Fork River Trail
surface
1 Marion $40,000 $10,000 $50,000
WV 2010 North Bend Rail-Trail North Bend Rail-Trail,
Mountwood Park
Develop and construct an equestrian trail 1 Wood $32,800 $8,200 $41,000
WV 2011 Ferguson Memorial Park Ferguson Memorial Park Construct Trail 1 Harrison $8,000 $2,000 $10,000
WV 2011 Monongahela River Trails,
Van Hoorhis Trailhead
Monongahela River Trails,
Van Hoorhis Trailhead
Equipment purchase, trailhead improvements 1 Monongalia $78,400 $19,600 $98,000
WV 2011 Fort Boreman Historic Park Fort Boreman Historic Park Repair and upgrade existing trail 1 Wood $78,682 $19,671 $98,353
WV 2012 West Fork River Trail West Fork River Trail Construct restroom facility 1 Harrison $29,856 $7,464 $37,320
WV 2012 Various Trails Construct new trails, maintain existing trails 1 Tucker $34,521 $9,630 $44,151
WV 2013 Brooke Pioneer Trail Brooke; for use on Brooke Pioneer Trail;
purchase of a tractor with attachments for
trail maintenance
1 Brooke, Ohio $32,000 $8,000 $40,000
WV 2013 North Bend State Park Trails Ritchie; North Bend State Park; CN 8 miles of
multi-use trail designed to equestrian
standards
1 Ritchie $40,000 $10,000 $50,000
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 2013 Coopers Rock State Forest Coopers Rock State Forest Monongalia and Preston; Coopers Rock
State Forest; develop media for kiosks and
interpretive signs; removal and install new
kiosks
1 Monongalia, Preston $13,296 $3,324 $16,620
WV 2015 Trail Relocation Trail Relocation 1 Harrison $24,200 $6,050 $30,250
WV 2015 Mon River Trail, Caperton
Trail
Mon River/Caperton Trail
Connector-Star City River
Landing
1 Monongalia $96,000 $24,000 $120,000
WV 2015 Mon River Trail Collins Ferry Road: Mon
River Trail Connector
1 Monongalia $60,000 $15,000 $75,000
WV 2015 Foundry Street Foundry Street
Linkage-Downtown to
Rail-Trail
1 Monongalia $34,320 $8,580 $42,900
WV 2015 Deckers Creek Trail Deckers Creek Trail Surface
Repair Project
1 Monongalia, Preston $101,376 $25,344 $126,720
WV 2015 Tucker County Trails Tucker County Rocks! 1 Tucker $120,000 $30,000 $150,000
WV 2016 Alum Cave Trail Phase 2 Alum Cave Trail Phase 2 Trail Construction 1 Barbour $96,000 $19,200 $115,200
WV 2016 Cheat River Rail-Trail Cheat River Rail-Trail Phase
1
Rail-Trail Design and Construction 1 Preston $150,000 $30,000 $180,000
WV 2016 Corricks Ford Battlefield
Park
Corricks Ford Battlefield
Park
Park Development Project 1 Tucker $80,000 $16,000 $96,000
WV 2016 North Bend Rail-Trail North Bend Rail-Trail Design and Construction 1 Doddridge, Harrison $80,000 $16,000 $96,000
WV 2016 North Fork Blackwater Trail North Fork Blackwater Trail
Development Project
Trail design and construction 1 Tucker $74,238 $14,848 $89,086
WV 2016 Northern Rail-Trail Northern Rail-Trail Rail-trail Design and Construction 1 Preston $71,600 $14,320 $85,920
WV 2017 Cranberry Glades Botanical
Area Trails
Cranberry Glades Boardwalk
Trail Replacement
Cranberry Glades Boardwalk Trail
Replacement
1 Nicholas $100,000 $20,000 $120,000
WV 2017 Deckers Creek Deckers Creek Trail
Landslide Repair
Landslide Repair 1 Monongalia, Preston $36,000 $7,200 $43,200
WV 2018 Mon River Trail, Caperton
Trail
Caperton Rail-Trail Drainage
Upgrades & Repairs
Design and construction to repair and
upgrade the drainage infrastructure of the
Caperton/Mon River Trail located within
Monongalia County, WV.
