SAVE ENERGYProject Meeting – Luleå 29/30th June 2009Project Overview and Framework, Aims of the Meeting
Project Overview
• Kick-off meeting in Lisbon 30th-31st March 2009• Working Groups • SAVE ENERGY LL Pilots • SAVE ENERGY Technical Platform Architecture• SAVE ENERGY Serious Game• Technical meeting in Helsinki• Methodology• Dissemination and exploitation• Project meeting in Luleå 29th – 30th June 2009
Kick off Meeting
• Team. Commitment • Project Concept. Methodology • Three thematic Working Groups.
Working Groups
• Working Group Topics: – SAVE ENERGY Pilots– SAVE ENERGY Platform Architecture– SAVE ENERGY Serious Game
• Working Groups last until necessary. • Work Methodology
Pilots Working Group
• Worked on Pilots requirements and implementations plans. Interaction with the corresponding WP
• Developed the methodology to co-create the SAVE ENERGY Pilots
• The questionnaire discussions gradually inproved Pilots and Partners participation stimulating the collaborative SAVE ENERGY Living Lab methodology
• Developed the methodology to involve and commit the users in each Pilot
Pilots Development
• The Pilots in Luleå and Helsinki are well on schedule and in full compliance of the LL methodology.
• The LL Methodology has been co-created in each pilot with the involvement of the end users and shared with the other Pilots.
• The Lisbon Pilot gradually adopted the LL methodology replacing their usually more technological oriented methodology.
• Leiden and Manchester Pilots need to advance with the LL methodology and work more closely with their users in order to recover the schedule. Since the Project M3 both pilots has been showing progressive advance and commitment to align with other pilots progress.
Save Energy: Helsinki Pilot Design
Present way to use Found problems Users’ requirements Experience from the
technical expert of the buildings and HVAC
Brainstorming, proposals, improvements, what is possible, what is sensible
Detailed design of applications
Available historical data, conclusions
Earlier Energy Audits New Energy Audits Use of present building
automation Technical Drawings Pilot applications New wireless
monitoring ICT system with intelligent sensors
Measurement data will be monitored via the old building automation system and using the new wireless sensor based system ( There, ISA )
Lab pilot scale system for PLC development
Data will be analysed and sent to the main server system
Analyse of the measurements
Update the database
Analysis,Monitoring,Follow up
Setting Up the Data Acquisition System
Evaluation and Design the Applications at Schools
Evaluation of the Present Situation
Source .SAVE ENERGY Techinical Meeting Helsinki; Arne Gylling & Asko kippo
7
Project GroupAsko Kippo, Helsinki Pilot Project Manager,
Metropolia UASCity of Helsinki; Pekka Hapuoja, Katri KuusinenGreen Net; Lauri Hietaniemi, Anu Hassinen, Suvi
HäkämiesHSE/CKIR; Riina Utriainen, Petra TurkamaNokia; Veli-Pekka NiitamoThere; Sakari Seppänen
Technical Expert GroupCity of Helsinki: Pekka Hapuoja, Katri Kuusinen, Kari
Niittymäki, Erkki Pihkoluoma, Timo Posa, Juha Haapasaari, Toivo Sahlsten
Metropolia UAS; Asko KippoFinal year students; Matti Olin, Ville Olkkonen, Samuli
Rasinmäki, Anssi Ulmanen
Users’ Group at Pihkapuisto SchoolPrincipal Pirkko KaskinenJanitor Erkki OrtelaTeachers; Heikki Huurre, Anne Hyvönen, Mikko
OikarinenPupils;
Users’ Group at Ala-Malmi SchoolPrincipal Tuula EkholmJanitor Tiina HeikkinenTeachers Rita Huhtala, NN1, NN2, NN3Pupils
Source SAVE ENERGY Techinical Meeting Helsinki; Arne Gylling & Asko kippo
8
Save Energy: User Groups in Helsinki
Applications at Schools
Application Role of teachers
Role of pupils
Role of other
persons
Problem Technical Solution
Lights at Entrance Hall
Manual control of lighting
Follow up of energy consumption and lighting
Operation and maintenance
20 units a’ 150 W lamps are continuously on
Evaluating and designing the smart solution for lighting system (new lamp groups, sensor based system, new lamp technology), users learn by displays
Gym HVAC Designing the use of Gym with HVAC
Follow up of energy consumption and HVAC
HVAC control according to the users in gym
HVAC functions poorly, does not care about the number of users
New, sensor based control system for HVAC that notifies the number of users, users learn by displays
Classrooms PC classes (several)
Manual control of lighting and power supply
Follow up of energy consumption and lighting
Operation and maintenance
Unnecessary use of lighting and power, poor quality of air
Reduce the unnecessary use of lighting and power, new sensor based control system, users learn by displays
Corridors Manual of sensor based control of lighting
Manual control if needed
Operation and maintenance
Unnecessary use of lighting
Reduce the unnecessary use of lighting, users learn by displays
Energy Saving at Kitchen
Operational development and logistic plan
Participation in design and evaluation
Energy economical development of the kitchen
Uneconomical use of kitchen
Evaluation and design of the developments of the logistics and food service from energy saving point of view
Users:Teachers, pupils
TechnicalExperts
Historical Data:Made Energy
Audits
SupportingCompanies
EvaluationIdeas,
ProposalsSAVE
ENERGY
ActionPlan
ProjectPlan
InvestmentPlan
Evaluation
Implementation of the Pilots and Game
Source SAVE ENERGY Techinical Meeting Helsinki; Arne Gylling & Asko kippo
10
Helsinki Pilot:Collaboration and Co-operation
towards Implementation
Platform Architecture Working Group
• Definition of the Technical Platform integrating the different components
• Roles of CeTIM, ISA, NOKIA/THERE • Other Equipment suppliers • Technical integration, tests to be done,
communication protocols, etc. • Interoperability
Serious Game Working Group
• Weekly Skype meetings and bilateral meetings.
