Monthly provisional valuesunion for the co-ordination of transmission of electricity
September 2005
September 2005
UCTE September 2005
Table of contents 1 Page
1 Electricity supply situation of the countries 2
2 Physical energy flows 3
3 Monthly consumption 4
4 Monthly consumption variation 6
5 Consumption of the last 12 months 8
6 Variation of the last 12 months’ consumption 9
7 Load flows (night) 10
8 Load flows (day) 11
9 Unavailability of international tie lines ( major events ) 12
10 Network reliability ( major events ) 14
11 Scheduled exchanges 15
12 Load on the 3rd Wednesday 16
1 Monthly provisional values from the UCTE database as of 21 December 2005
September 2005
UCTE September 2005
1 Including deliveries from industry2 UA_W represents the so-called Burshtyn Island synchronously interconnected with UCTE
All values are calculated to represent 100% of the national values
All representativities of the national production and consumption values used to calculate values at a representativity of100% as stated in the table above
1 Electricity supply situation of the countries
2
Countries AT BA BE BG CH CS CZ DE ES FR GR HR HU IT LU MK NL PL PT RO SI SK DK_W
UA_W
ProductionTherm.nuclear 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
Fossiel fuel 100 100 100 100 100 100 100 100 100 100 100 100 100 100 98 100 100 100 96 100 100 100 100 100Hydro prod 100 100 100 100 100 100 100 100 100 100 100 100 100 100 99 100 100 100 100 100 100 100 100 100
Other renew. n.a. 100 100 100 100 100 100 100 100 100 100 100 n.a. 100 99 100 100 n.a. 100 100 100 100 100 100Not identify n.a. 100 100 100 100 100 100 100 100 100 100 100 n.a. 100 n.a. 100 100 n.a. 100 100 100 100 100 100
Consumption 100 100 100 100 100 100 100 100 98 100 100 100 100 100 99 100 100 100 97 100 95 100 100 100
2
Consumption in GWhbalance
Coun- Therm. Fossiel Hydro Other Of Not var. var.tries nuclear fuel prod renew. w hich iden- Total monthly [%]
wind tify
AT 0 1667 3159 0 0 425 5251 1 26 265 5012 -4,4 63436 -3,5BA 0 672 317 0 0 0 989 -165 0 824 3,5 11113 -2,6BE 3342 2782 111 155 9 0 6390 1 635 140 6885 -2,6 87406 -0,6BG 1225 1673 247 0 0 0 3145 -524 47 2574 3,1 35533 -0,4CH 2099 170 2808 72 0 0 5149 1 39 274 4914 5,8 62402 3,9CS 0 2087 911 0 0 0 2998 1 -56 92 2850 0,4 41352 0,0CZ 1532 3935 239 4 2 0 5710 1 -971 85 4654 1,9 62250 1,8DE 12357 25755 1868 2479 1601 0 42459 1 1391 769 43081 0,0 557308 1,6ES 5144 12075 1337 1765 1280 0 20321 1 -495 525 19301 -5,9 249561 0,4FR 33418 2888 3849 296 55 0 40451 -5731 482 34238 -0,3 479202 1,1GR 0 3542 302 69 56 0 3913 1 390 89 4214 2,1 52405 1,6HR 0 416 397 2 1 0 815 1 454 14 1255 3,9 16335 2,9HU 1035 1503 22 0 0 0 2560 1 540 0 3100 1,6 38543 0,9IT 0 20517 3455 522 130 0 24494 1 3802 687 27609 0,0 327898 1,6LU 0 272 59 6 3 0 337 276 80 533 2,1 6191 -2,5MK 0 424 51 0 0 0 475 1 62 0 537 6,1 7853 7,0NL 179 7172 0 426 103 0 7777 1 1392 0 9169 5,5 113717 2,9PL 0 11077 234 0 0 0 11311 1 -926 188 10197 1,5 129709 -2,6PT 0 2692 223 282 127 0 3197 1 725 39 3883 2,5 49117 3,9RO 283 2228 1613 0 0 0 4124 1 -192 0 3932 2,4 51853 3,3SI 480 289 309 0 0 0 1078 -18 0 1060 2,0 13034 -2,3SK 1293 399 268 0 0 183 2143 1 -168 15 1960 -1,7 26148 -1,5
UCTE 62387 104235 21779 6078 3367 608 195087 1 486 3791 191782 -0,1 2482366 1,0DK_W 0 1199 1 425 304 0 1625 1 70 0 1695 0,6 21234 n.a.UA_W 0 608 6 0 0 0 614 1 -354 0 260 -18,5 4396 1,1
in GWh [%]in GWh
Exchange Net production in GWh
last 12 months
Pump
2
September 2005
UCTE September 2005
These physical energy flows were measured on the cross-frontier transmission lines (< 110 kV) listed in table 9 of the Statistical Yearbook.These values may differ from the official statistics and the exchange balances in chapter 1.