1 Monongalia $58,000 $11,600 $69,600
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 2018 Caperton Trail Caperton Trail Lighting
Project
Design and construction of lighting for the
half mile Caperton/Mon River Trail section
along the Morgantown Wharf District located
within Monongalia County, WV.
1 Monongalia $150,000 $30,000 $180,000
WV 2018 West Fork River Access West Fork River Access Construction of new trailhead and trail to
provide access to the West Fork River
located in Shinnston, WV.
1 Harrison $5,000 $1,000 $6,000
WV 2018 Northern Rail-Trail Northern Rail-Trail Design of approximately 10 linear miles of
new rail trail corridor for the WV Northern
Rail-Trail located within Preston County, WV.
1 Preston $100,000 $20,000 $120,000
WV 2001 Allegheny Trail Bridge, Trailhead, Signage, Shelter 1, 2, 3 Tucker, Randolph,
Pocahontas,
Greenbriar
$50,001 $12,500 $62,501
WV 2005 Safety and Education Division of Motor Vehicles
(Dev.) ATV Safety Program
Purchase and distribute ATV safety literature
and Public Service Announcements.
1, 2, 3 Statewide $91,315 $22,829 $114,144
WV 2006 Safety and Education Division of Motor Vehicles
(DMV) ATV Safety Program
Project merged with 2005 project 1, 2, 3 Statewide $0 Unknown $0
WV 2007 Various Trails Trail Marking Re Blaze trails in three state parks 1, 2, 3 Multiple Counties $8,000 $2,000 $10,000
WV 2007 Various Trails Trail Construction Construct fishing access trail 1, 2, 3 Multiple Counties $10,000 $2,500 $12,500
WV 2008 Various Trails Purchase GPS Equipment Purchase GPS Equipment for trail
maintenance
1, 2, 3 Multiple Counties $4,000 $1,000 $5,000
WV 2013 Acquire Equipment Acquire Equipment Statewide, acquire equipment 1, 2, 3 Statewide $127,113 $31,779 $158,892
WV 1997 Shepherdstown Men's Trail Trail Construction Construct Trails 2 Jefferson $3,305 $3,305 $6,610
WV 1997 Elk District Trails Trail Construction Construct Trail 2 Braxton $8,250 $8,250 $16,500
WV 1997 St. Albans Trails Trail Construction Construct, Improve Trails 2 Kanawha $9,700 $9,700 $19,400
WV 1997 Hurricane Trails 2 Putnam $10,893 $10,893 $21,786
WV 1998 Jackson County Trails 2 Jackson $12,500 $12,500 $25,000
WV 1998 Putnam County Trails Trail Construction Construct Trail 2 Putnam $12,500 $12,500 $25,000
WV 2000 River Trail Trail Construction Construct Trail 2 Upshur $22,504 $5,726 $28,230
WV 2000 Walk Memorial Handicapped
Trail
Accessible Trail
Improvements
ADA 2 Kanawha $59,570 $32,920 $92,490
WV 2001 Nature Trail Trail Renovation 2 Jackson $22,400 $5,600 $28,000
WV 2001 Tuscarora Creek Linear Park Construct Trail 2 Berkeley $50,001 $12,500 $62,501
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 2001 Tracer Fork Trail Bridges 2 Kanawha $55,000 $13,750 $68,750
WV 2001 Poorhouse Farm Park Trail Bridge 2 Berkeley $12,000 $30,000 $42,000
WV 2002 Paw Paw Town Park Trail Construct Trail 2 Morgan $6,000 $1,500 $7,500
WV 2002 Yankauer Nature Preserve Maintenance, Improvements 2 Berkeley $11,344 $2,836 $14,180
WV 2002 Warm Springs Middle School
Trail
Construct Trail 2 Bath $16,000 $4,000 $20,000
WV 2002 Braxton County Nature Trail Improvements 2 Braxton $20,000 $5,000 $25,000
WV 2003 Rich Mountain Battlefield
Trails
Construct Trail 2 Randolph $8,622 $2,155 $10,777
WV 2003 Randolph County Project Develop Model Sections 2 Randolph $25,000 $25,000 $50,000
WV 2004 Ravenswood Park Trail Construction Construct Trail 2 Jackson $17,434 $4,358 $21,792
WV 2004 Glendale Park Trail Extend previously constructed trail. 2 Mercer $29,600 $7,400 $37,000
WV 2004 Mathers Side Trail Trail Improvements Stone stairs on Mathers, improved signage
through town.