• Development of concept: objectives, content, how to get and keep people playing, etc.
• Technical Meeting in Helsinki on the 17th June
Methodology (1/2)
Methodology (2/2)
• Pilot models ( Strongly LL user driven and collaborative methodology)• Technologies, methodologies, services: understanding, selecting and
applying by each pilot(LL user driven colaboration.... colaboration.... colaboration....)
• Platform integration and interoperability (Strong collaboration between suppliers and pilot coordinators. Exchange of Learning experiences)
• Global ambition and vision beyond the project: sustainable growth of pilots , pro-active multiplying dissemination and business strategy enabler
SAVE ENERGY Dissemination
SAVE ENERGY PortalWeb 2.0 Tools and Services , Social Networking
Project Exploitation
Objectives of the Luleå Meeting
• Presentation, discussion and consolidation of the current status of the work developed by the Consortium Partners:– Pilots Working Group
– Technical Platform Working Group
– Serious Game Working Group
– Pilots
– Workpackages
• Planning of the next 6 Months
Meeting Outcomes
Planning the next project cycle:
• To align Pilots in a high level development and implementation status: Requirements, design, models, methodologies, implementation plans, etc.
• Technical platform and interoperability; services to be provided – next steps
• Serious game approach. • Keep improving the collaborative environment in line with the
Project Vision
Planning of the next 6 months
• How do we reach the Pilots objectives?• How do we involve all the participant partners and users? • First newsletter SAVE ENERGY (Green Net - Content)• Progress with the Web 2.0 and Social Network activities• Best practice cases manual• Review agenda for the next 6 months.
Luleå Meeting Agenda(1/4)Agenda DAY 1, 29Jun- Morning
Start End Description Responsibility
8H30 9H00 Registration All
9H00 9H30 Welcome. Project progress Overview. Aims of the meeting. SAVE ENERGY Vision Framework
Mikael Borjeson; Álvaro Oliveira
9H30 10H00 Pilots Working Group Asko KippoArne Gylling
10H00 10H30 Platform Architecture Working GroupMaria JoãoBernhard KatzySakkari Pentinnen
10H30 10H45 Coffee break
10H45 11H30 Luleå Pilot - Participants are invited to a guided tour by the SAVE ENERGY Pilot House of Culture Ulf Wikström
11H30 12H00 Helsinki Pilot Asko Kippo
12H00 12H30 Leiden Pilot Marteen van der Plaas
12H30 14H00 Lunch
Luleå Meeting Agenda(2/4)Agenda DAY 1, 29/Jun- Afternoon
Start End Description Responsibility
14H00 14H30 Lisbon Pilot Maria JoãoJoana Fernandes
14H30 15H00 Manchester Pilot Martine Tommis
15H00 15H30 Work package 1 presentation Douglas Thompson
15H30 15H50 Work package 2 presentation Samantha
15H50 16H20 Work package 4 presentation Bernhard Katzy
16H20 16H45 Coffee break
16H45 17H15 Work package 3 presentation – Including the Serious Game Working Group Activities Utriainen Riina
17H15 17H45 Work package 5 presentation Ben Cowley17H45 18H00 Work package 6 presentation Maria João18H00 18H15 Work package 7 presentation Arne Gylling18H15 Meeting closing
20H00 Dinner: Reservation made on Färjan, the "Ferry", close to the House of culture (each participant is paying for own food etc.)
Luleå Meeting Agenda(3/4)Agenda DAY 2, 30/JUN - Morning
Start End Description Responsibility9H00 9H30 Work package 8 presentation Lauri Hietaniemi
9H30 10H00 Work package 9 presentation Álvaro Oliveira
10H00 11H00 Emerging European Lead Group in ICT Energy Efficiency Mission and Strategy. The role of CIP Pilots. Partnerships
Veli-PekkaÁlvaro Oliveira
11H00 11H30 Coffee Break
11H30 12H30 Serious Game brainstorming. ScenariosBen CowleyRiina UltrainienJosé Moutinho
12H30 14H00 Lunch
Luleå Meeting Agenda(4/4)Agenda DAY 2, 30/JUN - Afternoon
Start End Description Responsibility14H00 14H30 SAVE ENERGY Portal and WEB 2.0 tools José Moutinho
14H30 16H00 WEB 2.0 Clinic: Hands on workshop. Take you problems and contents to this session.
José MoutinhoDenis HickelOthers
16H00 16H30 Coffee break and discussion
16H30 18H00 Detailed Planning All
18H00 Meeting closing
18H00 18H15 Steering Committee
19H00 Dinner: Boat trip with dinner (including prawn buffet)