1 Other III: Albania, Belarus, Denmark East, Great Britain, Morocco, Republic of Moldavia, Norway, Sweden and Republic of Turkey2 UA_W represents the so-called Burshtyn Island synchronously interconnected with UCTE
Total physical energy flows =Sum of physical energy flows between UCTE countries =
2 Physical energy flows
3
GWhValues in
BEDE
PL
CS
GR
FR
ESPT
SK
BA
NL
HU
CZ
CH
AT
SI
LU
HR
MK
IT
Associate member(synchronous with 1st UCTE zone)
Synchronous operationwith first UCTE region
UA_W
RO
BG
NO
SE
RU
LT
BY
MD
TR
AL
GB
DK_W
IRL
MAMA DZ TN
DK_E
148 →→←← 858
←←
114
3 →
→
56 →
713
→→
→→
→→
←←
←←
←←
← 9
1
1238 →← 36
←← 179
1735 →← 1
← 217
137 →
673 →←
120
← 41256 →
4 →→←←
294
←←← 305
→→
→→
66 →← 219
← 533←
101
421
8 →
→106 →
← 1
22140 →
74 →← 238
59 →← 72
←← 75
←← 91
104 →→
←←
412360 →
← 79
← 546 ← 4
18
← 9
9
← 328
←←
133
←← 12
55 →
→
← 606 134 →← 46
← 116
← 3
67
69 →
← 79
←←← 27
93 →→
← 5
7
← 16
4
←← 27
1135
→→
← 40
2
751 →→
← 942
985 →
← 582
← 50
←← 1007
← 5
00
← 4
81
4 →←←
801
← 4
7
←←
537
12 →
→
←←
← 1
554→
→→
20→
→→→
→→
→
6 →→
←←
156
←←
195
1
103 →
10 →←← 97
3 →
9→→
→
1→→
8 →
→
←← 24
4 →
38 →→→→→→
←←
← 3
6
←←
← 2
79←
←←
←
Im por ting countr ie sExpor ting countr ie s
A T BA BE BG CH CS CZ DE ES FR GR HR HU IT LU MK NL PL PT RO SI SKDK_
W
UA _
W 2
Other
III1
A T - - - - 606 - 2 533 - - - - 106 122 - - - - - - 134 - - - - 1503BA - - - - - 59 - - - - - 238 - - - - - - - - - - - - - 297BE - - - - - - - - - 27 - - - - 137 - 673 - - - - - - - - 837BG - - - - - 116 - - - - 367 - - - - 24 - - - 69 - - - - 0 576CH 4 - - - - - - 218 - 179 - - - 1951 - - - - - - - - - - - 2352CS - 72 - 0 - - - - - - - 328 3 - - 133 - - - 0 - - - - 12 548CZ 481 - - - - - - 1007 - - - - - - - - - 4 - - - 360 - - - 1852DE 985 - - - 1014 - 6 - - 1 - - - - 412 - 942 66 - - - - 12 - 13 3451ES - - - - - - - - - 56 - - - - - - - - 858 - - - - - 114 1028FR - - 1135 - 751 - - 1735 402 - - - - 1238 - - - - - - - - - - 713 5974GR - - - 0 - - - - - - - - - 27 - 0 - - - - - - - - 79 106HR - 74 - - - 0 - - - - - - 0 - - - - - - - 582 - - - - 656HU 50 - - - - 99 - - - - - 418 - - - - - - - 10 - 0 - 1 - 578IT 0 - - - 8 - - - - 36 38 - - - - - - - - - 0 - - - - 82LU - - 217 - - - - 56 - - - - - - - - - - - - - - - - - 273MK - - - 0 - 1 - - - - 93 - - - - - - - - - - - - - - 94NL - - 120 - - - - 103 - - - - - - - - - - - - - - - - - 223PL - - - - - - 801 219 - - - - - - - - - - - - - 156 - 0 20 1196PT - - - - - - - - 148 - - - - - - - - - - - - - - - - 148RO - - - 57 - 164 - - - - - - 97 - - - - - - - - - - 0 0 318SI 46 - - - - - - - - - - 140 - 546 - - - - - - - - - - - 732SK - - - - - - 79 - - - - - 500 - - - - 0 - - - - - 104 - 683DK_W - - - - - - - 537 - - - - - - - - - - - - - - - - 4 541UA _W2 - - - - - - - - - - - - 412 - - - - 91 - 47 - 0 - - - 550Other III1 - - - 0 55 - - 434 3 91 0 - - - - - - 111 - 0 - - 599 - - 1293 Sum im p 1566 146 1472 57 2379 494 888 4842 553 390 498 1124 1118 3884 549 157 1615 272 858 126 716 516 611 105 955 25891