2 Jefferson $57,299 $14,325 $71,624
WV 2005 Middle Ridge Trail Construct new trail 2 Kanawha $36,524 $9,131 $45,655
WV 2005 Valley Park Trail Develop extension to existing trail system 2 Putnam $46,240 $11,560 $57,800
WV 2005 Buckhannon River Trail Construct .49 mile extension to Buckhannon
trail system
2 Upshur $49,949 $12,487 $62,436
WV 2005 Clay County Park Trail 2 Clay $74,751 $18,688 $93,439
WV 2006 Homestead School Walking
Trail
Trail Construction Construct walking trail at elementary school 2 Randolph $7,832 $1,958 $9,790
WV 2006 Tuscarora Trail Bridge Installation Install bridge on Big Blue Trail as it goes
through Morgan County
2 Morgan $14,200 $3,550 $17,750
WV 2006 Paw Paw Trail Trailhead Construction Build Trailhead 2 Morgan $40,916 $10,229 $51,145
WV 2006 Jackson County Rail-Trail Rail-Trail Development Develop and construct rail-trail near Ripley 2 Jackson $80,000 $20,000 $100,000
WV 2007 Calhoun County Park Trail Construction Construct trail in Calhoun County Park 2 Calhoun $33,222 $8,305 $41,527
WV 2007 Wine Cellar Park Trail Renovation and
Construction
Repair Resurface and extend trail to Laura
Anderson Lake in Wine Cellar Park
2 Kanawha $36,848 $9,212 $46,060
WV 2007 Gauley Mountain Trail Trail Renovation Repair and maintain Gauley Mountain Trail in
Mon National Forest
2 Randolph $48,000 $12,000 $60,000
WV 2007 Bridge Installation Bridge Installation Construct three bridges on Kanawha Trace 2 Kanawha $80,000 $20,000 $100,000
WV 2008 Water Trail Improvements Water Trail Development Develop water trail on historic Mill Creek 2 Randolph $25,000 $6,250 $31,250
WV 2009 Tuscarora Trail Install Prefabricated Bridge Install prefab bridge on Tuscarora Trail 2 Morgan $17,200 $4,300 $21,500
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 2010 Sleepy Creek Wildlife
Management Area
Pedestrian Bridge
Sleepy Creek Wildlife
Management Area
Pedestrian Bridge
Install Pedestrian Bridge 2 Morgan $17,139 $491 $17,630
WV 2010 Buckhannon Riverfront Buckhannon Riverfront Construct Pedestrian Trail 2 Upshur $40,000 $10,000 $50,000
WV 2011 Wardensville Trails Buy trail building tools, equipment, and
storage building
2 Hampshire $6,100 $1,525 $7,625
WV 2012 Flowing Springs Park Flowing Springs Park Construct non-motorized trail 2 Jefferson $64,000 $16,000 $80,000
WV 2012 Kanawha State Forest Kanawha State Forest Construct non-motorized trail 2 Kanawha $80,000 $20,000 $100,000
WV 2013 East End Park Trail Charleston, Kanawha, East End Park/Dixie
St; const accessible trail loop around East
End Park
2 Kanawha $15,250 $3,050 $18,300
WV 2013 Wallace Hartman Nature
Preserve Trail
Wallace Hartman Nature
Preserve Trail
Kanawha; Wallace Hartman Nature Preserve;
construct non-motorized trail, trailhead,
facilities, improve existing trails
2 Kanawha $10,000 $2,000 $12,000
WV 2013 Reynolds Street Trail Spencer, Roane, Reynolds St, const of non
