Roof Asset Management Program
Mike GinderHoneywell FM&T
Manager, Facilities Projects
October 18, 2006
2
Roof Asset Management Program
• Roof Asset Management ProgramIntegrated Multi Site team that uniquely combines resources from Headquarters, Site Office Management, and M&O contractors to provide a corporate management approach utilizing consistent set of criteria to manage the NWC roofing assets
Implements standard industry processes and best management practices across NWC Allows HQ to manage the NWC roofing portfolio at a
“corporate level” Provide HQ a prioritized list of roofing needs across the NWC
3
Roof Asset Management Program
• Historically, roofing assets at NWC sites were not adequately supported due to limited funding and perceived higher priority needs
• Roofing requirements exceed available funding HQ had difficulty determining the highest funding priorities Sites competed for limited resources for roofing needs Focus on roofing assets varied significantly from site to site Most sites used one or two roofing subcontractors Reactive rather than proactive mindset Little focus on roof life extension
4
Roof Asset Management Program
• FY 2002 Pilot Program
Assessed roof areas of 3 NNSA sites Proffered a design and construction approach to the 3 sites
(KCP, Pantex, Y-12) At each site, demonstrated clear paths to roof life extension
through selected repair and replacement of critical roof areas Predicted cost avoidances from current roofing practices
through life extensions
• Pilot Program proved successful BTA successfully performed work at 3 NNSA sites Demonstrated cost avoidances associated with life
extensions Lessons learned were incorporated Shared results throughout the NWC
5
Roof Asset Management Program
• FY2003 Developed contracting methodology M&Os partnered with world class roof management
contractor-Building Technology Associates (BTA) Effectively incorporated terms and conditions of the
different M&Os into the contract language with BTA necessary to do work at each site.
• FY2004 Expand RAMP from 3 to 6 sites to include LANL,
LLNL, and NTS
6
Roof Asset Management Program
BTA program objectively assesses and evaluates current roof conditions while identifying the optimal strategies for budgeting and planning. BTA’s primary goal is maximizing the life of roof systems.
• Used recognized industry expert (BTA) to establish a complex-wide prioritized list based on:
Financial analysis of roof asset Prioritization against critical mission need and condition Uniform criteria across the complex
• Developed comprehensive NWC database
Over 16 Million Square Feet Managed 4,660 separate roof areas Total estimated replacement value of all roofs - $346M
7
Roof Asset Management Program
R. Dino HerreraNNSA/HQ
Kansas City PlantDan GehrkeJoseph Cerv
Bob Schmidt, KCSO
Pantex PlantMike Bromley
Bob RothJohnnie Guelker, PSO
Y-12 PlantMike Richesin
David LindBob Edlund, YSO
Nevada Test SiteGreg MitchemSusan Livenick
Gerry Babero, NSO
LANLDavid Chavez
Jayson BlanchardRon McMahan, LASO
LLNLRich Shonfeld
Fred GlaskiFrank Porto, LLSO
Honeywell FM&TDebi Stumpff
Ron BergesonMike GInder
Multi-Site Team(Sites and BTA)
Bob SchmidtNNSA/KCSO
8
Roof Asset Management Program
Funding Profile5-Year, $50M Program
FY04 - $5.4MFY05 - $15.M FY06 - $6M * FY07 – Anticipate $10MFY08 – Anticipate $10M
* FY06 funding prior to budget cuts was $10M
HQ has committed to fund RAMP an additional 3 years through FY11
9
Roof Asset Management ProgramTotal Square Footage Replaced
Site FY04 Square Footage
Replaced
FY05 Square Footage
Replaced
FY06 Square Footage
Replaced
Total
Square Footage Replaced
KCP - 217,211 67,213 284,424
Pantex 72,100 22,882 62,058 157,040
Y-12 14,069 36,086 19,120 69,275
NTS - 124,989 24,261 149,250
LLNL - 1,996 16,724 18,720
LANL - 66,268 *148,071 214,339
TOTAL 86,169 469,432 337,447 893,048
*Includes FY05-funded CMR areas to be completed in 2006 (30,105 sq. ft.)
10
Roof Asset Management ProgramFY06 Square Footage Replaced
Site FY06 Square Footage Replaced
(RAMP Funded)
FY06 Square Footage Replaced
(FIRP Funded)
Total
FY06 Square Footage Replaced
KCP 27,118 40,095 67,213
Pantex 11,125 50,933 62,058
Y-12 19,120 - 19,120
NTS 24,261 - 24,261
LLNL 16,724 - 16,724
LANL *96,981 51,090 148,071
TOTAL 195,329 142,118 337,447
*Includes FY05-funded CMR areas to be completed in 2006 (30,105 sq. ft.)