Sum e xpor t
25891GWh22439GWh
2 →
→
1 →
←←
←←
September 2005
UCTE September 2005
All values are calculated to represent 100% of the national values
3 Monthly consumption
4
TWh
I II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII2004 2005
60TWh
30
0I II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII
2004 2005
TWh
I II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII2004 2005
200
150
250
CH
AT
NL
BE
PT
DE
FRIT
ESPL
UCTE
6,0
3,0
12,0
9,0
September 2005
UCTE September 2005
All values are calculated to represent 100% of the national values
1 UA_W represents the so-called Burshtyn Island synchronously interconnected with UCTE
3 Monthly consumption
5
TWh
I II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII2004 2005
TWh
I II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII2004 2005
TWh
I II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII
7,5
BA
HR
MK
UA_W 1
DK_W
BG
SK
SI
CS
LU
1,1
0
2,2
CZ
RO
GR
HU
5,0
2,5
1,0
2,0
3,0
4,0
5,0
0
September 2005
UCTE September 2005
All values are calculated to represent 100% of the national values
Monthly consumption variation4
6
2004 2005 Values in %
10UC 0TE -10
I II III IV V VI VII VIII IX X XI XII
20 10
0 0
AT -20 -10 CZI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII
30 15
0 0
BA -30 -15 DEI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII
10 15
0 0
BE -10 -15 ESI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII
15 30
0 0
BG -15 -15 FRI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII
10 10
0 0
CH -10 -10 GRI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII
15 10
0 0
CS -15 -10 HRI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII
September 2005
UCTE September 2005
All values are calculated to represent 100% of the national values
1 UA_W represents the so-called Burshtyn Island synchronously interconnected with UCTE
Monthly consumption variation4
7
2004 2005 Values in %
15
0
HU -15 PTI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII
15
0 0
IT -15 ROI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII
10
0
LU -10 SII II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII
10
0
MK -10 SKI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII
15
0
NL -15 DK_WI II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII
50
0
PL -50 UA_W1
I II III IV V VI VII VIII IX X XI XII I II III IV V VI VII VIII IX X XI XII
0
10
-10
10
-10
0
10
-20
0
20
-10
0
10
-10
0
15
-15
September 2005
UCTE September 2005
All values are calculated to represent 100% of the national values
1 UA_W represents the so-called Burshtyn Island synchronously interconnected with UCTE
Consumption of the last 12 months5
8
TWh
1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11
2000 2001 2002 2003 2004 2005
TWh
1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11
2000 2001 2002 2003 2004 2005
TWh
1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11
2000 2001 2002 2003 2004 2005