motor trails
2 Roane $40,000 $10,000 $50,000
WV 2015 Nature Trails Nature Trails-Phase II Trail
Maintenance Equipment
2 Kanawha $56,320 $14,080 $70,400
WV 2015 Kanawha County Trail
System
Kanawha County Trail
System
2 Kanawha $80,000 $20,000 $100,000
WV 2015 Kanawha County Trail
System
Kanawha County Trailhead
Facility
2 Kanawha $40,000 $10,000 $50,000
WV 2015 Golf Course Ridge Trail Golf Course Ridge Trail 2 Lewis $32,947 $8,237 $41,184
WV 2017 Hatfield-McCoy Trail System Kanawha County Trailhead
Facility
Design and construction. 2 Kanawha $50,000 $10,000 $60,000
WV 2017 Hatfield-McCoy Trail System Logan County Trail System
Construction
Design and construction. 2 Logan $50,000 $10,000 $60,000
WV 2017 Hatfield-McCoy Trail System Logan County Trailhead
Facility
Design and construction. 2 Logan $50,000 $10,000 $60,000
WV 2017 Hatfield-McCoy Trail System McDowell County Trail
System Construction
Design and construction. 2 McDowell $50,000 $10,000 $60,000
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 2018 Appalachian National Scenic
Trail
Loudoun Heights A.T.
Relocation
Construction of approximately 1,540 linear
feet of new trail along the Appalachian
National Scenic Trail outside the town of
Harpers Ferry.
2 Jefferson $50,000 $10,000 $60,000
WV 2018 Glendale Park Nature Trail Glendale Park Nature Trail
equipment
Design and construction to resurface
recreational trails and purchase of tractor with
attachments for maintenance of Glendale
Park in Elkins, WV.
2 Randolph $31,419 $6,282 $37,701
WV 2018 Hatfield-McCoy Trail System Construction of Boone
County Trail System
Purchase of 4 trucks for the construction and
maintenance of the Hatfield McCoy
Recreation Area consisting of approximately
200 miles of trail located within Boone and
Wayne Counties, WV.
2 Boone $150,000 $30,000 $180,000
WV 2018 Hatfield-McCoy Trail System Equipment for Lincoln
County Trail System
Purchase of a D5 dozer for maintenance of
the Hatfield McCoy Recreation Area
consisting of approximately 100 miles of trail
located within Lincoln County, WV.
2 Lincoln $150,000 $30,000 $180,000
WV 2018 Hatfield-McCoy Trail System Equipment for Wayne
County Trail System
Purchase of a D5 dozer for construction and
maintenance of the Hatfield McCoy
Recreation Area consisting of approximately
100 miles of trail within Wayne County, WV.
2 Wayne $150,000 $30,000 $180,000
WV 2018 Hatfield-McCoy Trail System Maintenance Equipment for
Boone and Wayne Counties
Purchase of 4 trucks for the construction and
maintenance of the Hatfield McCoy
Recreation Area consisting of approximately
200 miles of trail located within Boone and
Wayne Counties, WV.
2 Boone, Wayne $100,000 $20,000 $120,000
WV 2006 Monongahela National
Forest
Monongahela National
Forest Trail Maintenance
Maintain trails in Monongahela National
Forest.
