SAN PEDRO LANDFILL GAS RECOVERY AND POWER GENERATION PROJECT
Contents
The 4-‐MW Landfill Methane Recovery and Power Genera9on Project is located in San Pedro, Laguna. It is 18km from Maka9 City
-‐ Owned and operated by Pilotage Trading and Construc7on
-‐ The San Pedro Sanitary Landfill has been receiving waste since 2003
-‐ Cell 1-‐5 = 18 Has
-‐ Currently receiving waste from Municipalites of Laguna
-‐ BEI has installed 84
collec7ng wells throughout cell 1-‐4
Installed Capacity 4,212 MW (4MW)
Engine Specs 4 Jenbacher Gas Engines (J320) each with a design capacity of 1053 kW (1MW), contained in 20S containers
Engine Efficiency 40.32%
Fuel Gas LHV 100% (Full load)
75% (Par7al load)
50% (Half load)
Gas Volume Nm3 679 528 376
Electrical output
kW 1053 789 523
MILESTONE DATE
Incorpora9on of BEI July 2007
Commenced Drilling of Wells November 2007
Approval of Loan from DBP June 2009
Onsite Groundbreaking for construc9on of Power Plant November 2009
Comple9on of PDD (for CDM) December 2009
Received ECC from DENR June 25 2009
Awarded a Biomass RE Opera9ng Contract from DOE February 1 2010
Signed a Power Purchase Agreement with MERALCO November 12 2010
Comple9on of Plant Commissioning December 13 2010
Received COC from ERC Jan 31 2011
Received Le`er of Approval from Host DNA (DENR) March 7 2011
Start of Commercial Opera9on March 15 2011
[clean]
LAND FILLING GAS WELL DRILLING & INSTALATION
LFG PROCESSING & EXTRACTION UNIT
LFG POWER GENERATION
ELECTRIC DISTRIBUTION TO THE GRID END USERS
BALANCING THE GAS FIELD à Involves Balancing flow, oxygen, methane and pressure Primary Considera7ons in Managing Landfill Gas Extrac9on:
– Mi9ga9on Escape of GHG – Maximize u9lisa9on of CH4 (CH4 ≥ 50 %volume) – Minimize O2 levels (O2%volume)
Classified as a Clean Development Mechanism Project (“CDM”) and is expected to receive cer9fied emission reduc9on (“CER”) cer9ficates from: 1) The Collec9on and Destruc9on of methane generated from the landfill
2) The Displacement of pollu9ng fuel sources used in electricity genera9on. Expected to generate upto 130,000 tCO2e over a 10 year Credi9ng period
We are Here!
PDD • BEI
Host Country Approval
• DENR
Valida9on of Project • SIRIM QAS
Submission of Valida9on Report
and PDD
• CDM Execu9ve Board
Registra9on of CDM project
• CDM Execu9ve Board
Verifica9on and Cer9fica9on • DOE
Issuance of CERS to BEI