TWh
1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11
2000 2001 2002 2003 2004 2005
TWh
1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11
2000 2001 2002 2003 2004 2005
TWh
1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11 1 3 5 7 9 11
2000 2001 2002 2003 2004 2005
10
40
70
HU
CZ
HR
SK
RO
1800
2600
UCTE
0
300
600DE
FRIT
ESPL
NL
25
50
75
100BE
CHAT
GR
0
25
50
PT CS
SI
BG
MK
0
7
14
LU
BA
UA_W 1
September 2005
UCTE September 2005
1 JIEL = FRY + FYROM (Federal Republic of Yugoslavia and former Yugoslav Republic of Macedonia)
All values are calculated to represent 100% of the national values
Variation of the last 12 months´consumption in %6
9
UCTE2000 2001 2002 2003 2004 2005
AT HU2000 2001 2002 2003 2004 2005 2000 2001 2002 2003 2004 2005
BE IT2000 2001 2002 2003 2004 2005 2000 2001 2002 2003 2004 2005
CH LU2000 2001 2002 2003 2004 2005 2000 2001 2002 2003 2004 2005
CZ NL2000 2001 2002 2003 2004 2005 2000 2001 2002 2003 2004 2005
DE PL2000 2001 2002 2003 2004 2005 2000 2001 2002 2003 2004 2005
ES PT2000 2001 2002 2003 2004 2005 2000 2001 2002 2003 2004 2005
FR SI2000 2001 2002 2003 2004 2005 2000 2001 2002 2003 2004 2005
GR SK2000 2001 2002 2003 2004 2005 2000 2001 2002 2003 2004 2005
HR JIEL1
2000 2001 2002 2003 2004 2005 2000 2001 2002 2003 2004 2005
-5
0
5
10
-5
0
5
10
-5
0
5
10
-5
0
5
10
-5
0
5
10
-10
0
10
-5
0
5
10
-15
0
15
-5
0
5
10
-5
0
5
10
-5
0
5
10
-10
-5
0
5
-5
0
5
10
-5
0
5
10
-5
0
5
10
15
-10
-5
0
5
-5
0
5
10
-5
0
5
10
-10
0
10
20
AT
CH
ES
IT
FR
SI
BA
CS
HU
CZ
SK
LU
BE
NL
GB
DK
_W
DE
PL
SE
RU
SLT BY
UA
_W
AL
GR
BG
RO
PT MA
HR
MK
MD
TR
* Central European Time ( CET )I = Import balanceE = Export balance
MA
Associate member
Synchronous operation with first region
NO
DK
_E
Sum of load flows in MW:
UCTE = 30434 MW Total = 35155 MW
September 20057
10UCTE September 2005
Load flows (night) on 21.09.05 at 03:00* in MW
E =
587
I = 5
39
1271
543
235
107
399
121
181
170
47261
81
73
3
2727
68
6
460
176
4011508
4526
1
2088
1670
1401
842
93
425
74
1453
1174
1605
1284
562
1677
1552
146
905
212
641
44328
170
67
501
771
141
44
57
140
483463
12
134
1012
283
472
108
46112
1
E =
461
E =
146
E =
79
E =
1161
E =
1355
E =
995
I = 3
4
E =
232
I = 4
92
I = 6
95
E =
7683
E =
924
I = 1
409
I = 2
109
I = 3
2I =
518
0
I = 4
47
I = 5
68
I = 7
98
E =
188
E =
672
I = 1
743
311
3
113 56
775
423 16
1
26
302
AT
CH
ES
IT
FR
SI
BA
CS
HU
CZ
SK
LU
BE
NL
GB
DK
_W
DE
PL
SE
RU
SLT BY
UA
_W
AL
GR
BG
RO
PT MA
HR
MK
MD
TR
* Central European Time ( CET )I = Import balanceE = Export balance
MA
Associate member
Synchronous operation with first region
NO
DK
_E
Sum of load flows in MW:
UCTE = 32967 MW Total = 36471 MW
September 20058
11 UCTE September 2005
Load flows (day) on 21.09.05 at 11:00* in MW
E =
1896
E =
359
I = 9
92
E =
902
E =
1670
E =
119
E =
1093
I = 5
531
E =
438E
= 80
31
I = 4
96
I = 5
28
I = 1
252
I = 6
128
I = 3
68
I = 1
35
I = 2
249
E =
1493
I = 9
63
E =
122
E =
88
E =
333
E =
756
39
702