2, 3 Multiple Counties $50,000 $12,500 $62,500
WV 2015 Wayne County Trail System Wayne County Trail System 2, 3 Wayne, Kanawha,
McDowell, Mingo,
Wyoming
$80,000 $20,000 $100,000
WV 1996 Greenbrier River Trail Trail Construction Trail Development 3 Pocahontas $10,000 $10,000 $20,000
WV 1996 Greenbrier River Trail Trail Improvements Improvements 3 Greenbrier $12,500 $12,500 $25,000
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 1996 Pocahontas County Rail
Trails
Removal of R R Ties 3 Pocahontas $14,578 $14,578 $29,156
WV 1996 Richwood Trails Trail Construction Develop Trail 3 Nicholas $15,000 $15,000 $30,000
WV 1996 Hatfield-McCoy Trail System Design and Engineering Design and Engineer 3 Mingo, McDowell,
Wayne, Boone,
Lincoln, Wyoming,
Logan
$83,160 $20,790 $103,950
WV 1997 Huntington Trails Trail Construction Construct/Improve Trails 3 Cabell $10,000 $10,000 $20,000
WV 1997 Princeton Trails Trail Construction Construct and Improve Trails 3 Mercer $10,000 $10,000 $20,000
WV 1997 Ritter Park Pathway Trail Construction Construct Underpass 3 Cabell $12,180 $12,180 $24,360
WV 1997 Hatfield-McCoy Trail System Trailhead Construction Construct Trail Head Facility 3 Mingo $64,750 $16,188 $80,938
WV 1998 Holly River Trails Trail Construction Construct Trail 3 Webster $2,656 $2,656 $5,312
WV 1998 McDowell County Trails Trail Construction Construct Trail 3 McDowell $3,080 $3,080 $6,160
WV 1998 Union Trails Trail Improvements Improvements 3 Monroe $12,500 $12,500 $25,000
WV 1998 West Virginia Race Park
Trails
Trailhead Improvements Construct and Improve Trail Head Facilities 3 Raleigh $22,500 $22,500 $45,000
WV 1998 Raleigh County Parks Trailhead Improvements Construct Trail Facilities 3 Raleigh $25,000 $6,250 $31,250
WV 2000 Mom's Mountain Trail and Trailhead
Construction
Construct Info Building, Restroom 3 Raleigh $22,400 $11,200 $33,600
WV 2000 27th Street Park Trail Trail Construction Construct Trail 3 Cabell $80,000 $20,000 $100,000
WV 2000 Hatfield-McCoy Trail System Trail Construction Construct Trails 3 Logan $172,388 $43,097 $215,485
WV 2001 Potato Knob Trail Boardwalk, Improvements 3 Webster $13,426 $3,356 $16,782
WV 2001 Browning Fork Trail Construct Trail 3 Mingo, Logan $64,000 $16,000 $80,000
WV 2001 Ansted Rail-Trail Construct Trail 3 Fayette $34,000 $17,000 $51,000
WV 2001 Panther State Forest Trails Trail Renovations 3 McDowell $77,791 $19,448 $97,239
WV 2001 Matewan Connector Construct Trails, Trailhead 3 Mingo $80,000 $20,000 $100,000
WV 2001 Mom's Mountain Facility 3 Raleigh $11,000 $22,000 $33,000
WV 2002 West Fork Trail Construct Trail 3 Pocahontas $8,000 $2,000 $10,000
WV 2002 Props Run Trail Construct Trail 3 Pocahontas $11,500 $3,500 $15,000
WV 2002 Glenwood Park Walking Trail Construct Trail 3 Mercer $14,800 $3,700 $18,500
WV 2002 Kanawha Trace Trail Maintenance, Improvements 3 Cabell $50,560 $12,640 $63,200
WV 2002 West Virginia Tech Trails Maintenance, Improvements 3 Fayette $67,300 $16,825 $84,125
