Download - S1160. RUK Construction Company 18001ar.ruk-sa.com/wp-content/uploads/2018/05/S1160RUK.pdf · RUK CONSTRUCTION COMPANY PO Box 276510, Riyadh 11314, Saudi Arabia Execution of Water

Transcript
Page 1: S1160. RUK Construction Company 18001ar.ruk-sa.com/wp-content/uploads/2018/05/S1160RUK.pdf · RUK CONSTRUCTION COMPANY PO Box 276510, Riyadh 11314, Saudi Arabia Execution of Water

CERTIFICATION AUDIT REPORT NUMBER

1st SURVEILLANCE AUDIT REPORT NUMBER

2nd SURVEILLANCE AUDIT REPORT NUMBER

C E R T I F I C A T E

BQC CERTIFICATION BODYCERTIFIES THAT THE COMPANY

WITH SCOPE OF CERTIFICATION

HAS DEVELOPED AND IMPLEMENTSAN OCCUPATIONAL HEALTH ANDSAFETY MANAGEMENT SYSTEM

THAT FULLY MEETS THE REQUIREMENTS OF

If the surveillance audits are not conducted according to the above deadlines, the certification of the Organization will be withdrawn and the Certificate has to be returned, since it remains a property of BQC.

The Audit Report Numbers are filled in annually after the successful completion of the Surveillance Audits and attest the continuous Conformity of the certified organization to the above Standard and the Validation of the Certificate for each designated period.

CERTIFICATE’S REGISTRATION NUMBER

RUK CONSTRUCTION COMPANY

PO Box 276510, Riyadh 11314, Saudi Arabia

Execution of Water Pipe Lines Construction

OHSAS 18001:2007

5930

____

____

300CN182975930

CERTIFICATION MANAGER

1st SURVEILLANCE AUDIT UNTIL2nd SURVEILLANCE AUDIT UNTIL

08/05/201908/05/2020

ATHENS, 08/05/2018

BQC | Certification Body | 96, D. Gounari str. & Kifissias Av., GR 15125, Μaroussi, Athens | Τ +302112213726 | [email protected] | www.bqc.gr

Certificate Validation Period from 08/05/2018 to 07/05/2019

Certificate Validation Period from 08/05/2019 to 07/05/2020

Certificate Validation Period from 08/05/2020 to 07/05/2021