1215
404
148
404
446
260
1656
317
564
121
594
430
2695
40
408
225
393
1654
286
608
572
564
1098
1098
8131
1282
2585
775
2434
631
2112
148
109
4793
9
322
50
32113
5
6
137
2
502
1153
147
319
171211
220263
338
1127
4653
523206
29
96
520
20 E =
388
203
503
63
47
12296
24
210
0,5 mm 2,0 mm 2,5 mm1,5 mm1,0 mm
20.02.01 08:21 AM21.02.01 08:29 AM22.02.01 10:03 AM23.02.01 08:27 AM
UCTE September 2005UCTE September 20051212
Unavailability of international tie lines( major events with sum over 4330 minutes ) 9 9 September 2005
Reasons :
DK_W
ES
PTMA
FR
GB
BE LU
NL
DE
01.09.05 00:00 AM R1
81.2.1FR/Sierentz - CH/Laufenburg 380 kV / 1167 MVA
22445 min
CH
NO
Ensted
01.09.05 00:00 AM R1
121.4.1CH / Lavorgo - IT / Musignano 380 kV / 1118 MVA
12423 min
R1 - MaintenanceR2 - RepairR3 - New constructions R4 - Overload (also calculated break)R5 - False operation R6 - Failure in prodection device or other element R7 - Outside impacts (animals, trees, fire, avalanches, ...)R8 - Very exceptional conditions (weather, natural disaster, ...) R9 - Other reasonsR10 - Unknown reasons
01.09.05 00:00 AM R6
164.1.1NO / Kristiansand - DK_W / Tjele 350 MVA
43200 min
01.09.05 00:01 AM R1
192.2.1LU / Heisdorf - DE / Quint- 220 kV / 490 MVA
19902 min
S.Fiorano
124
Gorlago
03.09.05 06:40 AM R104.09.05 06:46 AM R110.09.05 07:03 AM R111.09.05 06:51 AM R122.09.05 06:23 AM R1
192.1.1LU / Heisdorf - DE / Trier 220 kV / 490 MVA
14210 min
26.09.05 08:13 AM R1
82.1.2FR/Bois-Tollot - CH/Chamoson 380 kV / 1409 MVA
6706 min
19.09.05 07:40 AM R1
161.1.1DK_W / Ensted - DE / Flensburg 220 kV / 305 MVA
16819 min
12.09.05 06:36 AM R1
161.2.1DK_W / Kassø - DE / Flensburg 220 kV / 305 MVA
9145 min
05.09.05 06:59 AM R1
161.3.1DK_W / Kassø - DE / Audorf 380 kV / 658 MVA
9079 min
28.09.05 07:46 AM R115.09.05 06:46 AM R9
121.1.1CH / Airolo - IT / Ponte 220 kV / 257 MVA
6074 min
01.09.05 00:00 AM R1
103.1.2DE / Tiengen - CH / Beznau 220 kV / 335 MVA
12247 min11.09.05 01:50 AM R128.09.05 07:21 PM R1
221.1.1GB/Sellindge - FR/Mandarins 270 kV / 1000 MVA
8249 min
01.09.05 00:00 AM R1
103.1.1DE / Tiengen - CH / Beznau 380 kV / 1158 MVA
31291 min
05.09.05 07:01 AM R106.09.05 07:07 AM R107.09.05 07:00 AM R108.09.05 07:01 AM R112.09.05 07:10 AM R113.09.05 07:17 AM R114.09.05 07:10 AM R115.09.05 07:17 AM R1
25.1.1NL/Maasbracht - BE/Gramme 380 kV / 1207 MVA
4332 min
26.09.05 07:00 AM R1
94.1.1FR / Lucciana - IT / Suvereto 220 kV / 300 MVA
6779 min
0,5 mm 2,0 mm 2,5 mm1,5 mm1,0 mm
20.02.01 08:21 AM21.02.01 08:29 AM22.02.01 10:03 AM23.02.01 08:27 AM
Unavailability of international tie lines( major events with sum over 4330 minutes ) 9 9 September 2005
UCTE September 2005UCTE September 2005 1313
Reasons : R1 - MaintenanceR2 - RepairR3 - New constructions R4 - Overload (also calculated break)R5 - False operation R6 - Failure in prodection device or other element R7 side impacts animals, trees, fire, avalanches, ...)-
-Out (