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 2002 Hatfield-McCoy Trail System Construct Trail, Purchase Equipment 3 Unspecified/Unidentifi
able
$197,681 $49,420 $247,101
WV 2003 Spruce Trails Construct Trail 3 Pocahontas $9,600 $2,400 $12,000
WV 2003 Fitzpatrick Park Trail Construct Trail 3 Raleigh $10,456 $2,614 $13,070
WV 2003 Hatfield-McCoy Trail System Construct Trail 3 Lincoln, Wyoming $205,339 $51,334 $256,673
WV 2004 Old Main Building Trail Renovation Restore trail system. 3 Nicholas $7,759 $1,940 $9,699
WV 2004 Beech Fork State Park
Nature Trail
Trail Improvements Resurface trail. 3 Wayne $47,472 $11,868 $59,340
WV 2004 Huntington Museum of Art
Nature Trail
Trail Renovation Rehabilitation of nature trail. 3 Cabell $67,711 $16,928 $84,639
WV 2004 Lewisburg and Ronceverte
Rail-Trail
Rail-Trail Development Develop rail-trail. 3 Greenbrier $80,000 $20,000 $100,000
WV 2004 Hatfield-McCoy Trail System OHV Area Development Design and develop multi-county motorized
trail system and trailheads
3 Boone, Logan Mingo,
McDowell, Wyoming
$284,321 $71,080 $355,401
WV 2005 Greenbrier River Trail Greenbrier River Trail
Equipment
Purchase dump bed trail for rail-trail
maintenance
3 Greenbrier,
Pocahontas
$6,400 $1,600 $8,000
WV 2005 Seneca State Forest Trail Construct new connection section for existing
trail
3 Pocahontas $10,566 $2,642 $13,208
WV 2005 Hatfield-McCoy Trail System Hatfield-McCoy Single Track Construct motorized trail for dirt bikes. 3 Boone, Mingo $40,000 $10,000 $50,000
WV 2005 Laurel Fork Trail Design and construct ADA accessible trail
and trailhead with accessible trailside
amenities.
3 Webster $41,480 $10,370 $51,850
WV 2005 Bluefield City Park Trail
System
Bluefield City Park Tail
System
Repair, construct and maintain trail system in
city park.
3 Mercer $56,000 $14,000 $70,000
WV 2005 White Oak Rail-Trail Develop and pave rail-trail inside of city 3 Fayette $56,800 $14,200 $71,000
WV 2005 Hatfield-McCoy Trail System Hatfield-McCoy Mercer
County
Construct motorized trail in Mercer County 3 Mercer $60,000 $15,000 $75,000
WV 2005 Hatfield-McCoy Trail System Hatfield-McCoy Equipment Purchase maintenance and construction
equipment for motorized trail system.
3 Boone, Logan, Mingo,
McDowell, Wyoming
$493,681 $123,420 $617,101
WV 2006 Bluefield City Park Trail
System
Bluefield City Park Trail,
Phase II
Project merged with 2005 project 3 Mercer $0 Unknown $0
WV 2006 Durbin-Frank Rail-Trail Rail-Trail Development Construct Rail-Trail between Durbin Depot
and Whibney Park.
3 Pocahontas $24,000 $6,000 $30,000
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 2006 Muddlety Trail Accessible Trail Construction Design and build ADA accessible nature trail
at school.
3 Nicholas $30,000 $7,500 $37,500
WV 2006 Glenwood Park Trail Trail Construction Develop and construct extension to lakeside
trail in Glenwood Park.
3 Mercer $38,088 $9,522 $47,610
WV 2006 Hawks Nest Rail-Trail Hawks Nest Rail-Trail
Trailhead
Construct improvements to trailhead 3 Fayette $39,490 $9,872 $49,362