11
RAMP Integrated Metrics
Optimal RepairsImmediate Return
Construction CostExecution
Remaining LifePortfolio Health
Construction QualityTechnical Excellence
Safety PerformanceWorking Safely
Schedule/Earned Value
Execution
Roof Asset Management Program
12
Roof Asset Management Program
Optimal Repairs• Repairs that extend the remaining roof life• Expressed as value added to the portfolio• Example –
– Replacement cost of roof area estimated at $1M– Assuming 20 year life, depreciates by $50K per year– Optimal repairs will extend the life by 5 years– Cost of optimal repairs - $30K– Value added to the portfolio –
(5 year life extension x $50K) less $30K (cost of repairs) $220K value added to the portfolio
13
Roof Asset Management Program
Optimal Repairs – Value Added to the Portfolio ($K)
FY04 FY05 FY06 TOTAL
KCP $1,528 $1,987 $ 583 $ 4,098
Pantex 79 57 136
Y-12 391 1,250 29 1,670
LANL 930 424 1,354
LLNL 502 208 710
NTS _____ 180 180
TOTAL $1,998 $4,906 $1,244 $ 8,148
14
Roof Asset Management Program
Historic Roofing Costs Compared to RAMP Costs
* Work in Rad-Con and/or High Security Areas which results in higher costs; Pantex FY06 work also includes asbestos abatement.
Inflation Adjusted Historic Costs (FY06 dollars)KCP Y-12 Pantex LANL LLNL NTS
FY01 $25.98 $35.83 $21.18 No Data $20.15 No DataFY02 $28.16 $16.92 $18.59 $31.31 $18.80 No DataFY03 $25.34 $27.80 $19.25 No Data $18.36 $21.923 Year Average $26.51 $24.69 $19.59 $31.31 $19.41 $21.92FY04 Repairs $21.69 $21.34 No Work No Work No WorkFY05 $18.73 * $42.45 * $33.11 $18.83 Repairs $17.61FY06 $17.72 $18.81 * $52.61 $23.51 $21.16 $15.59
15
Roof Asset Management Program Remaining Roof Life
Site Start of FY04
End of FY04
Start of FY05
End of FY05
Start of FY06
End of FY06
KCP 4.38 5.14 4.63 6.75 6.57 7.40
Y-12 9.54 9.79 9.17 9.77 8.91 9.08
Pantex 9.41 9.93 10.49 10.55 10.59 11.17
LANL - - 7.53 8.12 7.16 7.72
LLNL - - 6.80 7.14 7.72 7.94
NTS - - 7.14 7.21 7.64 8.09
All Sites - - 7.82 8.43 8.11 8.59
16
17
Zero Injuries in FY06. 47,000 safe hours.
Total Incident Rate (TIR) & Lost Workday Case Rate (LWCR)• TIR is OSHA reportable injuries per 200,000 hours worked.• LWCR is lost workday injuries per 200,000 hours worked. • 199,292 hours worked in FY04, FY05, & FY06.• Three reportable incidents. One Lost Workday Case.
National Average
Roofing
National Average
General Construction
RAMP
TIR 9.5 6.4 3.0
LWDC 4.0 2.4 1.0
Roof Asset Management Program
18
• Full and open competition was achieved at all sites. This competitive bid environment was evidenced in the quality and value of the contracts.
• RAMP has brought new, qualified roofing contractors to each of the 6 sites. Many of the bidders have the opportunity to bid on all 6 contracts. Sites are benefiting from the opportunity to develop relationships with new roofing subcontractors.
• Successes, failures, and lessons learned are shared among the sites through BTA as well as networking with other sites.
• Sites have developed relationships with technical points of contact at other sites.
• RAMP costed > 80% of available funding in FY05, FY06 significantly exceeding the 63% goal
Roof Asset Management Program Accomplishments
19
Roof Asset Management Program Summary
• Developed approach that manages NNSA’s roof assets from a corporate perspective instead of 6 different site views
• RAMP program requires executive leadership to manage• Program is an imbedded component of NNSA’s corporate
facilities management process• NNSA sites are together making decisions in the best interests
of the “corporation”• Obtaining high percentage of dollars into physical repair/roof
replacement Minimal burden costs (20% on first million dollars only)
• Effectively using RAMP dollars by making sound decisions to optimize and extend roof life across the complex
• Selection of BTA was a sound choice – demonstrated performance
Top Related