R8 Very exceptional conditions (weather, natural disaster, ...) R9 - Other reasonsR10 - Unknown reasons
DECZ
BY
SK
HU
RO
HR
01.09.05 00:00 AM R9
391.2.1 CS/Kosovo A - MK/Skopje1 220 kV / 311 MVA
43200 min
SI
AT
AL
GR
SE
IT
MK
BG
01.09.05 00:00 AM R9
391.1.1 CS/Kosovo A - MK/Skopje1 220 kV / 311 MVA
43200 min
CS
711
420
PL
460
DK_W
13.09.05 06:00 AM R1
752.1.1RO/Tutora - MD/Ungheni 110 kV / 90 MVA
4860 min
27.09.05 06:41 AM R1
430.1.1 CZ/Sokolnice - SK/Stupava 400 kV / 831 MVA
5293 min
450
UA_W
BA
26.09.05 06:40 AM R1
401.1.1 SE/Kruseberg - DE/Herrenwyk 450 kV / 600 MVA
6407 min
700700
01.09.05 00:00 AM R1
704.1.1 SE / Stärnö - PL / Slupsk 450 kV / 600 MVA
6294 min
01.09.05 06:26 AM R102.09.05 06:15 AM R103.09.05 06:07 AM R104.09.05 06:10 AM R105.09.05 06:05 AM R106.09.05 06:15 AM R107.09.05 06:16 AM R108.09.05 06:18 AM R109.09.05 06:10 AM R110.09.05 06:09 AM R118.09.05 06:46 AM R1
271.1.1CS / Niš - BG / Sofija Zapad 380 kV / 1264 MVA
8241 min
12.09.05 07:34 AM R1
410.1.1 CZ/Liskovec - SK/P.Bystrica 220 kV / 269 MVA
6039 min
410430
17.09.05 00:08 AM R124.09.05 00:15 AM R1
702.1.1 PL/Zamosz - UA_W/Dobrotwor 220 kV / 309 MVA
5713 min
12.09.05 06:09 AM R1
740.1.1 RO/Rosiori - UA_W/Mukacevo 400 kV / 693 MVA
6626 min
19.09.05 06:15 AM R1
722.1.1 HU/Kisvárda - UA_W/Mukacevo 220 kV / 305 MVA
16904 min
12.09.05 08:22 AM R125.09.05 02:13 PM R10
710.1.1 SK / Gabcikovo - HU / Györ 400 kV / 1386 MVA
20869 min
710
01.09.05 00:01 AM R1
275.2.1RO/Isaccea - BG/Dobrodja 400 kV / 1700 MVA
13859 min
24.09.05 07:00 AM R1
241.1.1 MK/Dubrovo - GR/Thessaloniki 400 kV / 700 MVA
9659 min
24.09.05 07:00 AM R1
242.1.1 MK / Bitola - GR / Amynteo 150 kV / 1100 MVA
9659 min
17.09.05 06:28 AM R124.09.05 06:27 AM R128.09.05 07:59 AM R129.09.05 08:14 AM R1
111.2.1 DE / Herbertingen - AT / Bürs 220 kV / 3889 MVA
11186 min
September 2005
UCTE September 2005
1 ( year [in min] * energy not supply ) / consumption last 12 months
Reasons:R4 Overload (also calculated break) R8 Very exceptional conditionsR5 False operation (weather, natural disaster, ...)R6 Failure in protection device or other element R9 Other reasonsR7 Outside impacts (animals, trees, fire, avalanches, ...) R10 Unknown reasons
(animals, trees, fire, avalanches, ...)
Network reliability ( major events )10
14
Nbr Country Substation Reason Energy not supplied Total loss of power Restoration Equivalent time [ MWh ] [ MW ] time [ min ] of interruption1
1 FR Gien R5 13 20 40 0,01
2 FR Roubaix Nord R9 11 72 18 0,01
3 FR Cretaine R9 10 45 13 0,01
4 SK Medzibrod R9 10 95 6 0,20
BEDE
PL
CS
GR
FR
ESPT
SK
BA
NL
HU
CZ
CH
AT
SI
LU
HR
MK
IT
UA_W
RO
BG
DK_W
1
2
3
4
September 2005
UCTE September 2005
- Control areas can differ from national borders ( i.e. German block which includes parts of AT, LU and DK ).
- Values are calculated on an hourly base ( MWh ).
- This values are not the provisional values entered in the VULCANUS system, but the definitive values afteran eventual correction during the actual date.