WV 2006 Hatfield-McCoy Trail System Trailhead Construction Build trailhead for motorized trail system. 3 Wayne $50,064 $12,516 $62,580
WV 2006 L & R Rail-Trail Construct Lewisburg end of L & R Rail-Trail 3 Greenbrier $50,418 $12,604 $63,022
WV 2006 Waterways Trail Trail Construction Construct non-motorized trail in county park. 3 Boone $60,000 $15,000 $75,000
WV 2006 Fork Mountain Trail Bridge Installation Construct bridge to connect Fork Mtn. Trail to
town
3 Nicholas $73,700 $18,425 $92,125
WV 2006 Hatfield-McCoy Trail System Trailhead Construction Build trailhead for motorized trail system. 3 Mercer $90,064 $22,516 $112,580
WV 2006 Hatfield-McCoy Trail System Trail Construction Build motorized trail system 3 Wayne $90,064 $22,516 $112,580
WV 2007 Alderson Elementary School Trail Construction and Sign
Installation
Construct walking trail at Alderson
Elementary School
3 Greenbrier, Monroe $15,520 $3,880 $19,400
WV 2007 Camp Arrowhead Accessible Trail Construction Construct ADA Trail at Camp Arrowhead 3 Cabell $700,007 $175,001 $875,008
WV 2008 Twin Branch Adventure
Center
Trail Construction Construct trail at Twin Branch Adventure
center
3 McDowell $11,625 $2,906 $14,531
WV 2008 Hawks Nest Trail Renovation Renovate historic overlook trail at Hawks
Nest
3 Fayette $29,000 $7,250 $36,250
WV 2010 Burning Rock ATV Park Burning Rock ATV Park Develop trails and trailheads in ATV Park 3 Raleigh $80,000 $3,631 $83,631
WV 2010 Rail-Trail Development Rail-Trail Development Develop Rail-Trail 3 Greenbrier $80,000 $20,000 $100,000
WV 2010 Various Water Trails Develop water trail 3 Pocahontas,
Greenbrier
$48,000 $12,000 $60,000
WV 2010 Hatfield-McCoy Trail System Hatfield-McCoy Trail System Development of a motorized trail system and
equipment purchase
3 Statewide $435,500 $108,875 $544,375
WV 2010 Beech Fork State Park Trail
System
Beech Fork State Park Repair and Rehabilitate Trail System 3 Wayne, Cabell $80,000 $20,000 $100,000
WV 2010 Cowen Trails Trail Development and
Construction
Develop and Construct Pedestrian Trail 3 Webster $40,000 $10,000 $50,000
WV 2011 Waterways Park Waterways Park Construct Trail 3 Boone $50,000 $12,500 $62,500
WV 2011 Man Park Man Park Develop and construct 3,800 feet of trail and
rehabilitate 3,000 feet of existing trail
3 Logan $40,000 $1,000 $41,000
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 2011 Summit Lake Summit Lake Renovate trail and rebuild pedestrian bridge 3 Nicholas $27,520 $6,880 $34,400
WV 2011 Camden Clinic Camden Clinic Construct non-motorized trail 3 Taylor $36,000 $9,000 $45,000
WV 2013 Rotary Park Trail Cabell, Huntington, Rotary Park, const new
trail.
3 Cabell, Wayne $12,000 $3,000 $15,000
WV 2013 Potts Valley Rail Trail Monroe, Potts Valley Rail Trail, preliminary
engineering
3 Monroe $3,213 $803 $4,016
WV 2013 Rainelle Recreation Trail Trail Construction Greenbrier; Rainelle; design and construct
trail; installation of signage, clearing of brush
& downed trees
3 Greenbrier $7,500 $1,875 $9,375
WV 2013 Mabscott Trails Purchase Equipment Mabscott, Raleigh, purchase trail building tool
equip.