- Export Programs: Sum of all positive values of every hour of every border- Import Programs: Sum of all negative values of every hour of every border
- Export Programs at 03:00: Sum of all positive values the third Wednesday from 02:00 to 03:00 a.m.- Import Programs at 03:00: Sum of all negative values the third Wednesday from 02:00 to 03:00 a.m.
- Export Programs at 11:00: Sum of all positive values the third Wednesday from 10:00 to 11:00 a.m.- Import Programs at 11:00: Sum of all negative values the third Wednesday from 10:00 to 11:00 a.m.
1 UA_W represents the so-called Burshtyn Island synchronously interconnected with UCTE
15
11 Scheduled exchanges in MWh
Control Export Import Export Import Export Importarea Programs Programs Programs Programs Programs Programs
at 03:00 at 03:00 at 11:00 at 11:00
AT 896573 852149 640 1126 932 2908BA 91889 23051 284 85 396 35BE 320338 875565 861 1200 261 1200BG n.a. n.a. n.a. n.a. n.a. n.a.CH 2258851 2297899 2755 4093 4321 3002CS 396461 341099 625 386 802 658CZ 1749961 724052 2158 907 2595 1410DE 2370374 3108554 3314 2258 2240 6818ES 911392 403347 1507 550 1107 522FR 7105022 1533895 10503 2753 8997 981GR 26935 421957 0 867 100 597HR 148756 609145 250 809 246 760HU 419051 959193 651 1103 492 1736IT 82467 3884401 346 5526 50 6178
MK 9100 76100 127 162 63 166NL 414024 1801469 368 2467 437 2682PL 1042653 139186 1111 155 1700 215PT 14007 738186 0 1398 0 999RO 372249 188544 388 310 645 242SI 579398 568623 843 682 851 736SK 563515 361899 769 275 754 620
DK_W 499441 615058 397 960 995 960UA_W 353702 0 423 0 493 01
September 2005
UCTE September 2005
1 Percentage as referred to total values in %
2 Variation as compared to corresponding month of the previousyear
3 Power produced in parallel operation (including autoproduction)
4 Values estimated on the basis of the vertical load. The verticalload is the total amount of the power flows out of the transmissionnetwork into distribution and large consumer networks.
5 UA_W represents the so-called Burshtyn Islandsynchronously interconnected with UCTE
All values are calculated to represent 100% of the national values
Load on the 3rd Wednesday
16
12
Load Parallel
MW var.%2 % MW
AT 7506 -20,9 100 10002BA 1487 4,6 100 1691BE 11259 -0,4 100 10124BG 4301 0,3 100 4859CH 8605 1,3 100 10524CS 5112 1,6 100 4692CZ 7782 3,3 100 9103
DE 4 75714 0,6 91 74500ES 39126 12,9 98 35983FR 56394 1,1 100 64459GR 7193 -2,3 100 6311HR 2279 6,1 100 1766HU 5556 4,2 100 4045IT 34004 -30,7 100 26972LU 919 5,0 99 916MK 930 5,6 100 716NL 14543 1,8 100 12119PL 18290 4,4 100 18253PT 6745 4,1 97 5305RO 6590 7,9 100 6431SI 1958 9,3 95 1865
SK 3435 -1,3 100 3364UCTE 310923 -3,5 314000DK_W 3053 3,7 100 3191
UA_W 5 619 -11,8 100 1033
pow er3Peak load representativity1
Consumption hourly load curves1 on 21.09.2005 Values in GW
( C E T ) ( C E T )
( C E T ) ( C E T )
( C E T )
0 2 4 6 8 10 12 14 16 18 20 22 h4
8
12
16
NLBE
CZ
GR
0
3
6
9
HUSK
AT
MK
CH
0
2
4
6
8
SI
PT
LU
BG
DK_W
0 2 4 6 8 10 12 14 16 18 20 22 h
0 2 4 6 8 10 12 14 16 18 20 22 h 0 2 4 6 8 10 12 14 16 18 20 22 h
0
20
40
60
80
DE4
FR
ES
PL
IT
0
2
4
6
8
UA_W 5
RO
BA
CSHR
0 2 4 6 8 10 12 14 16 18 20 22 h
ContactBoulevard Saint-Michel, 15
B-1040 Brussels – Belgium
Tel + 32 2 741 69 40 – Fax + 32 2 741 69 49
info @ ucte.org
www.ucte.org