3 Raleigh $27,440 $6,860 $34,300
WV 2015 Confederate Cemetery
Recreational Trail
Confederate Cemetery
Recreational Trail
3 Greenbrier $80,000 $20,000 $100,000
WV 2015 Rainelle Recreation Trail Rainelle Recreation Trail:
Phase II
3 Greenbrier $48,000 $12,000 $60,000
WV 2015 Wayne County Trail System Wayne County Trailhead
Facility
3 Logan, Mingo $40,000 $10,000 $50,000
WV 2015 Wellness Trails Wellness Trails 3 Mason $120,000 $30,000 $150,000
WV 2016 Babcock State Park Babcock State Park Purchase Equipment 3 Fayette $37,700 $7,540 $45,240
WV 2017 Burning Rock Eastern Trails Burning Rock Eastern Trails
Project
Trail construction. 3 Raleigh $120,000 $24,000 $144,000
WV 2016 Barboursville Park
Equestrian Trail
Barboursville Park
Equestrian Trail
Trail Design 3 Cabell $56,000 $11,200 $67,200
WV 2016 Anthony Creek Boat Launch Anthony Creek Boat Launch Launch Design and Construction 3 Greenbrier $28,000 $5,600 $33,600
WV 2017 Hatfield-McCoy Trail System Boone County Trailhead
Facility
Design and construct trailhead facility, 3 Boone $50,000 $10,000 $60,000
WV 2016 Guyandotte Water Trail Guyandotte Water Trail Design and construction 3 Lincoln, Logan, Mingo $125,000 $25,000 $150,000
WV 2016 Hatfield-McCoy Trail System Indian Ridge and
Pocahontas Trail
Build motorized trail system 3 McDowell $80,000 $16,000 $96,000
WV 2016 Hatfield-McCoy Trail System Rockhouse and Pinnacle
Creek Trail
Build motorized trail system 3 Logan $80,000 $16,000 $96,000
WV 2016 Hastfield-McCoy Trail
System
Bearwallow and Buffalo
Mountain Trail
Build motorized trail system 3 Logan $80,000 $16,000 $96,000
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 2016 Burning Rock ATV Park Burning Rock ATV Park Maintenance, Equipment and Trail Expansion 3 Raleigh $120,000 $24,000 $144,000
WV 2017 Greenbrier River Trail Greenbrier River Trail
Resurfacing
Resurface 50 miles of trail with gravel. 3 Greenbrier,
Pocahontas
$120,000 $24,000 $144,000
WV 2017 Meadow River Trail Meadow River Trail Phase III Develop Rail-Trail 3 Greenbrier $150,000 $30,000 $180,000
WV 2017 Narrow Gauge Trail Narrow Gauge Rail Trail
Restoration Project
Restoration project. 3 Fayette $150,000 $30,000 $180,000
WV 2017 Watoga State Park Trail
System
Park Trails and
Improvements
Park Trails and Improvements 3 Pocahontas $150,000 $30,000 $180,000
WV 2018 Athens Park Trail Athens Park Trail Design and construction of a walking trail
within the Athens Town Park located in
Athens, WV.
3 Mercer $60,157 $12,031 $72,188
WV 2018 Bluestone National Scenic
River Trail Causeway
Bluestone National Scenic
River Trail Causeway
Design and construction of drainage
infrastructure to prevent erosion of the
Bluestone National Scenic Trail Causeway
between Bluestone and Pipestem State
Parks.
3 Summers $10,000 $2,000 $12,000
WV 2018 Brush Creek River Access Bluestone River Water Trail
Group
Design of a hiking trail with river access along
Brush Creek from the community of Gardner
to the Bluestone National Scenic River, on to
Pipestem State Park and along Camp Creek
to Camp Creek State Park all within Mercer
County , WV.
3 Mercer $150,000 $30,000 $180,000
WV 2018 Bridge Buttress Rock,
Needleseye Park
Fayette County Climbing
Access Stabilization and
Development
Design and construction to rehabiltate the
Bridge Buttress rock climbing and hiking
recreation area with erosion control as well
as creating new trails and staging areas for
hiking, rocking climbing and bouldering in
Needleseye Park located within...
3 Fayette $100,000 $20,000 $120,000
WV 2018 Greenbrier River Trail Greenbrier River Trail
Facilities Replacement and
Enhancement Project
Construction to replace the facilities of the
Greenbrier River Trail including the vault
toilet, well with hand pump and Adirondack
shelter that were lost during the the 2016
flood.
3 Greenbrier $53,000 $10,600 $63,600
State
Project
Year
Trail Name
Project Name
Description
Cong. District(s)
County(s)
RTP Funds
Other Funds
Total Funds
WV 2018 Greenbrier River Trail -
Marlin Mountain Trail
Connector
Marlinton Ranger District
Forest and Community
Connections
Design and construction of approximately 2.2
linear miles of trail along the abandoned
Halfway Run road bed to create a trail
connection between the Greenbrier River
Trail and the Marlin Mountain Trail within
Marlinton, WV.
3 Pocahontas $25,000 $5,000 $30,000
Grand
Totals
(all
results)
$16,797,099 $4,410,102 $21,207,201
Top Related